|
Order Date | Document | Case Number |
1/2/2018
|
20180102_PSC_ORDER.pdf
|
2017-00383
|
1/3/2018
|
PSC_ORDER
Final Order Entered: 1. Pursuant to KRS 278.990(1 ), Jackson Purchase is assessed a civil penalty in the total amount of $20,000 for seven violations of 807 KAR 5:041, Section 3(1 ), and one violation of 807 KAR 5:006, Section 26. 2. Jackson Purchase shall pay $20,000 within 30 days of the date of this Order by cashier's check or money order payable to the Kentucky State Treasurer, and mailed or delivered to the Office of the General Counsel, Kentucky Public Service Commission, 21 1 Sower Boulevard, Post Office Box 615, Frankfort, Kentucky 40602. 3. Jackson Purchase shall provide to the Commission results of its evaluation of whether to document pre-job briefings for outage response and maintenance activities within 30 days of the date of this Order.
|
2017-00202
|
1/3/2018
|
STAFF_REPORT
Notice of Filing of Staff Report
|
2017-00371
|
1/4/2018
|
20180104_PSC_ORDER.pdf
|
2018-00005
|
1/4/2018
|
20180104_PSC_ORDER.pdf
|
2017-00446
|
1/4/2018
|
20180104_PSC_ORDER.pdf
|
2017-00441
|
1/5/2018
|
PSC_ORDER
Final Order Entered: 1. Big Rivers request for a declaration that, under the terms of the Power Sales Contract, as amended, it is not required to pay for any variable costs associated with Excess Henderson Energy that it declines to take is granted. 2. Big Rivers alternative request that, in the event that the Commission finds that Big Rivers is required to pay for the variable costs associated with Excess Henderson Energy, the Commission declare the provision not fair, just, and reasonable, is denied as moot.
|
2016-00278
|
1/5/2018
|
PSC_ORDER
Final Order Entered: 1. Murray's request to deviate from the water storage requirements of 807 KAR 5:066, Section 4(4), is granted and approved through January 31, 2021. 2. Murray shall inform the Commission in writing if changes occur in either system that would cause the City of Murray to have insufficient storage for Murray. 3. Beginning June 1, 2018, and every six months thereafter, Murray shall file with the Commission a written report of its efforts to obtain a written agreement regarding water storage and the progress of acquisition negotiations with the City of Murray. If
these semi-annual reports are not timely filed, the Commission will initiate a show cause action against Murray's commissioners for failure to obey an Order of the Commission. 4. In the event that Murray has neither secured a written agreement with nor been acquired by the City of Murray by December 1, 2020, Murray shall file an application for a deviation from 807 KAR 5:066, Section 4(4), on or before January 3, 2021.
5. Any documents filed in the future pursuant to ordering paragraphs 2, 3, and 4 shall reference this case number and shall be retained in the utility's general correspondence file. 6. The Executive Director is delegated authority to grant reasonable extensions of time for the filing of any documents required by this Order upon Murray's showing of good cause for such extension.
|
2016-00400
|
1/5/2018
|
PSC_ORDER
Final Order Entered: 1. The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The general service rates proposed by North Mclean are denied. 3. The rates set forth in the Appendix to this Order are approved for services rendered by North Mclean on and after the date of this Order. 4. Within 20 days of the date of this Order, North Mclean shall file with this
Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order.
|
2017-00253
|
1/5/2018
|
PSC_ORDER
Final Order Entered: 1. EKPC's request to submit this case for a decision on the existing evidence of record without a hearing is granted. 2. The amounts billed by EKPC through its environmental surcharge for the period July 1, 2015, to June 30, 2017, are approved. 3. EKPC shall use a rate of return of 6.075 percent in all monthly environmental surcharge filings subsequent to the date of this Order. 4. EKPC's Member Cooperatives shall include the applicable monthly retail pass-through adjustments, shown in the Appendix to this Order, in the determination of each Member Cooperative's respective pass-through mechanism in each of the first six months following the date of this order, as discussed herein.
|
2017-00326
|
1/5/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2017-00376
|
1/5/2018
|
PSC_ORDER
Final Order Entered: 1. Nolin is granted a CPCN that authorizes it to bid on a franchise offered by the city of Hodgenville, Kentucky, for electric transmission and distribution service. 2. If Nolin is not the successful bidder, Nolin shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Nolin was not the successful bidder. 3. If Nolin is the successful bidder, Nolin shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Nolin is the successful bidder, Nolin shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2017-00480
|
1/5/2018
|
20180105_PSC_ORDER.pdf
|
2017-00321
|
1/5/2018
|
20180105_PSC_ORDER.pdf
|
2017-00481
|
1/5/2018
|
20180105_PSC_ORDER01.pdf
|
2017-00481
|
1/5/2018
|
20180105_PSC_ORDER.pdf
|
2017-00477
|
1/5/2018
|
20180105_PSC_ORDER01.pdf
|
2017-00477
|
1/8/2018
|
DATA_REQUEST
COMMISSION STAFF'S THIRD REQUEST FOR INFORMATION TO BIG SANDY RURAL ELECTRIC COOPERATIVE CORPORATION
|
2017-00374
|
1/9/2018
|
20180109_PSC_ORDER.pdf
Order Entered nunc pro tunc, that the Commission's December 22, 2017 Order is altered as specified herein.
