Kentucky Public Service Commission


View Case Filings for: 2018-00295


Case Number:2018-00295
Service Type:Gas & Electric
Filing Date:9/28/2018
Category:Regular
Utilities:

Louisville Gas and Electric Company


Electronic Case
Case Nature:

ELECTRONIC APPLICATION OF LOUISVILLE GAS AND ELECTRIC COMPANY FOR AN ADJUSTMENT OF ITS ELECTRIC AND GAS RATES









Case Filings
FilingDocuments
8/22/2023 2:50:02 PM

Order Entered: 1. LG&E/KU’s motion to be relieved of filing annual updates of a legal merger study is granted in part and denied in part. 2. LG&E/KU’s request to be relieved of filing in this proceeding legal merger studies on an annual basis is granted. 3. LG&E/KU’s request to be relieved of filing a legal merger study update is denied. 4. LG&E/KU shall file a legal merger study update with each application LG&E/KU files for a general rate adjustment pursuant to KRS 278.190 and 807 KAR 5:001, Section 16, until further Order of the Commission. 5. Legal merger study updates filed in the future shall reflect an unbiased review of the benefits and costs of a legal merger and address those qualitative risks that continually identified by LG&E/KU as a hurdle to legal merger.


8/11/2021 10:50:54 AM

Order Entered: 1. This case is opened to address certain outstanding petitions for confidential treatment. 2. The petitions for confidential treatment listed in the Appendix to this Order are granted. 3. The granting of these petitions shall not be cited as precedent in other proceedings before the Commission. 4. LG&E/KU shall review the petitions to determine if the material for which confidential treatment was requested still warrants confidential treatment. 5. LG&E/KU shall inform the Commission in writing in the post-case correspondence file if LG&E/KU determine that the information contained in a petition that is granted by this Order no longer warrants confidential treatment. 6. The Commission shall make any materials available for inspection, upon request, that LG&E/KU determine no longer warrants confidential treatment. 7. This case is closed and removed from the Commission’s docket.


3/22/2021 5:19:25 PM

Order Entered: IT IS THEREFORE ORDERED that the motions of KU and LG&E seeking reconsideration and modification of the February 18, 2021 Orders in these two cases are granted.


2/18/2021 1:28:30 PM

Order Entered: 1. LG&E’s request for a deferral of the company’s submission of its next RTO Membership Analysis and to submit such analysis in its 2021 IRP is granted to the extent that LG&E shall file the analysis annually by March 31 in the post-case correspondence file of its most recent, or current, rate case. However, in the year in which LG&E is required to file an IRP, LG&E shall file the analysis in conjunction with its IRP. 2. LG&E shall also file its most recent RTO Membership Analysis with each future rate case until directed otherwise. 3. All other provisions of the Final Order remains in full force and effect.


10/8/2019 3:00:26 PM

Order Entered: 1. LG&E's motion for confidential treatment made on September 28, 2018, is hereby denied in part and granted in part. 2. LG&E failed to establish that the information produced as part of Tab 60 for which confidential treatment was sought meets the criteria for confidential treatment, and therefore that information shall be made available to the public. 3. The customer identifying information produced pursuant to 807 KAR 5: 001, Section 16(7)(c), as part of the application for which confidential treatment was sought meets the criteria for confidential treatment, and therefore that information shall be exempt from public disclosure indefinitely. 4. LG&E's motion for confidential treatment made on October 12, 2018, is hereby denied in part and granted in part. 5. LG&E failed to establish that the information produced in response to Staff's First Request, Items 37 and 66, for which confidential treatment was sought meets the criteria for confidential treatment, and therefore that information shall be made available to the public. 6. The tax information produced in response to Staff's First Request, Item 48(a)(9), for which confidential treatment was sought meets the criteria for confidential treatment, and therefore that information shall be exempt from public disclosure indefinitely.


5/7/2019 3:15:00 PM

Order Entered nunc pro tunc, that: 1. The Distribution Charge per Met for Rider TS-2 Gas Transportation Service located in Appendix B of the final Order, at page 10 of 11, shall be amended to reflect a rate of $2.1929. 2. All other provisions of the final Order that are not in conflict with the terms of this Order shall remain in full force and effect.


4/30/2019 10:36:01 AM

Final Order Entered: 1. The rates and charges proposed by LG&E are denied. 2. LG&E's motions for leave to file the PSA Stipulation and the testimonies in support of the PSA Stipulation and the Rate Case Stipulation are granted. 3. The PSA and Rate Case Stipulations, along with the Addendum, attached hereto as Appendix A, (without exhibits) are approved with the modification discussed herein. 4. The rates and charges in Appendix B, attached hereto, are fair, just, and reasonable for LG&E to charge for service rendered on and after May 1, 2019. 5. Within 20 days of the date of this Order, LG&E shall file with the Commission, using the Commission's electronic Tariff Filing System, its revised tariffs as set forth in this Order reflecting that they were approved pursuant to this Order. 6. IF LG&E submits a LOLP COSS as part of its next electric base rate application, LG&E shall also provide an alternative COSS along with the LOLP COSS. 7. As part of its annual report, KU shall file updates to its RTO membership study and potential legal merger study. 8. LG&E shall, within 14 days of the date of the creation of the regulatory liability associated with LG&E's request at FERC to remove the MMD component in transmission Rate Schedule No. 402, provide to the Commission, the accounting entries made on its books to effectuate the creation of the regulatory liability.


4/22/2019 3:36:25 PM

20190422_PSC Notice of Filing.pdf


4/10/2019 3:27:31 PM

KU-LGE Joint Errata Filing


Kendrick R. Riggs of Stoll Keenon Ogden PLLC Louisville Gas and Electric Company

KU-LGE_Joint_Errata_re_Stipulation_Exhibits_6_(KU)_and_7_(LGE)_4-10-19.pdf

KU-LGE Joint Errata Filing of Stipulation Exhibits 6 (KU) and 7 (LGE)

4/9/2019 1:42:12 PM

Order Entered: LG&E's motion to substitute is granted.


4/1/2019 3:56:53 PM

Kentucky Industrial Utility Customers, Inc., (KIUC) Post-Hearing Brief


Michael L. Kurtz, Esq Kentucky Industrial Utility Customers (KIUC)

4/1/2019 3:15:03 PM

Post Hearing Brief of Louisville Gas and Electric Company


Kendrick R. Riggs Louisville Gas and Electric Company

KU-LGE_Joint_Post-Hearing_Brief_(_2018-00294___00295).pdf

Post Hearing Brief of Louisville Gas and Electric Company

KU-LGE_Read1st_4-1-19.pdf

Transmittal Letter

4/1/2019 2:46:00 PM

Post-Hearing Brief of Walmart Inc.


Don C.A. Parker Walmart Inc.

4/1/2019 2:20:14 PM

Louisville/Jefferson County Metro Government Post-Hearing Brief


M. Todd Osterloh Louisville/Jefferson County Metro Government

01098373.PDF

Louisville Metro Read 1st Letter

4/1/2019 12:37:39 PM

Attorney Generals Post-Hearing Brief


LW Cook Office of the Attorney General

AGs_Post-Hearing_Brief_3-31.pdf

Attorney General's Post-Hearing Brief

4/1/2019 12:19:03 PM

Post-Hearing Brief


Robert C. Moore The Kroger Company

Kroger_LGE_Post-Hearing_Brief_4-1-19.PDF

Post-Hearing Brief of The Kroger Company

3/29/2019 1:01:35 PM

Motion to Substitute


Gerald E. Wuetcher Louisville Gas and Electric Company

2_-_2018_AG_DR2_LGE_-_FINAL_REDACTED.pdf

Revised Version of Response to Attorney General's Supplemental Data Requests (Redacted Version)

3/29/2019 12:47:46 PM

Post-Hearing Brief


Matthew Malone Kentucky School Boards Association

3/29/2019 12:12:49 PM

20190329_PSC Notice of Filing.pdf


3/21/2019 8:04:49 AM

LGE Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_LGE_PSC-1_Supplemental_Responses_Filed_3-21-19.pdf

LG&E Supplemental Responses to PSC 1-46 and 1-59(c)

3/20/2019 11:31:53 AM

LGE Responses to the Commission Staffs Post-Hearing Request for Information and Petition for Confidential Protection


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read_1st.pdf

Cover Letter

2_-_LGE_Petition_for_Confidential_Protection.pdf

LG&E Petition for Confidential Protection

3_-_2018_PSC_Post-Hearing_LGE_FINAL_REDACTED.pdf

LG&E Responses to Commission Staff's Post-Hearing Request for Information

3/20/2019 11:12:32 AM

LGE Responses to the Attorney Generals Post-Hearing Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read_1st.pdf

Cover Letter

2_-_2018_AG_Post-Hearing_LGE.pdf

LG&E Responses to AG's Post-Hearing Request for Information

3/20/2019 9:03:54 AM

Attorney Generals Notice of Filing


Kent A Chandler Kentucky Office of the Attorney General

3/20/2019 8:44:58 AM

Kristian Dudgeon Public Comment


3/19/2019 2:01:33 PM

20190319_PSC IC Memo.pdf


3/19/2019 9:50:16 AM

Kevin Smith Public Comment


3/18/2019 4:03:59 PM

Attorney Generals Notice of Filing


Kent A Chandler Kentucky Office of the Attorney General

20170630_LGE_HEA_Program_Report.pdf

June 30, 2018 - LG&E HEA Filing

20180910_Louisville_Gas_and_Electric_Company_HEA_Program_Report.pdf

September 10, 2018 - LG&E HEA Filing w/ AEC Audit

LGE_2018_Grant_Manual-Revised-2.pdf

ACM-LG&E Grant Manual Procedures

3/13/2019 9:20:09 AM

Staff Notice


3/11/2019 4:34:13 PM

AGs Post-Hearing Data Requests


Kent A Chandler Kentucky Office of the Attorney General

AGs_PHDRs-_Case_Nos._2018-00294__2018-00295.pdf

Attorney General's Post-Hearing DRs

3/11/2019 3:37:35 PM

Data Request


3/11/2019 3:36:36 PM

Data Request


3/7/2019 1:59:30 PM

Order Entered: 1. Post-hearing data requests shall be filed in the record on or before March 11, 2019. 2. Responses to post-hearing data requests shall be filed in the record on or before March 20, 2019. 3. The parties shall file simultaneous post-hearing briefs on or before April 1, 2019. 4. This case shall stand submitted for decision by the Commission effective 12:01 a.m., Eastern Daylight Time, on April 2, 2019.


3/6/2019 10:56:25 AM

Notice of Filing of Addendum to Stipulation and Recommendation


Kendrick R. Riggs Louisville Gas and Electric Company

Notice_of_Filing_Addendum.pdf

Notice of Filing Addendum to Stipulation and Recommendation

3/5/2019 4:16:51 PM

Notice of Filing Affidavit


Janice Theriot Charter Communications Operating LLC

3/4/2019 3:35:27 PM

KU-LGE Joint Mtn to Adopt Testimony


Kendrick R. Riggs of Stoll Keenon Ogden PLLC Louisville Gas and Electric Company

3/4/2019 1:39:17 PM

LGE is filing a Notarized Affidavit attesting to the publication of Notice of Public Hearing


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_LGE_Affidavit_of_Publications.pdf

LG&E Affidavit of Publication

3/1/2019 3:53:18 PM

Louisville Gas and Electric Companys ("LGE") Response to the Commission Staffs Stipulation Request for Information at the informal conference on February 27, 2019.


Derek A. Rahn Louisville Gas and Electric Company

2_-_2018_Rate_Case_-_LGE_Stipulation_Request_03012019.pdf

LG&E KU Data Response of PSC Stipulation Request

3/1/2019 3:19:15 PM

Kentucky Utilities Company and Louisville Gas and Electric Companys Joint Motion seeking leave to file the Stipulation Testimonies in support of the Stipulations and Recommendations filed by the Companies.


