View Case Filings for: 2025-00257
Service Type:Electric
Filing Date:8/29/2025
Category:Regular
Utilities:
Kentucky Power Company
Electronic Case
ELECTRONIC APPLICATION OF KENTUCKY POWER COMPANY FOR (1) A GENERAL ADJUSTMENT OF ITS RATES FOR ELECTRIC SERVICE; (2) APPROVAL OF TARIFFS AND RIDERS; (3) APPROVAL OF CERTAIN REGULATORY AND ACCOUNTING TREATMENTS; AND (4) ALL OTHER REQUIRED APPROVALS AND RELIEF
| Scheduled | |
|---|---|
| 01/13/2026 | Formal Hearing |
| 01/08/2026 | Public Meeting |
| Case Filings | |
|---|---|
| Filing | Documents |
|
12/22/2025 6:14:15 PM
Kentucky Power Companys Rebuttal Testimonies Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/22/2025 10:37:41 AM
Kentucky Power Company’s Motion For The Preparation Of A Stenographic Transcription Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/19/2025 1:51:17 PM
Witness List and Motion of Joint Intervenors to Allow Virtual Participation Byron L. Gary Joint Intervenors |
|
|
12/18/2025 1:34:14 PM
KYSEIA Witness List David Spenard Kentucky Solar Industries Association, Inc. |
|
|
12/16/2025 3:02:23 PM
Data Request |
|
|
12/16/2025 9:42:51 AM
Notice of Filing of Proof of Newspaper Publication of Hazard Local Public Comment Meeting Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/15/2025 10:22:37 AM
Witness List J. Michael West Attorney General |
|
|
12/12/2025 3:44:23 PM
Order Entered: 1. Kentucky Power’s motion for an informal conference is granted. 2. An informal conference is scheduled on December 15, 2025, at 2 p.m. Eastern Standard Time and Commission Staff will contact participants by electronic mail to provide details for joining the conference by video link. 3. If determined necessary by Commission Staff, the informal conference may be continued, in-person with an option for virtual attendance, on December 17, 2025, beginning at 9 a.m. Eastern Standard Time, at the Commission’s offices at 211 Sower Boulevard, Frankfort, Kentucky. If held, Commission Staff will contact participants by electronic mail to provide details for joining the conference by video link. |
|
|
12/10/2025 4:39:39 PM
Kentucky Power Company’s Motion For Informal Conference Lerah Kahn Kentucky Power Company |
|
|
12/8/2025 6:15:42 PM
Responses of Joint Intervenors to Kentucky Power Company’s First Request for Information Byron L. Gary Joint Intervenors |
|
|
12/8/2025 5:58:16 PM
Responses of Joint Intervenors to Commission Staff’s First Request for Information Byron L. Gary Joint Intervenors |
|
|
12/8/2025 4:05:51 PM
Order Entered: 1. The motion is granted. 2. Mr. Barnes is authorized to participate virtually at the January 13, 2026 hearing, and any date thereafter, so long as the hearing is continued. 3. Commission Staff shall coordinate with the parties to ensure Mr. Barnes provided a link for remote participation. |
|
|
12/8/2025 4:04:07 PM
Attorney General and Kentucky Industrial Utility Customers Responses to Kentucky Power Company’s First Data Requests and Commission Staff’s First Request for Information Michael Lawrence Kurtz Attorney General and Kentucky Industrial Utility Customers |
|
|
12/8/2025 4:02:54 PM
Order Entered: 1. The motion is granted. 2. Mr. Baudino is authorized to participate virtually at the January 13, 2026 hearing, an any date thereafter, so long as the hearing is continued. 3. Commission Staff shall coordinate with the parties to ensure Mr. Baudino is provided a link for remote participation. |
|
|
12/8/2025 1:32:31 PM
KYSEIA Response to Commission Staffs First Request for Information David Spenard Kentucky Solar Industries Association, Inc. |
|
|
12/8/2025 1:28:22 PM
KYSEIA Response to Kentucky Power Company Data Requests David Spenard Kentucky Solar Industries Association, Inc. |
|
|
12/5/2025 11:54:14 AM
Kentucky Power Company’s December 5, 2025 Supplemental Response to Commission Staff’s First Set of Data Requests, Item 14 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/4/2025 10:56:54 AM