|
2017-00263
|
1/9/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 270 feet in height, with attached antennas, and to be located at 5545 Caneyville Road, Morgantown, Butler County, Kentucky. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2017-00369
|
1/9/2018
|
PSC_ORDER
Order Entered: 1. Ms. Rule's Complaint is dismissed without prejudice in regard to the allegations that she was overcharged for electric service between January 2016 and the current date, and for gas service between January 2016 and March 20, 2017, and between May 20, 2017 and the current date. 2. Ms. Rule's Complaint established a prima facie case regarding alleged overcharges for gas service between March 21 , 2017, and May 19, 2017. 3. Pursuant to 807 KAR 5:001, Section 20, Duke Kentucky shall satisfy the matters complained of regarding alleged overcharges for gas service between March 21, 2017, and May 19, 2017, or file a written answer to the complaint within ten days from the date of service of this Order. 4. Should documents of any kind be filed with the Commission in the course of this proceeding, the documents also shall be served on all parties of record. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that personal information cannot be read.
|
2017-00403
|
1/9/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.33 per 1,000 gallons is approved. 2. The rates as set forth in Appendix B to this Order are approved for water service rendered by Dexter-Almo on and after January 1, 2018. 3. Within 20 days of the date of this Order, Dexter-Almo shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2017-00465
|
1/9/2018
|
20180109_PSC_ORDER.pdf
Kentucky Power is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days of the date of service of this Order.
|
2017-00472
|
1/10/2018
|
PSC_ORDER
Final Order Entered: 1. Within ten days of the date of service of this Order, Center Ridge shall pay to Peggy S. Rose the amount of $36.80. 2. On or before January 31, 2018, Center Ridge will provide written proof to the Commission that it has made the required refund to Peggy S. Rose.
3. If Center Ridge does not provide the relief as prescribed in ordering paragraph number 1, the Commission shall initiate an investigation in which Center Ridge will be required to show cause as to why it should not be subject to the penalties enumerated in KRS 278.990 for violation of a Commission Order. 4. This case is closed and removed from the Commission docket.
|
2017-00164
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits billed by East Kentucky through its FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00283
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Big Sandy through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00288
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Blue Grass through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00289
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Clark Energy through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00290
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Cumberland Valley through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00291
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Farmers through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00292
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Fleming-Mason through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00293
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Grayson through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00294
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Inter-County through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00295
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Jackson Energy through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00296
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Licking Valley through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00297
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Nolin through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00298
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Owen through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00299
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Salt River through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00300
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Shelby Energy through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00301
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by South Kentucky through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00302
|
1/10/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Taylor County through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00303
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2016-00162
|
1/10/2018
|
20180110_PSC_ORDER01.pdf
|
2016-00162
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2017-00282
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2017-00284
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2017-00285
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2017-00286
|
1/10/2018
|
20180110_PSC_ORDER.pdf
|
2017-00343
|
1/11/2018
|
20180111_PSC_ORDER.pdf
Order Entered: 1. Martin District's motion is granted. 2. The information requested in the Commission's December 21 , 2017 Order, including Martin County Concerned Citizens' remaining requests for information, is due no later than February 13, 2018. 3. No
|
2016-00142
|
1/11/2018
|
PSC_ORDER
Order Entered nunc pro tunc, that:
1. The third sentence on page 8 of the January 3, 2018 Order is amended to read as follows: He acknowledged that there was no documentation of the job briefing, but stated that the NESC does not require a record of the briefing.
2. All other provisions of the Commission's Order entered on January 3, 2018, shall remain in full force and effect.
|
2017-00202
|
1/11/2018
|
PSC_ORDER
Final Order Entered: 1. OWS's request to deviate is granted in part and denied in part. 2. OWS's request to deviate from 807 KAR 5:006, Sections 10(1), 14(1), 14(1)(b)(2), 14(1)(c)(1), 14(3)(b), 23, and 24; and 807 KAR 5:011, Sections 2(4), 8(4)(e), and 12, is granted for a period of three years from the date of entry of this Order. 3. OWS's request to deviate from 807 KAR 5:006, Section 3(a) and 807 KAR 5:011, Section 3(2)(a) is denied.
4. OWS shall file documents in compliance with 807 KAR 5:006, Section 3(a) and 807 KAR 5:011, Section 3(2)(a) within 30 days of the date of entry of this Order 5. No less than three months prior to the expiration of the deviation granted through this Order, OWS shall file a written notice indicating whether it will submit a request for a successive deviation. If OWS, through the written notice, indicates that it does not plan to request a successive deviation, OWS shall state how it will comply with from 807 KAR 5:006, Sections 3(a),10(1), 14(1), 14(1)(b)(2), 14(1)(c)(1 ), 14(3)(b), 23,
and 24; and 807 KAR 5:011, Sections 2(4), 8(4)(e) , and 12. 6. If at any point while the deviation granted through this Order is in effect OCWD loses authorization to negotiate settlements, implement partial settlements, or resolve disputes, OWS shall provide written notice to the Commission's Executive Director within seven days of the designated representative's loss of an authorization described above.
|
2017-00393
|
1/11/2018
|
PSC_ORDER
Order Entered: 1. Estill District; and commissioners Greg Wright, chairman; William Beard, treasurer; and Jerry Arnold, secretary; individually and in their respective capacities as commissioners of Estill District, shall submit to the Commission individual written responses to the allegations contained herein within 20 days of the date of entry of this Order. 2. Estill District; and commissioners Greg Wright, chairman; William Beard, treasurer; and Jerry Arnold, secretary; individually and in their respective capacities as commissioners of Estill District, shall appear on February 27, 2018, at 9:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard in Frankfort, Kentucky, to show cause, if any, why they should not be subject to penalties pursuant to KRS 278.990 for failure to comply with the requirements of KRS 278.300. 3. Estill District shall file with the Commission, no later than February 20, 2018, seven days prior to the hearing, a list of witnesses and exhibits to be presented at the February 27, 2018 hearing. Estill District shall provide six copies of any exhibit it intends to introduce into evidence at the hearing. 4. Estill District shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: ''This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov.
|
2017-00467
|
1/11/2018
|
20180111_PSC_ORDER.pdf
|
2017-00468
|
1/11/2018
|
PSC_ORDER
Order Entered: 1. Jonathan Creek; and commissioners: Jimmy Tubbs, chairman; Barry Hill, vice chairman; Josh Medley, treasurer; Mark Holt, board member; and Kara Wilson, board member; individually and in their respective capacities as commissioners of Jonathan Creek, shall submit to the Commission individual written responses to the allegations contained herein within 20 days of the date of entry of this Order.