Derek A. Rahn Louisville Gas and Electric Company

1_-_READ_FIRST_-_LGE-KU_Filing_Letter.pdf

READ FIRST - LG&E and KU Filing Letter

2_-_Joint_Motion_To_File_Stipulation_Testimonies.pdf

LG&E and KU Joint Motion to File Stipulation Testimonies

3_-_Blake_LGE-KU_Stipulation_Testimony.pdf

Kent W. Blake Stipulation Testimony

4_-_Stipulation_Exhibit_KWB-1_-_Stipulation_and_Recommendation.pdf

Stipulation Exhibit KWB-1: Stipulation and Recommendation

5_-_Wolfe_LGE-KU_Stipulation_Testimony.pdf

John K. Wolfe Stipulation Testimony

6_-_Exhibit_JKW-1_-_Proposed_revisions_to_Rate_PSA_-_filed_02-27-2019.pdf

Exhibit JKW-1: Proposed revisions to PSA filed 2/27/2019

3/1/2019 2:54:58 PM

Order Entered: Carrie H. Grundmann is admitted pro hac vice for the purpose of representing Walmart in association with Don C.A. Parker in the above-styled proceeding, provided that Don C.A. Parker or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


3/1/2019 10:03:54 AM

Garrett Rebuttal Testimony Errata


Kendrick R Riggs Louisville Gas and Electric Co

Errata_to_Garrett_Rebuttal_Testimony.pdf

Errata to Garrett Rebuttal Testimony

Read1st.pdf

Transmittal Letter

2/27/2019 6:04:34 PM

Joint Motion to File Written Stipulation


Gerald E. Wuetcher Louisville Gas and Electric Company

2/27/2019 4:13:45 PM

Motion to Admit Counsel Pro Hac Vice


Don C.A. Parker Walmart Inc.

2/25/2019 4:52:22 PM

Louisville Gas and Electric Companys ("LGE") Corrected Response to Question No. 75 of the Commission Staffs Second Request for Information and a Supplemental Response to Question No. 3 of the Commission Staffs Fourth Request for Information.


Derek A Rahn Louisville Gas and Electric Company

1_-_Read1st.pdf

READ FIRST - LG&E Filing Letter

2018_PSC_DR2_LGE_Attach_to_Q75d_-_LGE_WSS-27_WSS-29_LGE_COSS.xlsx

LG&E PSC DR2 Attach Q75d - WSS-27 & WSS-29 LG&E COSS

2018_PSC_DR2_LGE_Attach_to_Q75d_-_LGE_WSS-9_WSS-10_WSS-11_WSS-12_WSS-33_WSS-34_COSS_Slippage.xlsx

LG&E PSC DR2 Attach Q75d - WSS-9, WSS-10, WSS-11, WSS-12, WSS-33, & WSS-34 - Capex Slippage

2/22/2019 1:34:05 PM

KU-LGE letter advising of scheduled WebEx conference call on 2-25-19 re PSA Tariff


Kendrick R. Riggs of Stoll Keenon Ogden PLLC Louisville Gas and Electric Company

2/22/2019 11:57:41 AM

Louisville Gas and Electric Companys ("LGE") Rebuttal Testimony and Exhibits. Case No. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

1_-_Read1st.pdf

READ FIRST - LG&E Filing Letter

2_-_LGE_Petition_for_Confidential_Protection.pdf

LG&E Petition for Confidential Protection

2018_Rebuttal_Testimony_KU_LGE_-_Garrett_-_Exhibit_CMG-1.xlsx

LG&E Rebuttal Testimony Garrett - Exhibit CMG-1

2/21/2019 5:23:53 PM

Response to a Request For Information


Terrance A. Spann The United States Department of Defense and all other Federal Executive Agencies

KU-LGE_DR1_DOD-FEA_Q1_Attach_1.zip

DOD/FEA Response to RFI

Read_First_RFI_Feb18_LGE.pdf

READ FIRST (DOD/FEA Cover for RFI Response)

2/21/2019 3:04:49 PM

Order Entered: 1. KIUC's motion for an informal conference is granted. 2. An informal conference shall be scheduled on February ?6, 2019, at 10 a.m., Eastern Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 3. Commission Staff shall provide the call-in information for those parties that desire to attend the informal conference by telephone.


2/21/2019 1:33:16 PM

LGE Supplemental Response to Question No. 8 of the Kentucky Industrial Utility Customers, Inc. Supplemental Set of Data Requests and a Petition for Confidential Protection


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_Petition_for_Confidential_Protection.pdf

Petition for Confidential Protection

3_-_2018_KIUC_DR2_LGE_Q-8_-_Filed_2-21-19.pdf

LG&E Supplemental Response to KIUC 2-8

2/21/2019 1:28:42 PM

LGE Supplemental Response to Question No. 59 of the Attorney Generals First Set of Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2/21/2019 1:24:22 PM

LGE Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_LGE_PSC-1_Supplemental_Responses_Filed_2-21-19.pdf

LG&E Supplemental Responses for PSC 1-46 and 1-59(c)

2/19/2019 4:34:52 PM

Joint Response to Motion for Informal Conference of KIUC


Robert C. Moore The Kroger Company and Walmart, Inc.

Kroger-Walmart_Joint_Response_to_Motion_for_Informal_Conference_of_KIUC_2-19-19.PDF

Kroger and Walmart's Joint Response to Motion for Informal Conference of KIUC

2/19/2019 10:07:07 AM

Motion for Informal Conference of Kentucky Industrial Utility Customers, Inc. (KIUC)


michael l kurtz Kentucky Industrial Utility Customers (KIUC)

2/18/2019 4:21:11 PM

Corrected Exhibit 2 and Notice of Filing


Matthew Malone The Kentucky School Boards Association

2/15/2019 5:52:57 PM

Affidavits of OAG Witnesses Regarding Responses to Data Requests


LW Cook Office of the Attorney General

Affidavit-Watkins.pdf

Affidavit Watkins

Affidavit_Mullinax.pdf

Affidavit Mullinax

2/15/2019 12:36:38 PM

Louisville Gas and Electric Companys ("LGE") Supplemental Response to Question No. 21 of the U.S. Department of Defenses First Request for Information. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E Filing Letter

2_-_Supplemental_Response_Filed_2-15-19.pdf

LG&E Supplemental Response to US DOD 1-21

2/15/2019 12:29:58 PM

Louisville Gas and Electric Companys ("LGE") Supplemental Response to Question No. 35 and Corrected Response to Question No. 49 of the Attorney Generals Supplemental Data Requests. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E Filing Letter

2_-_Supplemental_Responses_Filed_2-15-19.pdf

LG&E Supplemental Responses to AG

2/15/2019 12:01:29 PM

Louisville Gas and Electric Companys ("LGE") Corrected Response to Question No. 53 of the Commission Staffs First Request for Information. 2018-00295


Derek A. Rahn Louisville Gas and Electric Company

1_-_READ_FIRST_LGE_Filing_Letter_2-15-19.pdf

READ FIRST - LG&E Filing Letter

2/14/2019 5:41:50 PM

AGs Responses to Data Requests


Kent A Chandler Kentucky Office of the Attorney General

KYOAG_Responses_to_LGE-KUs_DRs.pdf

AG's Responses to LG&E/KU's Data Requests

OAG_Responses_to_PSC_DRs_(LGE).pdf

AG's Responses to Commission Staff's Data Requests

2/14/2019 5:17:05 PM

Walmart Inc.s Responses to Staffs Initial Request for Information


Don C. A. Parker Walmart Inc.

2018-00295_-_Walmart_Responses_to_Staff_-_Set_1.pdf

Walmart Inc.'s Responses to Staffs Initial Request for Information

2/14/2019 5:14:59 PM

Walmart Inc.s Responses the Data Requests propounded by Louisville/Jefferson County Metro Government


Don C. A. Parker Walmart Inc.

2018-00295_-_Walmart_Responses_to_Louisville-Jefferson_County_Metro.pdf

Walmart Inc.'s Responses the Data Requests propounded by Louisville/Jefferson County Metro Government

Read1st.pdf

Read1st - letter

2/14/2019 5:13:25 PM

Walmart Inc. and The Kroger Companys Responses to the Data Requests propounded by Kentucky Utilities Company and Louisville Gas and Electric Company


Don C. A. Parker Walmart Inc. and The Kroger Company

2018-00294_and_2018-00295_-_Walmart_and_Kroger_Responses_to_KU-LGE.pdf

Walmart Inc. and The Kroger Company's Responses to the Data Requests propounded by Kentucky Utilities Company and Louisville Gas and Electric Company

Bieber_Resume.pdf

Bieber Resume

KU_2018-00294_Tillman_Workpapers.xlsx

KU - 2018-00294 - Tillman Workpapers

LGE_2018-00295_Tillman_Workpapers.xlsx

LGE - 2018-00295 - Tillman Workpapers

Read1st.pdf

Read1st - Letter

2/14/2019 4:26:06 PM

Response to LGEs Data Requests


Matthew Malone The Kentucky School Boards Association

KSBA_Response_to_LGE_Requests.pdf

Response to LG&E Data Requests

2/14/2019 4:22:43 PM

Data Request Responses to the Commission Staff


Matthew Malone The Kentucky School Boards Association

KSBA_Staff_1_LGE_PIlot_Bill001.pdf

Response to Question No. 1

KSBA_Staff_3_graphs.xlsx

Attachment to Question no. 2

2/14/2019 4:15:20 PM

Louisville/Jefferson County Metro Government Response to LGE Request for Information


M. Todd Osterloh Louisville/Jefferson County Metro Government

01078630.PDF

Louisville/Jefferson Co Metro Response to LG&E Request for Information

01078686.PDF

Metro Read 1st Letter

2/14/2019 3:34:20 PM

Response to Commission Staffs Initial Request for Information


Janice Theriot Charter Communications Operating LLC

Charters_Response_to_Commissions_Initial_Requests_for_Information_(LGE).docx.pdf

Charter's Response to Commission Staff's Initial Request for Information

2/14/2019 3:31:34 PM

Response to Data Requests of LGE


Janice Theriot Charter Communications Operating LLC

Charters_Response_to_LGE-KU_Request_for_Information_(LGE).pdf

Charter's Response to LG&E's Request for Information

2/14/2019 2:48:07 PM

LGE Responses to the Commission Staffs Fourth Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_2018_PSC_DR4_LGE_FINAL.pdf

LG&E Responses to Commission Staffs Fourth Request for Information

2/14/2019 2:24:09 PM

Sierra Clubs Response and Objection to Data Requests Served by LGE


Joe F. Childers Amy Waters, Joe Dutkiewicz and Sierra Club

2019.2.14_Sierra_Club_Response_to_Company_DR_LGE_REDACTED.pdf

Sierra Club's Response and Objection to Data Requests Served by LG&E

2/14/2019 2:21:15 PM

KENTUCKY INDUSTRIAL UTILITY CUSTOMERS, INC. RESPONSES TO INITIAL DATA REQUESTS of 1) ATTORNEY GENERAL; 2) COMMISSION STAFF; 3) KENTUCKY UTILITIES COMPANY AND LOUISVILLE GAS AND ELECTRIC COMPANY; 4) LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT; and 5) LOUISVIL


michael l kurtz Kentucky Industrial Utility Customers (KIUC)

2018_AG_DR1_KU_Attach_to_Q137b_12CP.xlsx

Attachment to KU/LG&E Question #1

Cover_Ltr_-Read_1st.pdf

Cover Ltr - Read 1st

KIUC_Response_to_Commission_Staff_1st_Set.pdf

KIUC Responses to Commission Staff

KIUC_Response_to_Louisville-Jefferson_1st_Set.pdf

KIUC Responses to Louisville/Jefferson County

KIUC_Responses_to_KU-LGE_1st_Set.pdf

KIUC Responses to KU/LG&E

KU_RTS-FLS_Revenue_Calculations.xlsx

Attachment to KU/LG&E Question #1

LGE_RTS_Revenue_Calculations.xlsx

Attachment to KU/LG&E Question #1

SJB-5.xlsx

Attachment to KU/LG&E Question #1

SJB-6.xlsx

Attachment to KU/LG&E Question #1

Table_1.xlsx

Attachment to KU/LG&E Question #1

Table_2.xlsx

Attachment to KU/LG&E Question #1

Tables_3,_5.xlsx

Attachment to KU/LG&E Question #1

Tables_4,_6.xlsx

Attachment to KU/LG&E Question #1

Tables_7,_8.xlsx

Attachment to KU/LG&E Question #1

2/14/2019 2:12:16 PM

Louisville Gas and Electric Companys Base Period update to Filing Requirements. Case No 2018-00295