Kentucky Power Company’s Notice of Filing of Request For Publication Of Notice Of Hearing Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/2/2025 3:35:54 PM
Kentucky Power Company’s December 2, 2025 Supplemental Response to Commission Staff’s First Set of Data Requests, Item 3 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
12/2/2025 12:40:25 PM
Kentucky Power Company’s Application Section II Filing Requirements Exhibit S December 2, 2025 Supplement Marilyn Michelle Caldwell Kentucky Power Company |
|
|
11/26/2025 1:37:08 PM
Kentucky Power Company’s Data Requests to the Appalachian Citizens Law Center, Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association. Lerah Kahn Kentucky Power Company |
|
|
11/26/2025 1:31:55 PM
Kentucky Power Company’s Data Requests to the Kentucky Solar Industries Association Lerah Kahn Kentucky Power Company |
|
|
11/26/2025 1:27:20 PM
Kentucky Power Company’s Data Requests to the Attorney General of the Commonwealth of Kentucky and Kentucky Industrial Utility Customers, Inc. Lerah Kahn Kentucky Power Company |
|
|
11/25/2025 3:39:42 PM
Data Request |
|
|
11/25/2025 3:32:40 PM
Data Request |
|
|
11/25/2025 3:26:23 PM
Data Request |
|
|
11/25/2025 1:53:10 PM
20251125_PSC Notice of Filing of Public Comment Meeting Sign In Attendance List.pdf |
|
|
11/19/2025 4:37:19 PM
Notice of Filing of Proof of Newspaper Publication of Pikeville Local Public Comment Meeting Marilyn Michelle Caldwell Kentucky Power Company |
|
|
11/18/2025 11:08:02 AM
KYSEIA Motion to Allow Remote Testimony David Spenard Kentucky Solar Industries Association, Inc. |
|
|
11/18/2025 9:28:44 AM
Motion for Leave for Remote Witness Participation J. Michael West Office of the Attorney General |
|
|
11/17/2025 6:50:57 PM
Direct Testimony of Roger D. Colton on Behalf of Joint Intervenors Byron L. Gary Joint Intervenors |
|
|
11/17/2025 4:53:12 PM
Order Entered: 1. A hearing in this matter shall be held on January 13, 2026, at 9 a.m. Eastern Standard Time and continuing until called from the bench by the presiding officer, in the Richard Raff Hearing Room at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Pursuant to 807 KAR 5:001, Section 2, if the hearing is not concluded on the designated day, the hearing may be continued upon verbal announcement by the presiding officer. A verbal announcement made by the presiding officer shall be proper notice of the continued hearing. 3. Witnesses who sponsor schedules, testimony, or responses to requests for information shall participate in person at the hearing. 4. At the hearing in this matter, neither opening statements nor summarization of direct testimonies shall be permitted. 5. All parties shall file a witness list at least 14 days prior to the hearing date. |
|
|
11/17/2025 3:16:52 PM
Expert Witness Testimony of AG/KIUC J. Michael West Office of the Attorney General |
|
|
11/17/2025 2:31:17 PM
KYSEIA Intervenor Testimony David Spenard Kentucky Solar Industries Association, Inc. |
|
|
11/17/2025 11:35:57 AM
Direct Testimony of AG/KIUC Witnesses J. Michael West Office of the Attorney General |
|
|
11/11/2025 3:49:55 PM
KYSEIA Notice of Witness Non-Availability David Spenard Kentucky Solar Industries Association, Inc. |
|
|
11/7/2025 4:52:46 PM
Kentucky Power Company’s November 7, 2025 Supplemental Response to AG-KIUC’s September 29, 2025 data request 1-64. Lerah Kahn Kentucky Power Company |
|
|
11/7/2025 2:53:50 PM
Statement of Joint Intervenors Regarding Joint Participation Byron L. Gary Joint Intervenors |
|
|
11/5/2025 3:27:24 PM
Notice of witness non-availability Lerah Kahn Kentucky Power Company |
|
|
11/4/2025 10:53:24 AM
Order Entered: 1. Kentucky Power’s motion to deviate from 807 KAR 5:001, Section 8, is granted. 2. Kentucky Power is instructed to provide a copy of the subject materials to all parties to this matter on a physical USB drive, if requested. |