2. Jonathan Creek; and commissioners Jimmy Tubbs, chairman; Barry Hill, vice chairman; Josh Medley, treasurer; Mark Holt, board member; and Kara Wilson, board member; individually and in their respective capacities as commissioners of Jonathan Creek, shall appear at a hearing scheduled for February 27, 2018, at 9:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard in Frankfort, Kentucky, to show cause why they should not be subject to penalties prescribed in KRS 278.990 for the alleged violation of KRS 278.300. 3. Jonathan Creek shall file with the Commission, no later than February 20, 2018, seven days prior to the hearing, a list of witnesses and exhibits to be presented at the February 27, 2018 hearing. Jonathan Creek shall provide six copies of any exhibit it intends to introduce into evidence at the hearing. 4. Jonathan Creek shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b).
|
2017-00469
|
1/11/2018
|
20180111_PSC_ORDER.pdf
|
2017-00328
|
1/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order are approved for final meter readings on and after January 24, 2018. 2. Within 20 days of the date of entry of this Order, Delta shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2017-00474
|
1/12/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.32 per 1 ,000 gallons is approved. 2. The rates as set forth in Appendix B to this Order are approved for water service rendered by South 641 on and after January 1, 2018. 3. Within 20 days of the date of the entry of this Order, South 641 shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2017-00475
|
1/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Navitas and set forth in the Appendix to this Order is approved for service rendered by Navitas on and after February 1, 2018. 2. Within 20 days of the date of entry of this Order, Navitas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this
Order.
|
2017-00479
|
1/12/2018
|
20180112_PSC_ORDER.pdf
|
2017-00070
|
1/12/2018
|
20180112_PSC_ORDER.pdf
|
2017-00463
|
1/12/2018
|
20180112_PSC_ORDER.pdf
|
2017-00457
|
1/12/2018
|
20180112_PSC_ORDER.pdf
|
2017-00477
|
1/12/2018
|
20180112_PSC_ORDER.pdf
|
2018-00005
|
1/16/2018
|
20180116_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
1/16/2018
|
20180116_DATA_REQUEST01.pdf
Data Request
|
2017-00321
|
1/16/2018
|
20180116_DATA_REQUEST02.pdf
Data Request
|
2017-00321
|
1/17/2018
|
20180117_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
1/18/2018
|
20180118_DATA_REQUEST.pdf
Data Request
|
2017-00343
|
1/18/2018
|
20180118_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2017-00477
|
1/18/2018
|
20180118_PSC_ORDER.pdf
|
2017-00097
|
1/18/2018
|
20180118_PSC_ORDER.pdf
|
2017-00179
|
1/19/2018
|
PSC_ORDER
Order Entered nunc pro tunc: 1. Farmers RECC shall refund a total amount of $18,185 to its customers through its monthly pass-through mechanism by decreasing its environmental surcharge revenue requirement by $3,031 in each of the first 6 months following the Commission's
order issued January 5, 2018. 2. All other provisions of the Commission's January 5, 2018 Order not in conflict with this Order shall remain in full force and effect.
|
2017-00326
|
1/19/2018
|
PSC_ORDER
Final Order Entered: The Complaint filed with this Commission on November 3, 2017 is dismissed without prejudice and shall be removed from the Commission's docket.
|
2017-00431
|
1/19/2018
|
PSC_ORDER
Final Order Entered: 1. West Laurel is granted a CPCN for the proposed project as submitted. 2. West Laurel's proposed plan of financing is approved. 3. West Laurel is authorized to enter into a loan not to exceed $1,260,000 with AD, maturing over a 40-year period, at an interest rate equal to the lower of the rate in effect at the time of loan approval, or the interest rate in effect at the time of closing, but not to exceed 2.75 percent per annum. 4. The proceeds from the loan shall be used only for the purposes specified in West Laurel's application. 5. West Laurel shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, West Laurel may use such surplus to
construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in West Laurel's rates for service. West Laurel shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4. 7. West Laurel shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs, (e.g.,
engineering, legal, and administrative) within 60 days of the date that construction is substantially completed.
|
2017-00473
|
1/19/2018
|
PSC_ORDER
Final Order Entered: 1 . The rates set forth in the Appendix to this Order are approved for final meter readings on and after February 1, 2018.
2. Within 20 days of the date of entry of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2017-00478
|
1/19/2018
|
20180119_PSC_ORDER.pdf
|
2018-00003
|
1/19/2018
|
20180119_PSC_ORDER.pdf
|
2017-00383
|
1/19/2018
|
20180119_DATA_REQUEST.pdf
Data Request
|
2017-00328
|
1/22/2018
|
PSC_ORDER
Final Order Entered: 1. GQWD's motion for extension of time is granted and its Answer to Commission Staff's First Request for Information is accepted for filing as of September 29, 2017. 2. GQWD's Application requesting an alternative inspection schedule for its grinder/pump stations pursuant to 807 KAR 5:071, Section 7(4) is approved. 3. Simplex grinder/pump stations shall be inspected annually.
|
2017-00201
|
1/22/2018
|
PSC_ORDER
Final Order Entered: 1. Mr. Spainhoward's Complaint is dismissed. 2. This case is closed and removed from the Commission's docket.
|
2017-00273
|
1/22/2018
|
PSC_ORDER
Order Entered: 1. The motion for deviation from 807 KAR 5:001 Section 12(1)(b) is granted. 2. Frontier shall file the requested information within
10 days of the date of entry of this Order. 3. The filing is rejected.