Derek A Rahn Louisville Gas and Electric Company

2/14/2019 2:04:45 PM

Sierra Clubs Response to Data Requests Served by Commission Staff


Joe F. Childers Amy Waters, Joe Dutkiewicz and Sierra Club

2019.2.14_Sierra_Club_Response_to_Staff_DR_LGE.pdf

Sierra Club's Response to Data Requests Served by Commission Staff

2/14/2019 12:45:38 PM

United States Department of Defense and all other Federal Executive Agencies Response to Commission Staffs Initial Requests for Information and Motion for Confidential Protection


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

DoD_FEA_VERIFIED_Responses_to_Staff_(2018-00295).pdf

DoD-FEA's Responses to Staff's Initial RFI

Motion_for_Confidential_Protection.pdf

Motion for Confidential Protection

NOTIFICATION_OF_CONFIDENTIAILITY_OF_ATTACHMENT_13_AB.pdf

Notification of Confidentiality of Attachment 13A&B

NOTIFICATION_OF_CONFIDENTIAILITY_OF_ATTACHMENT_9.pdf

Notification of Confidentiality of Attachment 9

2/14/2019 12:29:46 PM

United States Department of Defense and all other Federal Executive Agencies Response to Louisville Gas and Electric Companys 1st Data Request and Motion for Confidential Protection


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

Motion_for_Confidential_Protection.pdf

Motion for Confidential Protection

NOTIFICATION_OF_CONFIDENTIAILITY_OF_ATTACHMENT_10AB.pdf

Notification of Confidentiality of Attachment 10A&B

NOTIFICATION_OF_CONFIDENTIAILITY_OF_ATTACHMENT_8.pdf

Notification of Confidentiality of Attachment 8

2/14/2019 11:22:58 AM

United States Department of Defense and all other Federal Executive Agencies Attorney Generals Initial Data Requests


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

2/14/2019 11:13:23 AM

United States Department of Defense and all other Federal Executive Agencies Response to Louisville-Jefferson County Metro Government Request for Information


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

DoD_FEA_VERIFIED_Responses_to_Louisville-Jefferson_County_(2018-00295).pdf

DoD-FEA's Responses to Louisville Jefferson County Metro Government's Request for Information

2/7/2019 11:09:18 AM

Order Entered: Matthew E. Miller and Tony G. Mendoza are admitted pro hac vice tor the purpose of representing the Sierra Club in association with Joe F. Childers in the above-styled proceeding, provided that Joe F. Childers or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


2/7/2019 11:02:06 AM

Order Entered: Terrance A. Spann is admitted pro hac vice for the purpose of representing DOD/FEA in association with G. Houston Parrish in the above-styled proceeding, provided that G. Houston Parrish or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


2/6/2019 9:23:18 AM

LGE Supplemental Response to Question No. 21 of the U.S. Department of Defenses First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_US_DOD_DR1_LGE_Supplemental_Response_Filed_2-6-19.pdf

LG&E Supplemental Response to US DOD 1-21

2/5/2019 10:20:48 AM

LGE Hearing Notice Request to KY Press Inc


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_LGE_Request_to_KY_Press.pdf

LG&E Request to KY Press

2/4/2019 9:50:24 AM

Motion for Counsel to Appear Pro Hac Vice


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

2/1/2019 8:52:13 AM

Louisville Gas and Electric Companys ("LGE") Corrected and Supplemental Response to Question 9( d) of the Sierra Clubs Initial Data Request. - 2018-00295


Derek A Rahn Louisville Gas and Electric Company

01_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E Filing Letter

02_-_Supplemental_Response_Filed_2-1-19.pdf

LG&E Supplemental Response to Q9(d)

03_-_Petition_for_Confidential_Protection.pdf

LG&E Petition for Confidential Protection

1/31/2019 4:33:47 PM

Attorney Generals Initial Data Requests to Intervenors


Kent A Chandler Kentucky Office of the Attorney General

1/31/2019 4:21:03 PM

Louisville/Jefferson County Metro Government First Request for Information to Walmart, Inc.; Department of Defense and all other Federal Executive Agencies (“DOD”); and Kentucky Industrial Utility Customers, Inc. (“KIUC”)


M. Todd Osterloh Louisville/Jefferson County Metro Government

01072866.PDF

Louisville Metro DR to Walmart

01072867.PDF

Louisville Metro DR to DOD

01072870.PDF

Louisville Metro DR to KIUC

Metro_Read1st_First_RFI_to_Walmart,_DOD__KUIC_1-31-19_(01072874xA9D25).pdf

Metro Read1st First RFI to Walmart, DOD & KUIC 1/31/19

1/31/2019 3:13:05 PM

KU-LGE Data Requests to Intervenors


Kendrick R. Riggs of Stoll Keenon Ogden PLLC Kentucky Utilities Company and Louisville Gas and Electric Company

KU-LGE_Data_Requests_to_AG_Lou-Metro_LFUCG_1-31-19.pdf

KU-LGE Data Requests to AG, Lou Metro and LFUCG

KU-LGE_Data_Requests_to_Charter_1-31-19.pdf

KU-LGE Data Requests to Charter

KU-LGE_Data_Requests_to_DoD-FEA_1-31-19.pdf

KU-LGE Data Requests to DoD-FEA

KU-LGE_Data_Requests_to_KIUC_1-31-19.pdf

KU-LGE Data Requests to KIUC

KU-LGE_Data_Requests_to_Kroger-Walmart_1-31-19.pdf

KU-LGE Data Requests to Kroger-Walmart

KU-LGE_Data_Requests_to_KSBA_1-31-19.pdf

KU-LGE Data Requests to KSBA

KU-LGE_Data_Requests_to_Sierra_Club_1-31-19.pdf

KU-LGE Data Requests to Sierra Club

1/31/2019 2:38:11 PM

Data Request


1/31/2019 2:36:47 PM

Data Request


1/31/2019 2:35:15 PM

Data Request


1/31/2019 11:40:50 AM

Data Request


1/31/2019 11:39:41 AM

Data Request


1/31/2019 11:38:18 AM

Data Request


1/31/2019 11:37:01 AM

Data Request


1/31/2019 10:17:53 AM

Motion of Amy Waters, Joe Dutkiewicz and Sierra Club to Admit Matthew Miller and Tony Mendoza Pro Hac Vice


Joe F. Childers Amy Waters, Joe Dutkiewicz and Sierra Club

1/31/2019 10:00:23 AM

Data Request


1/25/2019 12:44:30 PM

LGEs Supplemental Response to Question No. 34(c) of the Attorney Generals Supplemental Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Response_Filed_1-25-19.pdf

LG&E's Supplemental Response to AG 2-34c

1/25/2019 12:41:03 PM

LGEs Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Response_Filed_1-25-19.pdf

LG&E's Supplemental Responses to PSC 1-46 and 1-59c

1/17/2019 3:42:31 PM

Amended Cover Letter for Testimony of Jeremy Fisher


Joe F. Childers Amy Waters, Joe Dutkiewicz and Sierra Club

1/16/2019 5:50:22 PM

Testimony of Marlon Cummings


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_01162019.pdf

Read First Cover Letter

Testimony_of_Marlon_Cummings.pdf

Testimony of Marlon Cummings on Behalf of Association of Community Ministries

1/16/2019 5:07:29 PM

Pre-Filed Direct Testimony, Exhibits, Schedules and Workpapers


Kent A Chandler Kentucky Office of the Attorney General

DHM-_KU_Rev_Req_Model.xlsx

Mullinax Workpapers

DHM-WP_EDIT_RMA.xlsx

Mullinax Workpapers

Schedule_GAW-3.xlsx

Watkins Schedule

1/16/2019 4:49:00 PM

Direct Testimony of Joseph H. Crone III


Janice Theriot Charter Communications Operating LLC

1/16/2019 4:46:22 PM

Notice of Filing of Testimony including the Direct Testimony and Exhibits of Gregory W. Tillman on behalf of Walmart Inc. (Attachment A) and the Direct Testimony of Justin Bieber on behalf of The Kroger Company (Attachment B)


Don C. A. Parker Walmart Inc. and The Kroger Company

Read1st.pdf

Read1st - Letter

1/16/2019 4:39:40 PM

Department of Defense and all other Executive Agencies - Testimony of Christopher C. Walters


Terrance A. Spann Department of Defense and all other Executive Agencies

DoD-FEA_Direct_Testimony_and_Exhibits_of_Christopher_C._Walters_(2018-00294_2018-00295).pdf

DOD/FEA Direct Testimony and Exhibits of Christopher C. Walters

1/16/2019 4:34:30 PM

Testimony of James T. Selecky


Terrance A. Spann Department of Defense and all other Federal Executive Agencies

DoD-FEA_Direct_Testimony_and_Exhibits_of_James_T._Selecky_(2018-00294_2018-00295).pdf

DOD/FEA Direct Testimony and Exhibits of James T. Selecky

1/16/2019 4:30:09 PM

READ FIRST DOD Filing Letter for Testimony of James T. Selecky and Testimony of Christopher C. Walters 1-16-19


Terrance A. Spann Department of Defense and all other Federal Executive Agencies

READ_FIRST_-_Cover_for_Testimony_of_Selecky_and_Walters.pdf

READ FIRST Cover Letter for Testimony of Mr. Selecky and Mr. Walters

1/16/2019 4:19:03 PM

Kentucky Industrial Utility Customers (KIUC) Direct Testimony and Exhibits of Lane Kollen and Stephen J. Baron


michael l kurtz Kentucky Industrial Utility Customers, Inc. (KIUC)

Baron_Direct_Testimony-Exhibits__2018-00295__00294.pdf

Direct Testimony and Exhibits of Stephen J. Baron

Kollen_Direct_Testiomony-Exhibits__2018-00295__00294.pdf

Direct Testimony and Exhibits of Lane Kollen

1/16/2019 4:09:16 PM

Direct Testimony of Cathy Hinko, Executive Director, Metropolitan Housing Coalition


Tom FitzGerald Metropolitan Housing Coalition

Hinko_Testimony_Affidavit.pdf

Affidavit of Testimony of Cathy Hinko

1/16/2019 2:25:36 PM

Testimony of Ronald Willhite


Matthew Malone The Kentucky School Boards Association

LGE_Testimony_Verification_2018-00295029.pdf

Verification of Ronald Willhite

1/16/2019 2:07:11 PM

Redacted Testimony of Jeremy Fisher, with Exhibits


Joe F. Childers Amy Waters, Joe Dutkiewicz and Sierra Club

1/11/2019 2:42:08 PM

Louisville Gas and Electric Companys ("LGE") Corrected Responses to: • Question No. 53 of the Commission Staffs First Request for Information • Question No. 32 of the Commission Staffs Second Request for Information


Derek A. Rahn Louisville Gas and Electric Company

1-_READ_FIRST_LGE_Filing_Letter_1-11-19.pdf

READ FIRST - LG&E Filing Letter

2_-_LGE_Supplemental_PSC_Responses_1-11-19.pdf

LG&E Supplemental Response to PSC DR 1-53 and 2-32

Att_LGE_PSC_1-53_Supplemental_Sch_A_Electric.xlsx

Supplemental Attachment to Question 53 - Schedule A Electric

Att_LGE_PSC_1-53_Supplemental_Sch_A_Gas.xlsx

Supplemental Attachment to Question 53 - Schedule A Gas

Att_LGE_PSC_1-53_Supplemental_Sch_B_Electric.xlsx

Supplemental Attachment to Question 53 - Schedule B Electric

Att_LGE_PSC_1-53_Supplemental_Sch_B_Gas.xlsx

Supplemental Attachment to Question 53 - Schedule B Gas

Att_LGE_PSC_1-53_Supplemental_Sch_C_and_D_Electric.xlsx

Supplemental Attachment to Question 53 - Schedule C & D Electric

Att_LGE_PSC_1-53_Supplemental_Sch_C_and_D_Gas.xlsx

Supplemental Attachment to Question 53 - Schedule C & D Gas

Att_LGE_PSC_1-53_Supplemental_Sch_J.xlsx

Supplemental Attachment to Question 53 - Schedule J

1/3/2019 1:05:30 PM

Order Entered: 1. A hearing in this matter shall be held on March 5, 2019, at 9 a.m. Eastern Standard Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Louisville Gas and Electric Company (LG&E) shall give notice of the hearing in compliance with 807 KAR 5:001 , Section 9(2)(b). In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is requested, LG&E shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001 , Section 9(9), a digital video transcript shall be made of the hearing.