|
|
11/3/2025 3:34:57 PM
Kentucky Power Company’s Responses to AG-KIUC’s October 23, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
11/3/2025 3:05:30 PM
Kentucky Power Companys responses to Joint Intervenors second set of data requests dated October 23, 2025. Lerah Kahn Kentucky Power Company |
|
|
11/3/2025 2:54:53 PM
Kentucky Power Companys responses to KYSEIAs second set of data requests dated October 23, 2025. Lerah Kahn Kentucky Power Company |
|
|
11/3/2025 2:47:48 PM
Kentucky Power Companys responses to Staffs third set of data requests dated October 23, 2025 Lerah Kahn Kentucky Power Company |
|
|
11/3/2025 2:37:34 PM
Kentucky Power Company’s November 3, 2025 Supplemental Response to Commission Staff’s First Set of Data Requests, Item 14 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
11/3/2025 11:58:00 AM
Order Entered: 1. Kentucky Power’s motion to deviate from 807 KAR 5:001, Section 8, is granted. 2. Kentucky Power is instructed to provide a copy of the subject materials to all parties to this matter on a physical USB drive, if requested. |
|
|
11/3/2025 11:45:58 AM
Kentucky Power Company’s November 3, 2025 Supplemental Responses to KYSEIA’s September 29, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/29/2025 3:09:57 PM
Kentucky Power Company’s October 29, 2025 Supplemental Response to Commission Staff’s First Set of Data Requests, Item 3 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/27/2025 9:26:22 AM
Order Entered:1. Kentucky Power’s motion for an extension of time is granted. 2. Kentucky Power’s responses to Staff’s Second Request for Information, Items 29(b), 86, 87, 88, and 93(c) and the Attorney General and KIUC’s First Request for Information, Items 6 and 7 shall be filed no later than October 17, 2025. |
|
|
10/23/2025 10:57:50 PM
Supplemental Requests for Information of Joint Intervenors to Kentucky Power Company Byron L. Gary Joint Intervenors |
|
|
10/23/2025 6:30:21 PM
Supplemental Data Requests of Attorney General and KIUC J. Michael West Office of the Attorney General |
|
|
10/23/2025 2:24:31 PM
KYSEIA Supplemental Requests for Information David Spenard Kentucky Solar Industries Association, Inc. |
|
|
10/23/2025 8:30:35 AM
Data Request |
|
|
10/21/2025 4:18:42 PM
Kentucky Power Company’s Notice of Filing Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/17/2025 4:21:11 PM
Kentucky Power Company’s October 17, 2025 Supplemental Responses to AG-KIUC’s September 29, 2025 Data Requests 1-6 and 1-7 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/17/2025 4:18:14 PM
Kentucky Power Company’s October 17, 2025 Supplemental Responses to Commission Staff’s September 24, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/17/2025 4:05:35 PM
Kentucky Power Company’s October 17, 2025 Supplemental Responses to Commission Staff’s August 14, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/17/2025 3:53:52 PM
Order Entered: 1. Kentucky Power’s motion for partial rehearing is denied. 2. Kentucky Power’s motion for clarification is granted to the extent discussed herein. |
|
|
10/17/2025 3:35:14 PM
Order Entered: 1. A local public comment meeting for the purpose of hearing public comments shall be held on November 20, 2025, 5 p.m. Eastern Standard Time, at the Pike County Public Library District: 126 Lee Avenue, Rooms 306-307, Pikeville, Kentucky 41501. 2. A local public comment meeting for the purpose of hearing public comments shall be held on December 18, 2025, 5 p.m. Eastern Standard Time, at the Perry County Courthouse, 481 Main Street, 2nd Floor, Hazard, Kentucky 41701. 3. A local public comment meeting for the purpose of hearing public comments shall be held on January 8, 2026, at 5 p.m. Eastern Standard Time, at the Ashland Transportation Center, 99 15?? Street, Ashland, Kentucky 41101. 4. No evidence shall be taken at the local public comment meetings. 5. Recordings of the in-person public comment meetings will be filed into the record of this case. 6. Kentucky Power shall provide written notice of the time and place of the local public comment meetings pursuant to 807 KAR 5:001, Section 9(2). 7. Within 20 days after publication, Kentucky Power shall file proof of publication in the file. 8. Kentucky Power shall ensure that a representative(s) is present at each of the public comment meetings. |