|
2018-00010
|
1/22/2018
|
20180122_PSC_ORDER.pdf
Order Entered: 1. Martin County, including its Chair and Treasurer of its Board of Commissioners, and accountant, shall appear at a formal hearing scheduled for January 26, 2018 at 9:30 a.m., Eastern Standard Time, in Hearing Room 1 of the Commission's off
|
2018-00017
|
1/22/2018
|
20180122_PSC_ORDER.pdf
|
2017-00458
|
1/22/2018
|
20180122_PSC_ORDER.pdf
|
2017-00459
|
1/22/2018
|
20180122_PSC_ORDER.pdf
|
2017-00179
|
1/23/2018
|
20180123_PSC_ORDER.pdf
|
2017-00441
|
1/23/2018
|
20180123_PSC_ORDER01.pdf
|
2017-00441
|
1/23/2018
|
20180123_PSC_ORDER02.pdf
|
2017-00441
|
1/23/2018
|
20180123_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2017-00446
|
1/23/2018
|
20180123_PSC_ORDER.pdf
|
2018-00029
|
1/23/2018
|
20180123_DATA_REQUEST.pdf
Data Request
|
2017-00441
|
1/24/2018
|
20180124_PSC_ORDER.pdf
|
2017-00266
|
1/24/2018
|
20180124_PSC_ORDER.pdf
|
2017-00267
|
1/25/2018
|
20180125_DATA_REQUEST.pdf
Commission Staff's First Information Request to Columbia Gas of Kentucky, Inc.
|
2017-00453
|
1/25/2018
|
20180125_PSC_ORDER.pdf
|
2017-00179
|
1/25/2018
|
20180125_PSC_ORDER.pdf
|
2017-00477
|
1/25/2018
|
20180125_PSC_ORDER.pdf
|
2018-00034
|
1/25/2018
|
20180125_PSC_ORDER.pdf
|
2018-00035
|
1/25/2018
|
20180125_PSC_ORDER.pdf
|
2018-00036
|
1/26/2018
|
PSC_ORDER
Order Entered: 1. The AG's motion to intervene is granted. 2. The AG shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The AG shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. The AG shall adhere to the procedural schedule set forth in the Commission's December 14, 2017 Order and as amended by any subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the AG shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and
b. Set forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2017-00376
|
1/26/2018
|
20180126_PSC_ORDER.pdf
|
2018-00005
|
1/29/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Bright's Propane are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered on and after February 1, 2018. 3. A limited deviation from the AGC formula contained in Bright's Propane's tariff is granted for this case. 4. Within 20 days of the date of entry of this Order, Bright's Propane shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2018-00006
|
1/29/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is initiated to determine whether a vacancy existed on the North Marshall Water District's Board of Commissioners for more than 90 days in 2017. 2. Marshall County Water District is made a party to this proceeding. 3. Any party filing documents with the Commission shall serve a copy of those documents upon all other parties. 4. a. The information requested in Appendix B to this Order is due within 14 days of entry of this Order. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and five copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or the
person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it
obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00011
|
1/29/2018
|
20180129_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2017-00316
|
1/30/2018
|
PSC_ORDER
Final Order Entered: 1 . The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates originally proposed by West McCracken are denied. 3. West McCracken's request for three annual rate increases, based on Staff's finding that West McCracken could justify a $175,272 increase in revenues from water sales for an overall revenue of $802,775, is granted. 4. The Phase 1 rates set forth in the Appendix to this Order are approved for services rendered by West McCracken on and after the date of this Order. 5. The Phase 2 rates set forth in the Appendix to this Order are approved for service rendered by West McCracken effective the day after the first anniversary of the date of this Order. 6. The Phase 3 rates set forth in the Appendix to this Order are approved for service rendered by West McCracken effective the day after the second anniversary of the date of this Order. 7. One week prior to the effective date of the Phase 2 and Phase 3 rates, West McCracken shall publish notice following the requirements of 807 KAR 5:076, Section 5. The customer notice shall be in the format as set forth in the Appendix attached to the December 8, 2017 Order, and shall contain only the rate comparison being implemented for that rate phase. 8. Within 45 days of publishing the notice required in ordering paragraph number 7, West McCracken shall file proof of notice as required pursuant to 807 KAR 5:076, Section 5(3).
|
2017-00319
|
1/30/2018
|
PSC_ORDER
Order Entered: 1. Within 14 days from the date of entry of this Order, Symsonia shall publish a one-time notice following the requirements of 807 KAR 5:076, Section 5. The customer notice shall be formatted as set forth in the Appendix to this Order. 2. Symsonia shall provide proof of publication of the notice to the Commission no later than February 22, 2018. 3. Any motion to intervene based on Symsonia's acceptance of the revenue requirement proposed in the Staff Report shall be filed no later than February 22, 2018.
|
2017-00371
|
1/30/2018
|
PSC_ORDER
Order Entered: 1. A hearing in this matter shall be held on March 27, 2018, at 9:00 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Big Sandy Rural Electric Cooperative Corporation ("Big Sandy") shall give
notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is requested, Big Sandy shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing. 4. Big Sandy's motion to schedule a public hearing, filed on January 22, 2018, is denied as moot.
|
2017-00374
|
1/30/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2017-00403
|
1/30/2018
|
PSC_IC_NOTICE01
Commission Staff's Corrected Notice of Informal Conference
|
2017-00403
|
1/30/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 270 feet in height, with attached antennas, and to be located at Long Mill Road, Pembroke, KY 42266. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00001
|
1/30/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings by Frontier on and after February 1, 2018. 3. Within 20 days of the date of entry of this Order, Frontier shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00013
|
1/30/2018
|
PSC_ORDER
Final Order Entered: 1 . KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Dixon, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00026
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00044
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00005
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2017-00481
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00039
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00040
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00041
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00042
|
1/30/2018
|
20180130_PSC_ORDER.pdf
|
2018-00043
|
1/31/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2017-00143
|
1/31/2018
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of service of this Order, Mr. Kemper shall file a more detailed and definitive pleading citing to any statutes, regulations, or tariff provisions he believes are being violated, and any specific relief he is requesting. 2. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that personal
information cannot be read. 3. Documents of any kind filed with the Commission in the course of this proceeding shall also be served on all parties of record.