1/2/2019 11:32:40 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to US Department of Defenses Supplemental Request for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

01_-_2018_US_DOD_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to US DOD Supplemental Request - 01/02/19

02_-_2018_US_DOD_DR2_LGE.pdf

2018 LG&E Data Responses to US DOD Supplemental Requests

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_01_-_2018_PSC_DR1_KU_Attach_to_Q53_Depr_Study.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 01 - 2018 PSC DR1 KU Attach to Q53 Depr Study

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_02_-_2018_PSC_DR1_LGE_Attach_to_Q_53_Depr_Study.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 02 - 2018 PSC DR1 LGE Attach to Q 53 Depr Study

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_03_-_Ash_Ponds_as_of_May_2018_for_GF.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 03 - Ash Ponds as of May 2018 for GF

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_04_-_KU_and_LGE_Database_activity_for_2016_and_2017.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 04 - KU and LGE Database activity for 2016 and 2017

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_05_-_ku_salvage_-_cor_thru_2017.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 05 - ku salvage - cor thru 2017

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_06_-_KU__Plant_report_December_2016.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 06 - KU_ Plant report_December 2016

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_07_-_KU__Plant_report_December_2017.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 07 - KU_ Plant report_December 2017

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_08_-_KU-2017-Steam-ReserveAjustments.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 08 - KU-2017-Steam-ReserveAjustments

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_09_-_KU-2017-Steam-retired_plant_allocated_-additional_Brown.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 09 - KU-2017-Steam-retired plant allocated -additional Brown

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_10_-_KU-2017-Steam-v1.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 10 - KU-2017-Steam-v1

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_11_-_KU-2017-Steam-v2.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 11 - KU-2017-Steam-v2

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_12_-_LGE_-_2017_-_Electric-Steam-ReserveAdjustments.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 12 - LGE - 2017 - Electric-Steam-ReserveAdjustments

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_13_-_LGE_-_2017_-_Electric-Steam-v1.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 13 - LGE - 2017 - Electric-Steam-v1

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_14_-_LGE_-_2017_-_Electric-Steam-v2.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 14 - LGE - 2017 - Electric-Steam-v2

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_15_-_lge_salvage_-_cor_thru_2017.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 15 - lge salvage - cor thru 2017

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_16_-_LGE__Plant_report_December_2016.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 16 - LGE_ Plant report_December 2016

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_17_-_LGE__Plant_report_December_2017.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 17 - LGE_ Plant report_December 2017

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_18_Steam_Retired_Plant_Allocated.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 18 Steam Retired Plant Allocated

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_19_Steam_Retired_Plant_Separate.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 19 Steam Retired Plant Separate

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_20_Steam_Retired_Plant_Allocated.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 20 Steam Retired Plant Allocated

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_21_Steam_Retired_Plant_Separate.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 21 Steam Retired Plant Separate

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_22_KU_Proposed_Depr_Rates.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 22 KU Proposed Depr Rates

2018_US_DOD_DR2_LGE_Attach_to_Q7_-_Att_23_LGE_Proposed_Depr_Rates.xlsx

2018 US DOD DR2 LGE Attach to Q7 - Att 23 LGE Proposed Depr Rates

1/2/2019 11:23:50 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Sierra Club ("SC") Supplemental Data Requests for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_SC_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to Sierra Club Supplemental DRs - 01/02/19

2_-_2018_SC_DR2_LGE.pdf

2018 LG&E Data Responses to Sierra Club Supplemental Requests

1/2/2019 11:21:33 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Metropolitan Housing Coalition ("MHC") Supplemental Set of Requests for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_MHC_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to MHC Supplemental Set - 01/02/19

2_-_2018_MHC_DR2_LGE.pdf

2018 LG&E Data Responses to MHC Supplemental Requests

1/2/2019 11:19:26 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Louisville Metro Governments Second Request for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_Lou_Metro_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to Louisville Metro 2nd Request - 01/02/19

2_-_2018_Metro_DR2_LGE.pdf

2018 LG&E Data Responses to Louisville Metro Supplemental Requests

2018_METRO_DR2_LGE_Attach_to_Q1a_-_TODS_Ratchet_Analysis.xlsx

2018 METRO DR2 LGE Attach to Q1a - TODS Ratchet Analysis

1/2/2019 11:16:32 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Kentucky School Boards Associations ("KSBA") Supplemental Requests for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_KSBA_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to KSBA Supplemental Requests - 01/02/19

2_-_2018_KSBA_DR2_LGE.pdf

2018 LG&E Data Responses to KSBA Supplemental Requests

2018_KSBA_DR2_LGE_Attach_to_Q15.xlsx

2018 KSBA DR2 LG&E Attach to Q15

2018_KSBA_DR2_LGE_Attach_to_Q3b_-_TODS_Conversion_Factor_Calculation.xlsx

2018 KSBA DR2 LG&E Attach to Q3b - TODS Conversion Factor Calculation

2018_KSBA_DR2_LGE_Attach_to_Q7_-_Att_1_-_Non-School_Data.xlsx

2018 KSBA DR2 LG&E Attach 1 to Q7 - Non-School Data

2018_KSBA_DR2_LGE_Attach_to_Q7_-_Att_2_-_School_Data.xlsx

2018 KSBA DR2 LG&E Attach 2 to Q7 - School Data

2018_KSBA_DR2_LGE_Attach_to_Q7_-_Att_3_-_LOLP_EUE_PG_Analysis.xlsx

2018 KSBA DR2 LG&E Attach 3 to Q7 - LOLP EUE PG Analysis

1/2/2019 11:10:13 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Kroger Walmarts Second Requests for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_Kroger-Walmart_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to Kroger & Walmart 2nd Request 01/02/19

2_-_2018_Kroger-Walmart_DR2_LGE.pdf

2018 LG&E Data Responses to Kroger & Walmart's Second Requests

2018_Kroger-Walmart_DR2_LGE_Attach_to_Q1_-_Capitalization_vs._Rate_Base.xlsx

2018 Kroger-Walmart DR2 LGE Attach to Q1 - Capitalization vs. Rate Base

1/2/2019 11:07:34 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Kentucky Industrial Utility Customers ("KIUC") Supplemental Set of Data Requests for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_KIUC_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to KIUC Supplemental DRs - 01/02/19

2_-_2018_KIUC_DR2_LGE.pdf

2018 LG&E Data Responses to KIUC Supplemental Requests

2018_KIUC_DR2_LGE_Attach_to_Q1.xlsx

2018 KIUC DR2 LGE Attach to Q1

2018_KIUC_DR2_LGE_Attach_to_Q10.xlsx

2018 KIUC DR2 LGE Attach to Q10

2018_KIUC_DR2_LGE_Attach_to_Q12_-_Att_1_Test_Year_Storm_Calc_Distribution.xls

2018 KIUC DR2 LGE Attach to Q12 - Att 1 Test Year Storm Calc Distribution

2018_KIUC_DR2_LGE_Attach_to_Q12_-_Att_2_Base_Year_Storm_Calc_Distribution.xls

2018 KIUC DR2 LGE Attach to Q12 - Att 2 Base Year Storm Calc Distribution

2018_KIUC_DR2_LGE_Attach_to_Q12_-_Att_3_Test_Year_Storm_Calc_Transmission.xlsx

2018 KIUC DR2 LGE Attach to Q12 - Att 3 Test Year Storm Calc Transmission

2018_KIUC_DR2_LGE_Attach_to_Q12_-_Att_4_Base_Year_Storm_Calc_Transmission.xlsx

2018 KIUC DR2 LGE Attach to Q12 - Att 4 Base Year Storm Calc Transmission

2018_KIUC_DR2_LGE_Attach_to_Q16_-_Money_Pool_Borrowings,_Investments.xlsx

2018 KIUC DR2 LGE Attach to Q16 - Money Pool Borrowings, Investments

2018_KIUC_DR2_LGE_Attach_to_Q18(a,b)_-_Other_Property_and_Investments.xlsx

2018 KIUC DR2 LGE Attach to Q18(a,b) - Other Property and Investments

2018_KIUC_DR2_LGE_Attach_to_Q19(b)_-_Other_Current_Assets.xlsx

2018 KIUC DR2 LGE Attach to Q19(b) - Other Current Assets

2018_KIUC_DR2_LGE_Attach_to_Q20(a)_-_Regulatory_Assets_and_Deferred_Debits.xlsx

2018 KIUC DR2 LGE Attach to Q20(a) - Regulatory Assets and Deferred Debits

2018_KIUC_DR2_LGE_Attach_to_Q21_-_Line_43_Support.xlsx

2018 KIUC DR2 LGE Attach to Q21 - Line 43 Support

2018_KIUC_DR2_LGE_Attach_to_Q22(a)_-_Regulatory_Liabilities.xlsx

2018 KIUC DR2 LGE Attach to Q22(a) - Regulatory Liabilities

2018_KIUC_DR2_LGE_Attach_to_Q23(c)_-_Cash_and_Temporary_Investments.xlsx

2018 KIUC DR2 LGE Attach to Q23(c) - Cash and Temporary Investments

2018_KIUC_DR2_LGE_Attach_to_Q5a.xlsx

2018 KIUC DR2 LGE Attach to Q5a

2018_KIUC_DR2_LGE_Attach_to_Q5b.xlsx

2018 KIUC DR2 LGE Attach to Q5b

2018_KIUC_DR2_LGE_Attach_to_Q7_-_Headcount.xlsx

2018 KIUC DR2 LGE Attach to Q7 - Headcount

1/2/2019 11:01:21 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Charter Communications Operating, LLCs Supplemental Requests for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_Charter_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to Charter Supplemental Requests - 01/02/19

2_-_2018_Charter_DR2_LGE.pdf

2018 LG&E Data Responses to Charter Supplemental Requests

1/2/2019 10:59:02 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Attorney Generals ("AG") Supplemental Data Request for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_AG_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to AG Supplemental DR - 01/02/19

2_-_2018_AG_DR2_LGE_-_FINAL.pdf

2018 LG&E Data Responses to AG Supplemental Requests

2018_AG_DR2_LGE_Attach_to_Q13_-_Hourly_Unit_Generation.xlsx

2018 AG DR2 LGE Attach to Q13 - Hourly Unit Generation

2018_AG_DR2_LGE_Attach_to_Q20a.xlsx

2018 AG DR2 LGE Attach to Q20a

2018_AG_DR2_LGE_Attach_to_Q5_-_Att_1.xlsx

2018 AG DR2 LGE Attach to Q5 - Att 1

2018_AG_DR2_LGE_Attach_to_Q5_-_Att_2.xlsx

2018 AG DR2 LGE Attach to Q5 - Att 2

2018_AG_DR2_LGE_Attach_to_Q72_-_Att_1.xlsx

2018 AG DR2 LGE Attach to Q72 - Att 1

2018_AG_DR2_LGE_Attach_to_Q72_-_Att_2.xlsx

2018 AG DR2 LGE Attach to Q72 - Att 2

2018_AG_DR2_LGE_Attach_to_Q72_-_Att_3.xlsx

2018 AG DR2 LGE Attach to Q72 - Att 3

2018_AG_DR2_LGE_Attach_to_Q73a.xlsx

2018 AG DR2 LGE Attach to Q73a

1/2/2019 10:52:15 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Association of Community Ministries, Inc. ("ACM") Second Requests for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_ACM_DR2_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LG&E Filing Letter to ACM Second Requests - 01/02/19

2_-_2018_ACM_DR2_LGE_[FINAL].pdf

2018 LG&E Data Responses to ACM Second Requests

2018_ACM_DR2_LGE_Attach_to_Q01(c)_-_3rd_Party_Assistance.xlsx

2018 ACM DR2 LGE Attach to Q01(c) - 3rd Party Assistance

2018_ACM_DR2_LGE_Attach_to_Q02(c)_-_3rd_Party_Assistance.xlsx

2018 ACM DR2 LGE Attach to Q02(c) - 3rd Party Assistance

2018_ACM_DR2_LGE_Attach_to_Q04(b)(c)_-_Average_Annual_Usage_Low_Income.xls

2018 ACM DR2 LGE Attach to Q04(b)(c) - Average Annual Usage Low Income

1/2/2019 10:48:51 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to the Kentucky Public Service Commissions ("KPSC") Third Request for Information for paper and electronic filing - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_2018_PSC_DR3_LGE_Filing_Letter_due_01-02-19.pdf

READ FIRST - LGE Filing Letter to PSC Third Request - 01/02/19

2_-_2018_PSC_DR3_LGE.pdf

2018 LG&E Data Responses to PSC Third Request

2018_PSC_DR3_LGE_Attach_to_Q3_-_Rate_Comparision.xlsx

2018 PSC DR3 LGE Attach to Q3 - Rate Comparison

2018_PSC_DR3_LGE_Attach_to_Q9.xlsx

2018 PSC DR3 LGE Attach to Q9

1/2/2019 10:44:38 AM

Louisville Gas and Electric Company ("LGE") Petition for Confidential Protection regarding certain information in this filing pertaining to data-request responses LGE filed in the above referenced matter on January 2, 2019 - Case No. 2018-00295.