|
|
10/15/2025 5:25:23 PM
SWVA Written Statement Kimberly S. McCann SWVA Kentucky, LLC |
|
|
10/15/2025 10:56:09 AM
Kentucky Power Company’s October 15, 2025 Supplemental Response to AG-KIUC’s September 29, 2025 First Set of Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/13/2025 5:36:37 PM
Kentucky Power Company’s Responses to Joint Intervenors’ September 29, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/13/2025 4:38:08 PM
Statement of Joint Intervenors Regarding Receipt of Electronic Transmissions Byron L. Gary Joint Intervenors |
|
|
10/13/2025 1:27:40 PM
KYSEIA Written Statement David Spenard KYSEIA |
|
|
10/10/2025 4:32:45 PM
Kentucky Power Company’s Notice of Proof of Publication and Exhibit 1 Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/10/2025 3:59:50 PM
Kentucky Power Company’s Responses to KYSEIA’s September 29, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/10/2025 3:53:58 PM
Kentucky Power Company’s Responses to SWVA’s September 29, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/10/2025 12:49:20 PM
Order Entered: 1. KYSEIA’s motion to intervene is granted. 2. KYSEIA is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KYSEIA shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. KYSEIA shall adhere to the procedural schedule set forth in the Commission’s September 11, 2025 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of service of this Order, KYSEIA shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served. |
|
|
10/10/2025 12:39:28 PM
Order Entered: 1. Joint Intervenors’ motion to intervene and motion for leave to file a late intervention motion is granted. 2. Joint Intervenors are entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Joint Intervenors shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Joint Intervenors shall adhere to the procedural schedule set forth in the Commission’s September 11, 2025 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of service of this Order, Joint Intervenors shall file a written statement with the Commission that: a. Certifies that they, or their agent(s), possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served. 6. Each of the Joint Intervenors shall file a separate copy with the Commission of their individual agreement regarding their joint participation in this matter within ten days of entering into the agreement. |
|
|
10/10/2025 10:39:38 AM
20251010_PSC Letter Filing IC Memo and Sign In Sheet into the Record.pdf |
|
|
10/10/2025 10:35:45 AM
Order Entered: 1. SWVA’s motion to intervene is granted. 2. SWVA is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. SWVA shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. SWVA shall adhere to the procedural schedule set forth in the Commission’s September 11, 2025 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of service of this Order, SWVA shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served. |
|
|
10/9/2025 9:04:09 PM
Kentucky Power Company’s Responses to AG-KIUC’s September 29, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/9/2025 6:42:52 PM
Kentucky Power Company’s Responses to Commission Staff’s September 24, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
10/9/2025 8:06:06 AM
Kentucky Power Companys notice regarding data requests from non-parties Lerah Kahn Kentucky Power Company |
|
|