|
2017-00450
|
1/31/2018
|
20180131_DATA_REQUEST.pdf
Commission Staff's Post Hearing Request for Information to Martin County Water District
|
2018-00017
|
1/31/2018
|
DATA_REQUEST
Commission Staff's Initial Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00027
|
1/31/2018
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Millersburg, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall , within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00037
|
1/31/2018
|
20180131_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
1/31/2018
|
20180131_DATA_REQUEST01.pdf
Data Request
|
2017-00349
|
1/31/2018
|
20180131_PSC_ORDER.pdf
|
2017-00307
|
2/1/2018
|
PSC_ORDER
Final Order Entered: 1. Fern Lake has satisfied the Commission's May 4, 2017 Order; 2. This case is dismissed with prejudice and removed from the Commission's active docket; and 3. This is a final and appealable order.
|
2017-00031
|
2/1/2018
|
PSC_ORDER
Final Order Entered: 1. Red Barn has satisfied the Commission's May 11 , 2017 Order; 2. The penalties assessed against Red Barn in the Commission's May 11, 2017 Order are hereby waived; 3. This case is dismissed with prejudice and removed from the Commission's active docket; and 4. This is a final and appealable order.
|
2017-00033
|
2/1/2018
|
PSC_ORDER
Order Entered: 1. Within 14 days from the date of entry of this Order, Herrington Haven shall publish a one-time notice following the requirements of 807 KAR 5:076, Section 5(4). The customer notice shall be formatted as set forth in the Appendix to this Order. 2. Within 30 days from the date of entry of this Order, Herrington Haven shall provide an affidavit from an authorized representative of the utility verifying the contents of the notice, that notice was mailed to all customers, and the date of the mailing. 3. Any motion to intervene based on Herrington Haven's acceptance of the
revenue requirement proposed in the Staff Report shall be filed no later than 30 days from the issuance of the notice.
|
2017-00311
|
2/1/2018
|
20180201_DATA_REQUEST.pdf
Data Request
|
2018-00034
|
2/1/2018
|
20180201_PSC_ORDER.pdf
|
2017-00246
|
2/1/2018
|
20180201_PSC_ORDER.pdf
|
2016-00427
|
2/2/2018
|
PSC_ORDER
Final Order Entered: 1. The charges and credits billed by Big Rivers through its FAC for the period November 1, 2016, through April 30, 2017, are approved. 2. KIUC's request that Big Rivers refund fuel costs is denied. 3. Big River shall propose a change in its fuel cost allocation methodology to a least-cost stacking method, in the earlier of its next base rate case or its next two-year FAC review, which is anticipated to be opened in January 2019.
|
2017-00287
|
2/2/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Jackson Purchase through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00304
|
2/2/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Kenergy through the FAC for the period November 1, 2016, through April 30, 2017, are
approved.
|
2017-00305
|
2/2/2018
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Meade County through the FAC for the period November 1, 2016, through April 30, 2017, are approved.
|
2017-00306
|
2/2/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to East Kentucky Power Cooperative, Inc.
|
2017-00376
|
2/2/2018
|
PSC_ORDER
Order Entered: The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with the original and six copies in paper medium and an electronic version to the Commission.
b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2017-00416
|
2/2/2018
|
20180202_PSC_ORDER.pdf
Order Entered: 1. The motion to intervene is granted. 2. MCCC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted
|
2018-00017
|
2/2/2018
|
20180202_PSC_ORDER.pdf
|
2018-00036
|
2/5/2018
|
20180205_PSC_ORDER.pdf
|
2017-00349
|
2/5/2018
|
20180205_PSC_ORDER.pdf
|
2018-00039
|
2/7/2018
|
PSC_ORDER
Final Order Entered: this case is dismissed without prejudice and is removed from the Commission's docket.
|
2017-00365
|
2/7/2018
|
20180207_PSC_ORDER.pdf
|
2015-00283
|
2/8/2018
|
PSC_ORDER
Order Entered nunc pro tunc that: 1. The January 12, 2018 Order is corrected to include the Bulk Rate to Appendix B, as attached to this Order.
2. All other provisions of the January 12, 2018 Order shall remain in full force and effect.
|
2017-00475
|
2/8/2018
|
20180208_STAFF_REPORT.pdf
Staff Report
|
2017-00338
|
2/8/2018
|
20180208_PSC_ORDER.pdf
|
2017-00070
|
2/8/2018
|
20180208_PSC_ORDER.pdf
|
2017-00383
|
2/8/2018
|
20180208_PSC_ORDER.pdf
|
2018-00051
|
2/8/2018
|
20180208_PSC_ORDER.pdf
|
2018-00052
|
2/12/2018
|
20180212_PSC_ORDER.pdf
|
2017-00173
|
2/12/2018
|
20180212_PSC_ORDER.pdf
|
2018-00005
|
2/14/2018
|
PSC_ORDER
Final Order Entered: 1. This matter is dismissed. 2. This case is closed and removed from the Commission's docket.
|
2017-00379
|
2/14/2018
|
PSC_ORDER
Order Entered: 1. Duke Kentucky should take all reasonable steps to suspend additional expenditures on its DSM programs, except for the Low Income Services and Neighborhood Programs, until the Commission is able to determine that ratepayer benefits exceed ratepayer costs.