Rick E. Lovekamp Louisville Gas and Electric Company

01_-_Read1st.pdf

READ FIRST - LG&E Filing Letter for Confidential Protection

02_-_LGE_Petition_for_Confidential_Protection.pdf

LG&E Petition for Confidential Protection

1/2/2019 10:33:01 AM

LGE Corrected Responses to Question No. 28(a)(i) of the Sierra Clubs Initial Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_01-02-19.pdf

LG&E Corrected Response to SC 1-28(a)

1/2/2019 10:30:09 AM

LGE Corrected Responses to Question Nos. 55(b), 76(a), and 196 of the Attorney Generals Initial Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_01-02-19.pdf

LG&E Corrected Responses to AG 1-55(b), 1-76(a), and 1-196

12/21/2018 8:21:21 AM

Louisville Gas and Electric Companys Corrected Response to Question No. 1 of the Association of Community Ministries, Inc.s First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_12-21-18.pdf

LG&E Corrected Response to ACM 1-1

12/21/2018 8:17:45 AM

Louisville Gas and Electric Companys Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_12-21-18.pdf

LG&E Supplemental Responses to PSC 1-46 and PSc 1-59(c)

12/14/2018 2:07:56 PM

Order Entered nunc pro tunc that: 1. The MHC/ACM Order shall be amended to include the October 16, 2018 BereaOnline.com article, which article is attached as an Appendix to this Order. 2. All other provisions of the MHC/ACM Order that are not in conflict with the terms of this Order shall remain in full force and effect.


12/13/2018 6:00:46 PM

Louisville Metro 2nd Data Request to LGE


M Todd Osterloh

Louisville_Metro_DR2_to_LGE_(01055476xA9D25).pdf

Louisville Metro 2nd Data Request to LG&E

12/13/2018 5:02:38 PM

Amy Waters’, Joe Dutkiewicz’s, and Sierra Club’s Supplemental Data Requests


Joe F. Childers Amy Waters, Joe Dutkiewicz, and Sierra Club

12/13/2018 4:55:51 PM

Attorney Generals Supplemental Data Requests


Kent A Chandler Kentucky Office of the Attorney General

Case_No._2018-00295-_Attorney_Generals_Supplemental_DRs.pdf

Attorney General's Supplemental Data Requests

12/13/2018 3:59:02 PM

Supplemental Set of Data Requests to Kentucky Utilities Company and Louisville Gas Electric Company


michael l kurtz Kentucky Industrial Utility Customers, Inc. (KIUC)

Cover_Ltr_-_Read_1st.pdf

Read 1st Cover letter

KIUC_Supplemental_DR_to_LGE__2018-00295.pdf

KIUC Supplemental DR to LGE 2018-00295

12/13/2018 3:37:59 PM

Charters Supplemental Request for Information to LGE


Janice Theriot Charter Communications Operating LLC

Charter_s_Second_Request_for_Information_to_LGE_(4).pdf

Charter's Supplemental Request for Information to LG&E

12/13/2018 3:08:56 PM

Second Requests for Information to Louisville Gas and Electric Company


Robert C. Moore The Kroger Company and Walmart, Inc.

Kroger-Walmart_LGE_Second_Requests_for_Information_12-13-18.PDF

Kroger and Walmart Second Requests for Information to LG&E

12/13/2018 2:43:19 PM

Supplemental Request for Information


Matt Malone Kentucky School Boards Association

Supplemental_Data_Requests_to_LGE.pdf

Supplemental Request for Information

12/13/2018 2:24:58 PM

Data Request


12/13/2018 11:24:54 AM

Second Requests for Information of Association of Community Ministries


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_12132018.pdf

Read First Cover Letter

ACM_Second__Requests_For_Information.pdf

ACM Second Requests for Information

12/13/2018 9:18:08 AM

Supplemental Request for Information of the United States Department of Defense and all other Federal Executive Agencies to Louisville Gas Electric Company


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

Supplemental_RFI_to_LGE.pdf

Supplemental RFI to LGE

12/12/2018 7:55:38 PM

Supplemental Set of Data Requests to Louisville Gas and Electric Company, and Read First


Tom FitzGerald Metropolitan Housing Coalition

MHC_Supplemental_Set_Of_Data_Requests_To_LGE.pdf

(Supplemental Set of Data Requests to Louisville Gas and Electric Company from Metropolitan Housing Coalition)

Read_First_3.pdf

(Read First)

12/7/2018 12:10:19 PM

Louisville Gas and Electric Companys ("LGE") Supplemental Responses to Question No 177( d) of the Attorney Generals Initial Request for Information for filing. - Case No. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

01-_READ_FIRST_-_LGE_Filing_Letter_12-7-18.pdf

READ FIRST - LG&E Filing Letter

02_-_LGE_Petition_for_Confidential_Protection_12-7-18.pdf

LG&E Petition for Confidential Protection

03_-_LGE_Supp_Response_AG_1-177(d).pdf

LG&E Supplemental Response to AG 1-177(d)

12/6/2018 1:29:37 PM

Louisville Gas and Electric Companys ("LGE") Privilege Log pertaining to all data-request responses LGE filed in the above referenced matter on November 29, 2018 and December 6, 2018. - Case No. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

01_-_READ_FIRST_-_LGE_Filing_Letter_-_Privilege_Log_-_12-6-18.pdf

READ FIRST - LGE Filing Letter - Privilege Log - 12-6-18

02_-_Privilege_Log_for_Case_Nos__2018-00294_and_2018-00295_(1st_Round_DRs).pdf

Privilege Log for Case Nos. 2018-00294 and 2018-00295 (1st Round DRs)

12/6/2018 12:31:19 PM

Louisville Gas and Electric Companys ("LGE") Responses to the Sierra Clubs Initial Request for Information for paper and electronic filing - Case No. 2018-00295


Derek A Rahn Louisville Gas and Electric Company

01_-_Read1st.pdf

READ FIRST - LG&E Filing Letter to Sierra Clubs DR1 12-6-18

02_-_Petition_for_Confidential_Protection.pdf

2018 LG&E Petition for Confidential Protection

03_-_2018_SC_DR1_LGE.pdf

2018 LG&E First Data Responses to the Sierra Club

12/5/2018 2:00:06 PM

Post Intervention Statement of Amy Waters, Joe Dutkiewicz, and Sierra Club


Joe F. Childers Amy Waters, Joe Dutkiewicz, and Sierra Club

11/29/2018 12:35:05 PM

CORRECTED - Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to US Department of Defenses first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_US_DOD_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to US DOD DR1 11-29-18

02_-_2018_US_DOD_DR1_LGE_(Vol_1_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 1 of 5)

03_-_2018_US_DOD_DR1_LGE_(Vol_2_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 2 of 5)

04_-_2018_US_DOD_DR1_LGE_(Vol_3_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 3 of 5)

05_-_2018_US_DOD_DR1_LGE_(Vol_4_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 4 of 5)

06_-_2018_US_DOD_DR1_LGE_(Vol_5_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 5 of 5)

2018_US_DOD_DR1_LGE_Attach_to_Q1_-_Industry_Stats.xlsx

2018 US DOD DR1 LGE Attach to Q1 - Industry Stats

2018_US_DOD_DR1_LGE_Attach_to_Q11_-_Table_1.xlsx

2018 US DOD DR1 LGE Attach to Q11 - Table 1

2018_US_DOD_DR1_LGE_Attach_to_Q12_-_Table_2.xlsx

2018 US DOD DR1 LGE Attach to Q12 - Table 2

2018_US_DOD_DR1_LGE_Attach_to_Q13b_-_Reserve_Adjustments.xlsx

2018 US DOD DR1 LGE Attach to Q13b - Reserve Adjustments

2018_US_DOD_DR1_LGE_Attach_to_Q2_-_Att_2_Location_Codes.xlsx

2018 US DOD DR1 LGE Attach to Q2 - Att 2 Location Codes

2018_US_DOD_DR1_LGE_Attach_to_Q2_-_Att_3_Service_Life_Data.xlsx

2018 US DOD DR1 LGE Attach to Q2 - Att 3 Service Life Data

2018_US_DOD_DR1_LGE_Attach_to_Q20_-_Att_1_Capital_Structure.xlsx

2018 US DOD DR1 LGE Attach to Q20 - Att 1 Capital Structure

2018_US_DOD_DR1_LGE_Attach_to_Q20_-_Att_2_Moodys_Credit_Metrics.xlsx

2018 US DOD DR1 LGE Attach to Q20 - Att 2 Moody's Credit Metrics

2018_US_DOD_DR1_LGE_Attach_to_Q20_-_Att_3_SP_Credit_Metrics.xlsx

2018 US DOD DR1 LGE Attach to Q20 - Att 3 SP Credit Metrics

2018_US_DOD_DR1_LGE_Attach_to_Q20_-_McKenzie_Exhibits,_Tables,_Support.xlsm

2018 US DOD DR1 LGE Attach to Q20 - McKenzie Exhibits, Tables, Support

2018_US_DOD_DR1_LGE_Attach_to_Q25_-_Schedule_of_Construction_and_Short_Term.xlsx

2018 US DOD DR1 LGE Attach to Q25 - Schedule of Construction and Short Term

2018_US_DOD_DR1_LGE_Attach_to_Q26_-_Capital_Structure_and_Funding.xlsx

2018 US DOD DR1 LGE Attach to Q26 - Capital Structure and Funding

2018_US_DOD_DR1_LGE_Attach_to_Q3_-_Att_2_Salvage_Data.xlsx

2018 US DOD DR1 LGE Attach to Q3 - Att 2 Salvage Data

2018_US_DOD_DR1_LGE_Attach_to_Q6_-_Current_Approved_Depreciation_Rates.xlsx

2018 US DOD DR1 LGE Attach to Q6 - Current Approved Depreciation Rates

11/29/2018 11:02:37 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Attorney Generals ("AG") first Request for Information for paper and electronic filing - Case No. 2018-00295.