10/2/2025 4:20:10 PM
Kentucky Power Company’s Notice of Filing Marilyn Michelle Caldwell Kentucky Power Company |
|
|
9/30/2025 2:50:28 PM
Kentucky Industrial Utility Customers (KIUC) Written Statement of Mail Waiver Michael Lawrence Kurtz Kentucky Industrial Utility Customers (KIUC) |
|
|
9/30/2025 12:41:19 PM
Order Entered: 1. KIUC’s motion to intervene is granted. 2. KIUC is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. KIUC shall adhere to the procedural schedule set forth in the Commission’s September 11, 2025 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of service of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served. |
|
|
9/29/2025 8:41:18 PM
Tendered Initial Requests for Information of Joint Movants for Joint Intervention to Kentucky Power Company Byron L. Gary Joint Movants for Joint Intervention |
|
|
9/29/2025 5:00:07 PM
Kentucky Power Company’s Motion for Clarification or Partial Rehearing Marilyn Michelle Caldwell Kentucky Power Company |
|
|
9/29/2025 3:21:19 PM
SWVA Initial Request for Information to KYPC W. Mitchell Hall, Jr. SWVA Kentucky, LLC |
|
|
9/29/2025 3:11:50 PM
KYSEIA Initial Request for Information David Spenard Kentucky Solar Industries Association, Inc. |
|
|
9/29/2025 1:15:57 PM
Joint Data Requests of Attorney General and KIUC J. Michael West Attorney General |
|
|
9/24/2025 4:12:20 PM
Data Request |
|
|
9/19/2025 10:19:25 PM
Joint Motion for Full Intervention as Joint Intervenors Byron L. Gary Joint Movants for Joint Intervention |
|
|
9/17/2025 4:21:38 PM
Motion to Intervene William Mitchell Hall, Jr. SWVA Kentucky, LLC |
|
|
9/17/2025 3:58:48 PM
Motion to Intervene David Spenard Kentucky Solar Industries Association, Inc. |
|
|
9/12/2025 5:25:34 PM
Kentucky Power Company’s Responses to Commission Staff’s August 14, 2025 Data Requests Marilyn Michelle Caldwell Kentucky Power Company |
|
|
9/11/2025 2:37:31 PM
Order Entered: 1. An ITC is scheduled on September 30, 2025, at 1 p.m. Eastern Daylight Time at the Commission’s offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. Commission Staff shall contact participants in the ITC by electronic mail to provide details for representatives of the intervenors and non-presenting Kentucky Power staff to join the conference by video link. 3. The procedural schedule set forth in the Appendix to this Order shall be followed. 4. Kentucky Power shall respond to all requests for information propounded by Commission Staff, whether identified on the procedural schedule or otherwise, as provided in those requests. 5. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021 Order in Case No. 2020-00085 regarding filings with the Commission. |
|
|
9/5/2025 3:36:54 PM
Motion to Intervene of Kentucky Industrial Utility Customers (KIUC) Michael Lawrence Kurtz Kentucky Industrial Utility Customers (KIUC) |
|
|
9/4/2025 1:08:47 PM
Notice of Witness Sharing Agreement between AG/KIUC J. Michael West Office of the Attorney General |
|
|
9/4/2025 8:59:36 AM
20250904_PSC No Deficiency Letter.pdf |
|
|
8/29/2025 11:20:09 AM
Kentucky Power Company’s Application Marilyn Michelle Caldwell Kentucky Power Company |
|
|
8/14/2025 8:44:18 AM
Data Request |
|
|
8/13/2025 4:51:17 PM
Order Entered: 1. The Attorney General’s motion to intervene is granted. 2. The Attorney General is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of service of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served. |
|
|
7/31/2025 12:53:09 PM
Motion to Intervene J. Michael West Office of the Attorney General |
|
|
7/29/2025 4:31:50 PM
20250729_PSC Acknowledgment Letter.pdf |
|
|
7/29/2025 4:27:03 PM
Kentucky Power Company Notice of Intent to File an Application for (1) A General Adjustment of Its Rates for Electric Service; (2) Approval of Tariffs and Riders; (3) Approval of Certain Regulatory and Accounting Treatments; and (4) All Other Required Appr |
|