2. Case Nos. 2017-00324 and 2018-00009 are consolidated into Case No. 2017-00427, and all future documents related to any of these cases shall be filed in the record of Case No. 2017-00427. 3. The records of Case Nos. 2017-00324 and 2018-00009 are incorporated by reference into Case No. 2017-00427. 4. The Commission Order entered on December 11, 2017, in Case No. 2017-00427 is amended to the limited extent that the Duke Kentucky's proposed residential DSM rates shall become effective subject to future change on and after the date of this Order. 5. All other provisions of the Commission Order entered on December 11, 2017, in Case No. 2017-00427 shall remain in full force and effect. 6. Within 20 days of the date of entry of this order, Duke Kentucky shall file its responses to the requests for information set forth in the Appendix to this Order. 7. An informal conference shall be schedule to discuss future procedural events subsequent to Duke Kentucky's filing of its responses to the requests for information set forth in the Appendix to this Order. 8. Case Nos. 2017-00324 and 2018-00009 are closed and removed from the
Commission's docket.
|
2018-00009
|
2/14/2018
|
20180214_PSC_ORDER.pdf
|
2018-00005
|
2/14/2018
|
20180214_PSC_ORDER01.pdf
|
2018-00005
|
2/14/2018
|
20180214_PSC_ORDER02.pdf
|
2018-00005
|
2/14/2018
|
20180214_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
2/14/2018
|
20180214_PSC_ORDER.pdf
|
2017-00441
|
2/14/2018
|
20180214_PSC_ORDER.pdf
|
2017-00427
|
2/14/2018
|
20180214_PSC_ORDER.pdf
|
2017-00324
|
2/15/2018
|
DATA_REQUEST
Commission Staff's Fourth Request for Information to Big Sandy Rural Electric Cooperative Corporation
|
2017-00374
|
2/15/2018
|
20180215_PSC_ORDER.pdf
|
2017-00321
|
2/16/2018
|
20180216_DATA_REQUEST.pdf
Data Request
|
2017-00343
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00018
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00019
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00020
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00021
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00022
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00023
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00024
|
2/16/2018
|
20180216_PSC_ORDER.pdf
|
2018-00025
|
2/19/2018
|
PSC_ORDER
Order Entered: Duke Kentucky Inc. is to satisfy or file a written answer on or before February 22, 2018, to the allegation that it overcharged Ms. Rule for gas service between March 21 , 2017, and May 19, 2017.
|
2017-00403
|
2/19/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Wireless ETCs to intervene is granted. 2. The Wireless ETCs shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Wireless ETC's shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Wireless ETCs shall adhere to the procedural schedule set forth in the Commission's February 2, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, the Wireless ETC's shall provide
the electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Wireless ETC's in accordance with 807 KAR 5:001, Section 4(8).
|
2017-00416
|
2/19/2018
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2017-00420
|
2/19/2018
|
20180219_PSC_ORDER.pdf
|
2017-00468
|
2/19/2018
|
PSC_ORDER
Final Order Entered: 1. Logan Telephone is granted a CPCN to construct new facilities as set forth in its Application and as described in this order. 2. Logan Telephone's request for deviation from 807 KAR 5:001, Section 15(2)(e), is granted. 3. Should the costs of the construction authorized herein exceed by more than 10 percent the estimated costs contained in the Application, Logan Telephone shall immediately notify the Commission in writing of the adjustment and include an explanation of the additional costs for the Commission's approval. 4. As provided for in this Order, Logan Telephone shall maintain records that clearly and sufficiently document the proper allocation of costs for jurisdictional and non-jurisdictional services provided as a result of this construction project. 5. Any documents filed pursuant to ordering paragraph 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2017-00476
|
2/19/2018
|
20180219_PSC_ORDER.pdf
Order Entered: 1. Martin District, including its Chair and Treasurer of its Board of Commissioners, and Martin District's accountant, shall appear at a formal hearing scheduled for February 28, 2018, at 1 :00 p.m., Eastern Standard Time, in Hearing Room 1
|
2018-00017
|
2/19/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Crittenden-Livingston County Water District
|
2018-00047
|
2/19/2018
|
20180219_PSC_ORDER.pdf
Order Entered: 1. South Kentucky's request to deviate from the filing requirements in 807 KAR 5:001 , Section 18(1 )(c)-(g) and (2)(c) is granted, and the Application is deemed filed as of the date of this Order. 2. South Kentucky's Application for approval of the Agreement with Morgan
Stanley Capital is continued beyond the 60-day period specified in KRS 278.300(2). 3. The procedural schedule set forth in the Appendix to this Order shall be followed. 4. Any document filed with the Commission shall be served on all parties of record, with the original and ten copies in paper medium to the Commission. 5. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with the original and ten copies in paper medium to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the
|
2018-00050
|
2/19/2018
|
PSC_ORDER
Order Entered: 1. Copies of the electric bills issued to Mr. De Moisey by KU that Mr. De Moisey alleges reflect an inaccurate meter reading.
2. The amount that Mr. De Moisey alleges he has been overcharged by KU , broken out by date and amount of alleged overcharges. 3. Clarification of Mr. De Moisey's allegation that the meter is defective, explaining how the meter is defective. 4. Copies of all correspondence between KU and Mr. De Moisey regarding this matter. If correspondence is not available, then Mr. De Moisey shall provide estimated dates for his correspondence with KU.