Derek A. Rahn Louisville Gas and Electric Company

01_-_2018_AG_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to AG DR1 11-29-18

02_-_2018_AG_DR1_LGE_(Volume_1_of_3).pdf

2018 LG&E First Data Responses to the AG (Vol 1 of 3)

03_-_2018_AG_DR1_LGE_(Volume_2_of_3).pdf

2018 LG&E First Data Responses to the AG (Vol 2 of 3)

04_-_2018_AG_DR1_LGE_(Volume_3_of_3).pdf

2018 LG&E First Data Responses to the AG (Vol 3 of 3)

2018_AG_DR1_LGE_Attach_to_Q137b.xlsx

2018 AG DR1 LGE Attach to Q137b

2018_AG_DR1_LGE_Attach_to_Q137d_-_Att_1_RC_Class_Order_Ratio_Calcs.xlsx

2018 AG DR1 LGE Attach to Q137d - Att 1 RC Class Order Ratio Calcs

2018_AG_DR1_LGE_Attach_to_Q137d_-_Att_2_Lighting_Company_Use.xlsx

2018 AG DR1 LGE Attach to Q137d - Att 2 Lighting Company Use

2018_AG_DR1_LGE_Attach_to_Q137d_-_Att_3_LGE_8760s.xlsx

2018 AG DR1 LGE Attach to Q137d - Att 3 LGE 8760s

2018_AG_DR1_LGE_Attach_to_Q137d_-_Att_4_Forward_Test_Year.xlsx

2018 AG DR1 LGE Attach to Q137d - Att 4 Forward Test Year

2018_AG_DR1_LGE_Attach_to_Q138.xlsx

2018 AG DR1 LGE Attach to Q138

2018_AG_DR1_LGE_Attach_to_Q141(a)_-_LOLP_May2019_to_April2020.xlsx

2018 AG DR1 LGE Attach to Q141(a) - LOLP May2019 to April2020

2018_AG_DR1_LGE_Attach_to_Q141(e)_-_Att_1_Outage_Rate_May2019_to_April2020.xlsx

2018 AG DR1 LGE Attach to Q141(e) - Att 1 Outage Rate May2019 to April2020

2018_AG_DR1_LGE_Attach_to_Q141(e)_-_Att_2_Max_Capacity_May2019_to_April2020.xlsx

2018 AG DR1 LGE Attach to Q141(e) - Att 2 Max Capacity May2019 to April2020

2018_AG_DR1_LGE_Attach_to_Q145_-_Generating_Units_Actuals.xlsx

2018 AG DR1 LGE Attach to Q145 - Generating Units Actuals

2018_AG_DR1_LGE_Attach_to_Q146a-c,h.xlsx

2018 AG DR1 LGE Attach to Q146a-c,h

2018_AG_DR1_LGE_Attach_to_Q148.xlsx

2018 AG DR1 LGE Attach to Q148

2018_AG_DR1_LGE_Attach_to_Q149.xlsx

2018 AG DR1 LGE Attach to Q149

2018_AG_DR1_LGE_Attach_to_Q158_-_Number_of_Customer_Accounts_by_Rate_Schedule_for_Each_Zip_Code.xlsx

2018 AG DR1 LGE Attach to Q158 - Number of Customer Accounts by Rate Schedule for Each Zip Code

11/29/2018 10:38:59 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to US Department of Defenses first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_US_DOD_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to US DOD DR1 11-29-18

02_-_2018_US_DOD_DR1_LGE_(Vol_1_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 1 of 5)

03_-_2018_US_DOD_DR1_LGE_(Vol_2_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 2 of 5)

04_-_2018_US_DOD_DR1_LGE_(Vol_3_of_5).pdf

2018 LG&E First Data Responses to the US DOD (Vol 3 of 5)

11/29/2018 10:28:46 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Metropolitan Housing Coalition ("MHC") first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_MHC_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to MHC DR1 11-29-18

02_-_2018_MHC_DR1_LGE_-_FINAL.pdf

2018 LGE First Data Responses to the MHC

11/29/2018 10:23:47 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Louisville Metro Governments first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_METRO_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to Louisville Metro DR1 11-29-18

02_-_2018_METRO_DR1_LGE_(Vol_1_of_6)_-_FINAL.pdf

2018 LG&E First Data Responses to the Lou Metro (Vol 1 of 6)

03_-_2018_METRO_DR1_LGE_(Vol_2_of_6)_-_FINAL.pdf

2019 LG&E First Data Responses to the Lou Metro (Vol 2 of 6)

04_-_2018_METRO_DR1_LGE_(Vol_3_of_6)_-_FINAL.pdf

2020 LG&E First Data Responses to the Lou Metro (Vol 3 of 6)

05_-_2018_METRO_DR1_LGE_(Vol_4_of_6)_-_FINAL.pdf

2021 LG&E First Data Responses to the Lou Metro (Vol 4 of 6)

06_-_2018_METRO_DR1_LGE_(Vol_5_of_6)_-_FINAL.pdf

2022 LG&E First Data Responses to the Lou Metro (Vol 5 of 6)

07_-_2018_METRO_DR1_LGE_(Vol_6_of_6)_-_FINAL.pdf

2023 LG&E First Data Responses to the Lou Metro (Vol 6 of 6)

2018_METRO_DR1_LGE_Attach_to_Q106c.xlsx

2018 METRO DR1 LGE Attach to Q106c

2018_METRO_DR1_LGE_Attach_to_Q107.xlsx

2018 METRO DR1 LGE Attach to Q107

2018_METRO_DR1_LGE_Attach_to_Q108_-_Gas_Forecast_10_Years_with_Actuals.xlsx

2018 METRO DR1 LGE Attach to Q108 - Gas Forecast 10 Years with Actuals

2018_METRO_DR1_LGE_Attach_to_Q26.xlsx

2018 METRO DR1 LGE Attach to Q26

2018_METRO_DR1_LGE_Attach_to_Q3_-_METRO_Lights_by_Address.xlsx

2018 METRO DR1 LGE Attach to Q3 - METRO Lights by Address

2018_METRO_DR1_LGE_Attach_to_Q57(a-d)_-_Att_1_2016_Total_Sum_Paid_by_Account.xlsx

2018 METRO DR1 LGE Attach to Q57(a-d) - Att 1 2016 Total Sum Paid by Account

2018_METRO_DR1_LGE_Attach_to_Q57(a-d)_-_Att_2_2017_Total_Sum_Paid_by_Account.xlsx

2018 METRO DR1 LGE Attach to Q57(a-d) - Att 2 2017 Total Sum Paid by Account

2018_METRO_DR1_LGE_Attach_to_Q57(a-d)_-_Att_3_2018_Total_Sum_Paid_by_Account.xlsx

2018 METRO DR1 LGE Attach to Q57(a-d) - Att 3 2018 Total Sum Paid by Account

2018_METRO_DR1_LGE_Attach_to_Q81(c)_-_Non-Utility_Proxy_Group_Cos_Eliminated.xlsx

2018 METRO DR1 LGE Attach to Q81(c) - Non-Utility Proxy Group Cos Eliminated

2018_METRO_DR1_LGE_Attach_to_Q88_-_Historical_ROE.xlsx

2018 METRO DR1 LGE Attach to Q88 - Historical ROE

11/29/2018 10:11:45 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Kentucky School Boards Associations ("KSBA") first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_KSBA_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to KSBA DR1 11-29-18

02_-_2018_KSBA_DR1_LGE.pdf

2018 LGE First Data Responses to the KSBA

2018_KSBA_DR1_LGE_Attach_to_Q14_-_Att_1_Schools.xlsx

2019 KSBA DR1 LGE Attach to Q14 - Att 1 Schools

2018_KSBA_DR1_LGE_Attach_to_Q14_-_Att_2_Non-Schools.xlsx

2019 KSBA DR1 LGE Attach to Q14 - Att 2 Non-Schools

2018_KSBA_DR1_LGE_Attach_to_Q15_-_Peaks.xlsx

2019 KSBA DR1 LGE Attach to Q15 - Peaks

2018_KSBA_DR1_LGE_Attach_to_Q3.xlsx

2019 KSBA DR1 LGE Attach to Q3

2018_KSBA_DR1_LGE_Attach_to_Q5_-_Att_1_Combined_System_Peaks.xlsx

2019 KSBA DR1 LGE Attach to Q5 - Att 1 Combined System Peaks

2018_KSBA_DR1_LGE_Attach_to_Q5_-_Att_2_Hourly_Profiles.xlsx

2019 KSBA DR1 LGE Attach to Q5 - Att 2 Hourly Profiles

11/29/2018 10:03:52 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Kroger Walmarts first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_Kroger_Walmart_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to Kroger & Walmart DR1 11-29-18

02_-_2018_Kroger-Walmart_DR1_LGE.pdf

2018 LG&E First Data Responses to Kroger and Walmart

2018_Kroger-Walmart_DR1_LGE_Attach_to_Q3_-_Exhibit_WSS-27_and_WSS-29_--_LGE_COSS_Functional_Assgmt_and_Class_Alloc.xlsx

2018 Kroger-Walmart DR1 LGE Attach to Q3 - Exhibit WSS-27 and WSS-29 -- LGE COSS Functional Assgmt and Class Alloc

2018_Kroger-Walmart_DR1_LGE_Attach_to_Q5(a-d)_-_TODS_Ratchet_Analysis.xlsx

2018 Kroger-Walmart DR1 LGE Attach to Q5(a-d) - TODS Ratchet Analysis

2018_Kroger-Walmart_DR1_LGE_Attach_to_Q6(c(ii))_-_Capitalization_vs._Rate_Base.xlsx

2018 Kroger-Walmart DR1 LGE Attach to Q6(c(ii)) - Capitalization vs. Rate Base

2018_Kroger_Walmart_DR1_LGE_Attach_to_Q7(a).xlsx

2018 Kroger Walmart DR1 LGE Attach to Q7(a)

2018_Kroger_Walmart_DR1_LGE_Attach_to_Q7(c).xlsx

2018 Kroger Walmart DR1 LGE Attach to Q7(c)

11/29/2018 9:54:00 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Kentucky Industrial Utility Customers ("KIUC") first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_KIUC_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to KIUC DR1 11-29-18

02_-_2018_KIUC_DR1_LGE_Vol_1_of_2.pdf

2018 LG&E First Data Responses to the KIUC (Vol 1 of 2)

03_-_2018_KIUC_DR1_LGE_Vol_2_of_2.pdf

2018 LG&E First Data Responses to the KIUC (Vol 2 of 2)

2018_KIUC_DR1_LGE_Attach_to_Q10_-_WN_values_Aug17-Jul18.xlsx

2018 KIUC DR1 LGE Attach to Q10 - WN values Aug17-Jul18

2018_KIUC_DR1_LGE_Attach_to_Q13a.xlsx

2018 KIUC DR1 LGE Attach to Q13a

2018_KIUC_DR1_LGE_Attach_to_Q17a_-_30_year_energy_and_demand_forecasts.xlsx

2018 KIUC DR1 LGE Attach to Q17a - 30 year energy and demand forecasts

2018_KIUC_DR1_LGE_Attach_to_Q17b_-_Actual_and_WN_Usage_Jan18-Jun18.xlsx

2018 KIUC DR1 LGE Attach to Q17b - Actual and WN Usage Jan18-Jun18

2018_KIUC_DR1_LGE_Attach_to_Q17d_-_@Risk_Model_-_PUBLIC.xlsx

2018 KIUC DR1 LGE Attach to Q17d - @Risk Model - PUBLIC

2018_KIUC_DR1_LGE_Attach_to_Q18_-_Att_1_KPI_Reports.xlsx

2018 KIUC DR1 LGE Attach to Q18 - Att 1 KPI Reports

2018_KIUC_DR1_LGE_Attach_to_Q26_-_Att_4_Table_1.xlsx

2018 KIUC DR1 LGE Attach to Q26 - Att 4 Table 1

2018_KIUC_DR1_LGE_Attach_to_Q26_-_Att_5_Table_2.xlsx

2018 KIUC DR1 LGE Attach to Q26 - Att 5 Table 2

2018_KIUC_DR1_LGE_Attach_to_Q34_-_Depreciation_Analysis.xlsx

2018 KIUC DR1 LGE Attach to Q34 - Depreciation Analysis

2018_KIUC_DR1_LGE_Attach_to_Q35(f)_-_Att_3_CR_Demo_-_Amec_Abatement_ROM_2015.xlsx

2018 KIUC DR1 LGE Attach to Q35(f) - Att 3 CR Demo - Amec Abatement ROM 2015

2018_KIUC_DR1_LGE_Attach_to_Q47.xlsx

2018 KIUC DR1 LGE Attach to Q47

2018_KIUC_DR1_LGE_Attach_to_Q61.xlsx

2018 KIUC DR1 LGE Attach to Q61

2018_KIUC_DR1_LGE_Attach_to_Q70.xlsx

2018 KIUC DR1 LGE Attach to Q70

2018_KIUC_DR1_LGE_Attach_to_Q8.xlsx

2018 KIUC DR1 LGE Attach to Q8

2018_KIUC_DR1_LGE_Attach_to_Q9_-_Calendar_Forecast.xlsx

2018 KIUC DR1 LGE Attach to Q9 - Calendar Forecast

11/29/2018 9:25:24 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to Charters first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_Charter_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to Charter DR1 11-29-18

02_-_2018_Charter_DR1_LGE.pdf

2018 LG&E First Data Responses to the Charter

11/29/2018 9:19:35 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company (LGE") Responses to Association of Community Ministries, Inc. ("ACM") first Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_ACM_DR1_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to ACM DR1 11-29-18

02_-_2018_ACM_DR1_LGE.pdf

2018 LG&E First Data Responses to ACM

2018_ACM_DR1_LGE_Attach_to_Q01(a)(b)_-_3rd_Party_Assistance.xlsx

2018 ACM DR1 LGE Attach to Q01(a)(b) - 3rd Party Assistance

2018_ACM_DR1_LGE_Attach_to_Q02(a)(b)_-_3rd_Party_Asst_by_ZIP.xlsx

2018 ACM DR1 LGE Attach to Q02(a)(b) - 3rd Party Asst by ZIP

2018_ACM_DR1_LGE_Attach_to_Q04(a)(b)(c)_-_Att_1_Disconnects,_Reconnects,_and_3rd_Party_Assistance.xlsx

2018 ACM DR1 LGE Attach to Q04(a)(b)(c) - Att 1 Disconnects, Reconnects, and 3rd Party Assistance

2018_ACM_DR1_LGE_Attach_to_Q04(a)(b)(c)_-_Att_2_Disconnects,_Reconnects,_and_3rd_Party_Assistance.xlsx

2018 ACM DR1 LGE Attach to Q04(a)(b)(c) - Att 2 Disconnects, Reconnects, and 3rd Party Assistance

2018_ACM_DR1_LGE_Attach_to_Q04(a)(b)(c)_-_Att_3_Disconnects,_Reconnects,_and_3rd_Party_Assistance_.xlsx

2018 ACM DR1 LGE Attach to Q04(a)(b)(c) - Att 3 Disconnects, Reconnects, and 3rd Party Assistance

2018_ACM_DR1_LGE_Attach_to_Q05(a)(b)_-_Average_Annual_Usage.xls

2018 ACM DR1 LGE Attach to Q05(a)(b) - Average Annual Usage

2018_ACM_DR1_LGE_Attach_to_Q06(a)(b)_-_Average_Annual_Usage_Low_Income.xls

2018 ACM DR1 LGE Attach to Q06(a)(b) - Average Annual Usage Low Income

2018_ACM_DR1_LGE_Attach_to_Q07(a)_-_Att_1Electric_Average_Annual_Usage_by_Zip_Code.xls

2018 ACM DR1 LGE Attach to Q07(a) - Att 1Electric Average Annual Usage by Zip Code

2018_ACM_DR1_LGE_Attach_to_Q07(b)_-_Att_1Gas_Average_Annual_Usage_by_Zip_Code.xls

2018 ACM DR1 LGE Attach to Q07(b) - Att 1Gas Average Annual Usage by Zip Code

2018_ACM_DR1_LGE_Attach_to_Q12_-_Residential_Accounts.xlsx

2018 ACM DR1 LGE Attach to Q12 - Residential Accounts

2018_ACM_DR1_LGE_Attach_to_Q8_-_Avg_Res_Gas_Bill.xlsx

2018 ACM DR1 LGE Attach to Q8 - Avg Res Gas Bill

2018_ACM_DR1_LGE_Attach_to_Q9_-_Avg_Res_Elec_Bill.xlsx

2018 ACM DR1 LGE Attach to Q9 - Avg Res Elec Bill

11/29/2018 9:07:53 AM

Enclosed please find and accept for filing Louisville Gas and Electric Company ("LGE") Responses to the Kentucky Public Service Commissions ("KPSC") second Request for Information for paper and electronic filing - Case No. 2018-00295.


Michael E. Hornung Louisville Gas and Electric Company

01_-_2018_PSC_DR2_LGE_Filing_Letter_due_11-29-18_SIGNED.pdf

READ FIRST - LG&E Filing Letter to PSC DR2 11-29-18

02_-_2018_PSC_DR2_LGE_-_FINAL.pdf

2018 LG&E Second Data Responses to the PSC

2018_PSC_DR2_LGE_Attach_to_Q29a-b.xlsx

2018 PSC DR2 LGE Attach to Q29a-b

2018_PSC_DR2_LGE_Attach_to_Q32_-_EV_Charges_Derivation.xlsx

2018 PSC DR2 LGE Attach to Q32 - EV Charges Derivation

2018_PSC_DR2_LGE_Attach_to_Q62c_-_Deferred_Tax_Detail.xlsx

2018 PSC DR2 LGE Attach to Q62c - Deferred Tax Detail

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Capex_Slippage_Calc_Support.xlsx

2018 PSC DR2 LGE Attach to Q75d - Capex_Slippage_Calc_Support

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Depreciation_Exp_Wkpr_Electric.xlsx

2018 PSC DR2 LGE Attach to Q75d - Depreciation_Exp_Wkpr_Electric

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Depreciation_Exp_Wkpr_Gas.xlsx

2018 PSC DR2 LGE Attach to Q75d - Depreciation_Exp_Wkpr_Gas

2018_PSC_DR2_LGE_Attach_to_Q75d_-_LGE_WSS-27_WSS-29_LGE_COSS_Functional_Assgmt_and_Class_Alloc_Slippage_Factor_Applied.xlsx

2018 PSC DR2 LGE Attach to Q75d - LGE_WSS-27_WSS-29_LGE_COSS_Functional_Assgmt_and_Class_Alloc_Slippage_Factor_Applied

2018_PSC_DR2_LGE_Attach_to_Q75d_-_LGE_WSS-9_WSS-10_WSS-11_WSS-12_WSS-33_WSS-34_LGE_Gas_COSS_Slippage_Factor_Applied.xlsx

2018 PSC DR2 LGE Attach to Q75d - LGE_WSS-9_WSS-10_WSS-11_WSS-12_WSS-33_WSS-34_LGE_Gas_COSS_Slippage_Factor_Applied

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_A_Electric.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_A_Electric

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_A_Gas.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_A_Gas

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_B_Electric.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_B_Electric

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_B_Gas.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_B_Gas

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_C_and_D_Electric.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_C_and_D_Electric

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_C_and_D_Gas.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_C_and_D_Gas

2018_PSC_DR2_LGE_Attach_to_Q75d_-_Schedule_J.xlsx

2018 PSC DR2 LGE Attach to Q75d - Schedule_J

2018_PSC_DR2_LGE_Attach_to_Q76a_-_Construction_Projects_Electric.xlsx

2018 PSC DR2 LGE Attach to Q76a - Construction Projects Electric

2018_PSC_DR2_LGE_Attach_to_Q76a_-_Construction_Projects_Gas.xlsx

2018 PSC DR2 LGE Attach to Q76a - Construction Projects Gas

2018_PSC_DR2_LGE_Attach_to_Q76b_-_Construction_Projects_Electric.xlsx

2018 PSC DR2 LGE Attach to Q76b - Construction Projects Electric

2018_PSC_DR2_LGE_Attach_to_Q76b_-_Construction_Projects_Gas.xlsx

2018 PSC DR2 LGE Attach to Q76b - Construction Projects Gas

2018_PSC_DR2_LGE_Attach_to_Q77_-_CWIP_Electric.xlsx

2018 PSC DR2 LGE Attach to Q77 - CWIP Electric

2018_PSC_DR2_LGE_Attach_to_Q77_-_CWIP_Gas.xlsx

2018 PSC DR2 LGE Attach to Q77 - CWIP Gas

11/29/2018 8:51:51 AM

Louisville Gas and Electric Company ("LGE") Petition for Confidential Protection and Motion to Deviate regarding certain information in this filing pertaining to data-request responses LGE filed in the above referenced matter on January 25, 2017 - Case No.


Michael E. Hornung Louisville Gas and Electric Company

01-_READ_FIRST_-_LGE_Filing_Letter_for_Conf_Pro_and_Deviation.pdf

READ FIRST - LG&E Filing Letter for Confidential Protection and Motion for Deviation

02_-_LGE_Signed_Petition_for_Confidential_Protection.pdf

LG&E Signed Petition for Confidential Protection

03_-_LGE_Signed_Motion_to_Deviate.pdf

LG&E Signed Motion to Deviate

11/27/2018 5:06:34 PM

Statement of Metropolitan Housing Coalition Regarding Receipt of Electronic Transmissions, and Read First Letter


Tom FitzGerald Metropolitan Housing Coalition

MHCStatementReElectronicTransmissions.pdf

Statement of Metropolitan Housing Coalition Regarding Receipt of Electronic Transmissions)

Read_First_2.pdf

(Read First)

11/26/2018 6:21:27 PM

LGE Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_11-26-18.pdf

LG&E Supplemental Responses to PSC 1-46 and 1-59(c)

11/26/2018 4:31:44 PM

Statement of Association of Community Ministries Regarding Receipt of Electronic Transmissions


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_11262018.pdf

Read first cover letter

11/19/2018 4:48:38 PM

Sierra Clubs Provisional Data Requests pending full intervention


Joe F Childers Amy Waters, Joe Dutkiewicz, and Sierra Club

2018.11.20_Sierra_Clubs_Initial_Data_Requests_to_LGE.pdf

Sierra Club's Provisional Data Requests pending full intervention

11/16/2018 2:48:06 PM

The Kroger Companys and Walmart Inc.s Statement on Electronic Filing Procedures


Mark E. Heath The Kroger Company and Walmart Inc.

2018-00295_-_Kroger_and_Walmart_Statement_on_Electronic_Filing_Procedures.pdf

Kroger and Walmart Statement on Electronic Filing Procedures

11/16/2018 2:19:20 PM

Order Entered: Ms. Miller's request to intervene is denied.


11/16/2018 2:17:57 PM

Order Entered: Paul Werner and Hannah Wigger are admitted pro hac vice for the purpose of representing Charter Communications in association with Janice Theriot and Laurence Zielke in the above-styled proceeding, provided that Janice Theriot, Laurence Zielke, or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


11/15/2018 4:37:28 PM

Response to the Commissions October 9, 2018 Order


M. Todd Osterloh Louisville/Jefferson County Metro Government

01041720.PDF

Louisville Metro Read First Letter

01041721.PDF

Louisville Metro Response to the Commissions October 9, 2018 Order

11/13/2018 9:32:09 PM

Tendered First Set of Data Requests from Metropolitan Housing Coalition to Louisville Gas And Electric Company


Tom FitzGerald Metropolitan Housing Coalition

Tendered_First_Set_of_Data_Requests_from_MHC_to_LGE.pdf

(Tendered First Set of Data Requests From Metropolitan Housing Coalition to Louisville Gas And Electric Company)

11/13/2018 6:56:57 PM

First Requests for Information


Lisa Kilkelly Association of Community Ministries

ACM_First_Requests_For_Information.pdf

First Requests for Information of Association of Community Ministries

ACM_Read1st_11132018.pdf

Read First Cover Letter

11/13/2018 6:50:12 PM

Attorney Generals Initial Data Requests


Kent A Chandler Kentucky Office of the Attorney General

Case_No._2018-00295-_Attorney_Generals_Initial_Data_Requests.pdf

Attorney General's Initial Data Requests- LG&E

11/13/2018 6:03:45 PM

Louisville Metro First Request for Information to LGE


M Todd Osterloh

Louisville_Metro_DR1_to_LGE_(01040983xA9D25).pdf

Louisville Metro First Request for Information to LG&E

11/13/2018 5:19:09 PM

First Requests for Information to LGE


Robert C. Moore The Kroger Company and Walmart Inc.