|
2018-00054
|
2/19/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is initiated, pursuant to KRS 74.361, to determine whether merger between Cawood District and Black Mountain Utility District is feasible. 2. Cawood District is made a party to this proceeding. 3. Black Mountain Utility District is made a party to this proceeding. 4. Any party filing documents with the Commission shall serve a copy of those documents upon all other parties. 5. a. Cawood District shall file the information requested in Appendix B to this Order within 14 days of the entry of this Order. Responses to requests for
information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or the person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00068
|
2/19/2018
|
20180219_PSC_ORDER.pdf
|
2018-00064
|
2/19/2018
|
20180219_PSC_ORDER.pdf
|
2017-00483
|
2/20/2018
|
PSC_ORDER
Order Entered: 1. Ordering paragraph 2 of the Commission's February 14, 2018 Order is amended to read: The water purchase contract between Grayson District and the City of Caneyville is approved and shall be effective upon the date of entry of this Order. 2. Ordering paragraph 3 shall be added to the Commission's February 14, 2018 Order and shall read: This case is closed and removed from the Commission's docket. 3. All other provisions of the Commission's February 14, 2018 Order not in conflict with this Order shall remain in full force and effect.
|
2017-00379
|
2/20/2018
|
PSC_ORDER
Order Entered: 1. Estill District's Motion to Dispense with Evidentiary Hearing and Submit Case for Decision is denied. 2. Estill District's Motion to Dismiss Commissioners as Parties to Proceeding is denied.
|
2017-00467
|
2/20/2018
|
PSC_ORDER
Order Entered: 1. Jonathan Creek's and the Commissioners' request to dismiss the proceeding with prejudice and to cancel the February 27, 2018 hearing is denied. 2. Jonathan Creek's and the Commissioners' joint motion for a telephonic conference is denied. 3. Commissioners Josh Medley's and Kara Wilson's joint motion to be dismissed from the proceeding is granted, and they are excused from the February 27, 2018, hearing. 4. Jonathan Creek and Commissioners Jimmy Tubbs, Barry Hill, and Mark Holt shall attend the February 27, 2018 hearing. 5. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2017-00469
|
2/20/2018
|
20180220_PSC_ORDER.pdf
Order Entered: 1. This proceeding is established to review the reasonableness of Martin District's proposed rates. 2. No later than May 1, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report ("Staff R
|
2018-00017
|
2/20/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Columbia and set forth in the Appendix to this Order are approved for billing beginning on March 1, 2018. 2. Within 20 days of the date of entry of this Order, Columbia shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00049
|
2/20/2018
|
20180220_PSC_ORDER.pdf
Order Entered: 1. Paragraph 6 of the February 19, 2018 Order is corrected to state: "Any motion to intervene filed after February 23, 2018, shall show a basis for intervention and good cause for being untimely, and must state with specificity the person's special interest that is not otherwise adequately represented, or the issues and facts the person will present that will assist the Commission in fully considering the matter. If the
untimely motion is granted, the movant shall accept and abide by the existing procedural schedule." 2. All other provisions of the February 19, 2018 Order shall remain in full force and effect.
|
2018-00050
|
2/20/2018
|
20180220_PSC_ORDER.pdf
|
2018-00046
|
2/20/2018
|
20180220_DATA_REQUEST.pdf
Data Request
|
2018-00034
|
2/21/2018
|
PSC_ORDER
Order Entered: 1. Within 20 days of the date of entry of this Order, any person who wishes to nominate a candidate to fill the vacancies on the North Marshall Water District Board of Commissioners shall submit to the Commission in writing the candidate's name, address, and telephone number. 2. Any party filing documents with the Commission shall serve a copy of these documents upon all other parties. 3. Service of any document or pleading shall be made in accordance with 807 KAR 5:001, Section 4(8). 4. The Executive Director shall serve a copy of this Order upon the Marshall County Judge/Executive, the members of the Marshall County Fiscal Court, the Marshall County Attorney, and the North Marshall District's Board of Commissioners.
|
2018-00011
|
2/21/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $(0.02) per 1,000 gallons is approved. 2. The rates proposed by Union County are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Union County on and after January 1, 2018. 4. Within 20 days of the date of entry of this Order, Union County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00045
|
2/21/2018
|
20180221_PSC_ORDER.pdf
|
2017-00427
|
2/21/2018
|
20180221_DATA_REQUEST.pdf
Data Request
|
2017-00441
|
2/22/2018
|
PSC_ORDER
Order Entered Nunc Pro Tunc: 1. The Appendix to the January 30, 2018 Order is replaced with the Appendix attached to this Order. 2. All other provisions of the Commission's January 30, 2018 Order not in conflict with this Order shall remain in full force and effect.
|
2017-00371
|
2/22/2018
|
20180222_PSC_ORDER.pdf
Order Entered: 1. The motion of Cumberland Valley to intervene is granted. 2. Cumberland Valley shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Cumberland Valley shall comply with all provisions of the Commission's regulations, 807 KAR 5:001 , Section 7, related to the service and filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Cumberland Valley shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive
electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00050
|
2/22/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed.
2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising
the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge. information, and belief formed after a reasonable inquiry.
|
2018-00056
|
2/22/2018
|
20180222_PSC_ORDER.pdf
|
2017-00410
|
2/22/2018
|
20180222_PSC_ORDER.pdf
|
2017-00415
|
2/22/2018
|
20180222_PSC_ORDER.pdf
|
2017-00327
|
2/23/2018
|
20180223_PSC_ORDER.pdf
Order Entered: 1. MCCC's motion to take the deposition of Joe Hammond is denied. 2. MCCC's motion to incorporate the record of Case No. 2018-00017 into the record of this proceeding is denied.