Kroger-Walmart_LGE_First_Requests_for_Information_11-13-18.PDF

The Kroger Company's and Walmart Inc.'s First Requests for Information to LG&E

11/13/2018 3:57:08 PM

KIUC First Set Data Requests to Louisville Gas and Electric Company


michael l kurtz Kentucky Industrial Utility Customers, Inc. (KIUC)

1st_Set_Data_Requests_of_KIUC_to_LGE.pdf

KIUC 1st Set Data Requests to Louisville Gas & Electric Company

11/13/2018 2:56:08 PM

First Requests for Information


Janice Theriot Charter Communications Operating LLC

11/13/2018 2:54:19 PM

Motion to Admit Counsel to Appear Pro Hac Vice


Janice Theriot Charter Communications Operating LLC

11/13/2018 2:51:16 PM

Affirmation of Electronic Transmission and Notices


Janice Theriot Charter Communications Operating LLC

11/13/2018 2:20:33 PM

Response to Commission Order re: email service


Matthew Malone Kentucky School Boards Association

11/13/2018 1:28:17 PM

First Data Requests to LGE from KSBA


Matthew Malone Kentucky School Boards Association

First_Data_Requests_to_LGE.pdf

First Data Requests to LG&E from KSBA

11/13/2018 11:53:07 AM

Data Request


11/13/2018 7:54:45 AM

DoD-FEAs Written Statement on Electronic Service


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

Statement_on_Electronic_Service.pdf

DoD-FEA's Statement on Electronic Service

11/13/2018 7:48:03 AM

DoD-FEAs 1st Request for Information to LGE


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

1st_RFI_to_LGE.pdf

DoD-FEA's 1st RFI to LG&E

11/12/2018 4:12:16 PM

LGE Supplemental Response to Question No. 48(a)(9) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_Read1st.pdf

Cover Letter

2_-_LGE_Supplemental_Response_PSC_DR_1-48(a)(9).pdf

LG&E Supplemental Response to PSC 1-48(a)(9)

11/9/2018 4:08:09 PM

Order Entered: Motions to intervene filed by MHC and ACM are denied.


11/9/2018 4:05:15 PM

Order Entered: Movants' motion to intervene is denied.


11/9/2018 3:12:14 PM

Order Entered: 1. The motions to intervene of Kroger and Walmart are granted on a joint basis and they shall be considered as one party. 2. Kroger and Walmart, on a joint basis, shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Kroger and Walmart, on a joint basis, shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Kroger and Walmart, on a joint basis, shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


11/9/2018 2:53:11 PM

Order Entered: 1. The motion of Louisville Metro Government to intervene is granted. 2. Louisville Metro Government shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with fi led testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Louisville Metro Government shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Louisville Metro Government shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


11/9/2018 2:48:30 PM

Order Entered: 1. The motion of the US DoD to intervene is granted. 2. The US DoD shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The US DoD shall comply with all provisions of the Commission's regulation s, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001 , Section 8(9), within seven days of entry of this Order, the US DoD shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


11/9/2018 2:45:18 PM

Order Entered: 1. The motion of KSBA to intervene is granted. 2. KSBA shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KSBA shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, KSBA shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


11/9/2018 2:41:14 PM

Order Entered: 1. The motion of Charter to intervene is granted. 2. Charter shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Charter shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Charter shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


11/9/2018 8:06:20 AM

Louisville Gas and Electric Companys ("LGE") Certificate of Completed Notice.


Derek A Rahn Louisville Gas and Electric Company

2_-_LGE_Certificate_of_Completed_Notice_11-09-2018.pdf

LG&E Certificate of Completed Notoice

10/29/2018 12:52:00 PM

LGEs Supplemental Responses to Question Nos. 46 and 59(c) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2_-_Supplemental_Responses_Filed_10-29-18.pdf

LG&E's Supplemental Responses to PSC 1-46 and 1-59(c)

10/29/2018 10:02:06 AM

Motion to Intervene


Matt Malone The Kentucky School Boards Association

10/26/2018 4:29:45 PM

Louisville Metro Motion to Intervene


M Todd Osterloh

10/26/2018 12:31:12 PM

Motion to Intervene


Lisa Kilkelly Association of Community Ministries

ACM_Motion_to_Intervene_10262018.pdf

Motion to Intervene of Association of Community Ministries

ACM_Read1st_10262018.pdf

Read First Cover Letter

10/25/2018 3:05:37 PM

Amy Waters, Joe Dutkiewicz and Sierra Club’s Motion to Intervene in Case No. 2018-295 Adjustment of Electric Rates for Louisville Gas Electric Company


Joe F. Childers Joe F. Childers Associates

2018(1).10

Cover Letter

Sierra_Club_Motion_to_Intervene_-_LGE_rate_case_2018-00295(1).pdf

Amy Waters, Joe Dutkiewicz and Sierra Club’s Motion to Intervene in Case No. 2018-295 Adjustment of Electric Rates for Louisville Gas & Electric Company

Sierra_Club_Motion_to_Intervene_-_LGE_rate_case_2018-00295.pdf

Amy Waters, Joe Dutkiewicz and Sierra Club’s Motion to Intervene in Case No. 2018-295 Adjustment of Electric Rates for Louisville Gas & Electric Company

10/25/2018 2:07:24 PM

Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. KIUC shall adhere to the procedural schedule set forth in the Commission's October 11, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001 , Section 8(9), within seven days of entry of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


10/23/2018 2:18:13 PM

LGEs Supplemental Response to Question No. 48(a)(9) of the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

2-Supplemental_Response_to_Question_No._48(a)(9).pdf

LG&E Supplemental Response to PSC 1-48(a)(9)

10/16/2018 2:33:20 PM

Attorney Generals Response to Commissions Orders


Kent A Chandler Kentucky Office of the Attorney General

Response_to_Orders_Case_Nos._2018-00294__2018-00295.pdf

Attorney General's Response to Commission's Orders

10/16/2018 2:28:20 PM

Motion to Intervene of Walmart Inc.


Don C. A. Parker Walmart Inc.

10/16/2018 2:19:35 PM

Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


10/16/2018 9:25:04 AM

LGE files John J. Spanos verification page


Rick E. Lovekamp Louisville Gas and Electric Company

1-Read1st.pdf

Read 1st - Cover Letter

Spanos_Verification_Page.pdf

Spanos Verification Page

10/15/2018 3:08:32 PM

Objection to Request for Intervention


Kendrick R. Riggs Louisville Gas Electric Company

LGE_Objection_to_Request_for_Intervention_2018-00295.pdf

LG&E Objection to Ms. Teresa Miller's Request for Intervention

LGE_Read1st.pdf

Transmittal Letter

10/15/2018 3:03:42 PM

Charter Communications Motion to Intervene


Janice M. Theriot Charter Communications Operating LLC

Charters_Motion_to_Intervene_LGE.pdf

Charter Communication's Motion to Intervene

10/12/2018 3:40:17 PM

Corrected first page of READ FIRST - LGE Filing Letter. Submitted per request of PSC Staff to replace filed READ FIRST - LGE Filing Letter submitted 10-12-18


Derek A Rahn Louisville Gas and Electric Company

1_-_Corrected_LGE_Filing_Letter_1st_DR_10-12-18.pdf

Corrected LG&E "READ FIRST LG&E Filing Letter" 1st Page

10/12/2018 12:45:27 PM

LGE Responses to the Commission Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

1_-_LGE_Filing_Letter_1st_DR_10-12-18_.pdf

READ FIRST - LG&E Filing Letter to the PSC 1st Data Responses

2_-_LGE_Petition_for_Confidential_Protection_for_PSC_1st_DR.pdf

LG&E Petition for Confidential Protection to PSC 1st Data Responses

3_-_PSC_DR1_LGE_Vol_1_of_5.pdf

LG&E 1st Data Responses to the PSC - Part 1 (Q1 thru Q8)

4_-_PSC_DR1_LGE_Vol_2_of_5.pdf

LG&E 1st Data Responses to the PSC - Part 1 (Q9 thru Q38)

5_-_PSC_DR1_LGE_Vol_3_of_5.pdf

LG&E 1st Data Responses to the PSC - Part 1 (Q39 thru Q49)

6_-_PSC_DR1_LGE_Vol_4_of_5.pdf

LG&E 1st Data Responses to the PSC - Part 1 (Q50)

7_-_PSC_DR1_LGE_Vol_5_of_5.pdf

LG&E 1st Data Responses to the PSC - Part 1 (Q51 thru Q70)

Att_LGE_PSC_1-65_Depreciation_Exp_Wkpr_Electric.xlsx

LG&E Depreciation Expense Workpaper - Electric

Att_LGE_PSC_1-65_Depreciation_Exp_Wkpr_Gas.xlsx

LG&E Depreciation Expense Workpaper - Gas

Att_LGE_PSC_1-65_LGE_Cash_Working_Capital_12ME_Dec_2017_Final.xlsx

LG&E Cash Working Capital for 12ME December 2017

10/11/2018 12:26:09 PM

Order Entered: 1. LG&E's proposed rates are suspended for six months, up to and including April 30, 2019. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with an original in paper medium and an electronic version to the Commission. Electronic documents shall be in portable document format (PDF), shall be searchable and shall be appropriately bookmarked. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, shall be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material aspect.


10/9/2018 10:53:05 AM

Petition to Intervene


Emily W. Medlyn United States Department of Defense and all other Federal Executive Agencies

Exhibit_A_DoD-FEA_Petition_to_Intervene.pdf

Exhibit A Petition to Intervene

10/9/2018 10:18:11 AM

Teresa Miller Request to Intervene


10/5/2018 1:17:09 PM

20181005_PSC No Deficiency Letter.pdf


10/3/2018 2:44:36 PM

Kentucky Industrial Utility Customers, Inc. (KIUC) Motion to Intervene


michael l kurtz Kentucky Industrial Utility Customers, Inc. (KIUC)

10/2/2018 8:43:20 AM

Attorney Generals Motion to Intervene


Kent A Chandler Kentucky Office of the Attorney General

10/1/2018 9:04:26 PM

Metropolitan Housing Coalition Motion for Full Intervention, Read First


Tom FitzGerald Metropolitan Housing Coalition

MHC_Motion_For_Full_Intervention.pdf

(Metropolitan Housing Coalition Motion For Full Intervention)

Read_First_1.pdf

(Read First)

10/1/2018 2:41:56 PM

Petition for Full Intervention


Robert C. Moore The Kroger Company

Kroger_Petition_to_Intervene_LGE_2018-295.PDF

Petition for Full Intervention of The Kroger Company

9/28/2018 8:40:20 AM

Louisville Gas and Electric Companys Statutory Notice, Customer Notice of Rate Adjustment, Application, Filing Requirements, Direct Testimony, and Petition for Confidential Protection for of an adjustment of its Electric and Gas Rates. - Case No 2018-00295


Derek A Rahn Louisville Gas and Electric Company

1_-_Read1st.pdf

Read First - LG&E Application Cover Letter

10_-_LGE_Testimony_and_Exhibits_1_of_3.pdf

LG&E Testimony and Exhibits for: Thompson, Blake, Bellar, Sinclair, Meiman, Arbough

11_-_LGE_Testimony_and_Exhibits_2_of_3.pdf

LG&E Testimony and Exhibits for: McKenzie, Garrett, Spanos, Conroy

12_-_LGE_Testimony_and_Exhibits_3_of_3.pdf

LG&E Testimony and Exhibits for: Seelye

2_-_LGE_Petition_for_Confidential_Protection.pdf

LG&E Petition for Confidential Protection

3_-_LGE_Statutory_Notice.pdf

LG&E Statutory Notice

4_-_Customer_Notice_of_Rate_Adjustment.pdf

LG&E Customer Notice of Rate Adjustment

5_-_LGE_Application_(2018-00295).pdf

LG&E Application Case No. 2018-00295

6_-_LGE_Table_of_Contents.pdf

LG&E Table of Contents

7_-_LGE_Filing_Requirements_Part_1_(Tabs_1-45).pdf

LG&E Filing Requirements (Tabs 1-45)

8_-_LGE_Filing_Requirements_Part_2_(Tab_46).pdf

LG&E Filing Requirements (Tab 46)

9_-_LGE_Filing_Requirements_Part_3_(Tabs_47-68).pdf

LG&E Filing Requirements (Tabs 47-68)

9/19/2018 2:48:13 PM

Data Request


8/27/2018 2:05:29 PM

20180827_PSC Acknowledgement Letter.pdf


8/27/2018

Louisville Gas and Electric Company Notice of Intent to File Application for an Adjustment of Its Electric and Gas Rates Using Electronic Filing Procedures


20180827_Louisville Gas and Electric Company Notice of Intent and Election.pdf

Louisville Gas and Electric Company Notice of Intent and Election