|
2016-00142
|
2/23/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. AT&T Mobility shall file a copy of the final decision regarding the pending FAA application for the proposed construction within ten days of receiving a decision. 4. AT&T Mobility shall file a copy of the final decision regarding the KAZC
application for the proposed construction within ten days of receiving a decision. 5. Documents filed, if any, in the future pursuant to ordering paragraphs 2, 3, and 4 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00015
|
2/23/2018
|
PSC_ORDER
Final Order Entered: 1. Atmos is granted a CPCN that authorizes it to bid on a franchise offered by the city of Madisonville, Kentucky, for the transmission and distribution of natural gas. 2. If Atmos is not the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Atmos was not the successful bidder. 3. If Atmos is the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Atmos is the successful bidder, Atmos shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2018-00055
|
2/23/2018
|
20180223_PSC_ORDER.pdf
|
2017-00328
|
2/26/2018
|
20180226_DATA_REQUEST.pdf
Commission Staff's First Request for Information to South Kentucky Rural Electric Cooperative Corporation
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER01.pdf
Order Entered: 1. The motion of Jackson Energy to intervene is granted. 2. Jackson Energy shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Jackson Energy shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Jackson Energy shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Jackson Energy shall provide its
electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Jackson Energy in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER02.pdf
Order Entered: 1. The motion of Salt River to intervene is granted. 2. Salt River shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Salt River shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Salt River shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Salt River shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Salt River in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER03.pdf
Order Entered: 1. The motion of Taylor RECC to intervene is granted. 2. Taylor RECC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Taylor RECC shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Taylor RECC shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Taylor RECC shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Taylor RECC in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER04.pdf
Order Entered: 1. The motion of Grayson to intervene is granted. 2. Grayson shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Grayson shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Grayson shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Grayson shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Grayson in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER05.pdf
Order Entered: 1. The motion of Shelby Energy to intervene is granted. 2. Shelby Energy shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Shelby Energy shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Shelby Energy shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Shelby Energy shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Shelby Energy in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER06.pdf
Order Entered: 1. The motion of EKPC to intervene is granted. 2. EKPC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. EKPC shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. EKPC shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, EKPC shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon EKPC in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER07.pdf
Order Entered: 1. The motion of the Companies to intervene is granted. 2. The Companies shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Companies shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4 The Companies shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, the Companies shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Companies in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER.pdf
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00050
|
2/26/2018
|
20180226_PSC_ORDER.pdf
|
2018-00043
|
2/26/2018
|
20180226_PSC_ORDER.pdf
|
2018-00042
|
2/26/2018
|
20180226_PSC_ORDER.pdf
|
2018-00041
|
2/26/2018
|
20180226_PSC_ORDER.pdf
|
2018-00040
|
2/27/2018
|
PSC_ORDER
Final Order Entered: 1. The amounts billed by Big Rivers through its environmental surcharge for the periods August 1, 2016, through January 31, 2017, and August 1, 2015, through July 31, 2017, are approved. 2. The amounts billed by Jackson Purchase and Kenergy through their
respective environmental surcharge pass-through mechanisms for the periods August 1, 2016, through January 31 ,2017, and August 1, 2015, through July 31 , 201 7, for all customers with dedicated delivery points are approved. 3. The amounts billed by the three Member Cooperatives through their respective environmental surcharge pass-through mechanisms for the periods September 1, 2016, through February 28, 2017, and September 1, 2015, through August 31, 2017, for all other non-dedicated delivery point customers are approved. 4. The rates of return determined by Big Rivers for each month of the review periods are approved.
|
2017-00345
|
2/27/2018
|
20180227_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry.
|
2017-00472
|
2/27/2018
|
PSC_ORDER
Order Entered: 1. No later than May 25, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report ("Staff Report'') containing its findings and recommendations regarding Green-Taylor's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Green-Taylor's financial condition supports a higher rate than Green-Taylor proposes or the assessment of an additional rate or charge not proposed in Green-Taylor's Application, Green-Taylor in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge.
4. If Commission Staff finds that changes should be made to the manner in which Green-Taylor accounts for the depreciation of Green-Taylor's assets, Green-Taylor in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Green-Taylor to implement the proposed change for accounting purposes.
|
2018-00030
|
2/27/2018
|
20180227_PSC_ORDER.pdf
|
2018-00050
|
2/27/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.18 per 1,000 gallons is approved. 2. The rates as set forth in Appendix B to this Order are approved for water service rendered by Bullock Pen on and after March 1, 2018. 3. Within 20 days of the date of the entry of this Order, Bullock Pen shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00061
|
2/27/2018
|
20180227_PSC_ORDER.pdf
|
2017-00179
|
2/27/2018
|
20180227_PSC_ORDER01.pdf
|
2017-00179
|
2/27/2018
|
20180227_PSC_ORDER.pdf
|
2017-00458
|
2/27/2018
|
20180227_PSC_ORDER.pdf
|
2017-00459
|
2/28/2018
|
PSC_ORDER
Order Entered: Ms. Rule shall file a response to Duke Kentucky's motion to dismiss within 14 days from the date of the entry of this Order. The information should be sent to the Kentucky Public Service Commission, P.O. Box 615, 211 Sower Boulevard, Frankfort, Kentucky 40602-0615, with a reference to Case No. 2017-00403. Mailed documents should be sent with sufficient time to be received by the Commission on or before the due date.
|
2017-00403
|
2/28/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.90 per 1,000 gallons is approved. 2. North Manchester's proposed rates filed with its response to the filing deficiencies are approved. 3. The rates as set forth in Appendix B to this Order are approved for water
service rendered by North Manchester on and after January 1, 2018. 4. Within 20 days of the date of entry of this Order, North Manchester shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2017-00466
|
2/28/2018
|
PSC_ORDER
Order Entered: The February 27, 2018 hearing in this matter is indefinitely suspended.
|
2017-00467
|
2/28/2018
|
PSC_ORDER01
Final Order Entered: 1. The Offer is adopted and approved in its entirety as a complete resolution of all issues in this case. 2. Estill District Commissioners Wright, Beard, and Arnold will resign as members of Estill District's Board of Commissioners within 90 days of the entry of this
Order. 3. Commissioners Wright, Beard, and Arnold agree that they shall not accept any future appointment to the Estill District's Board of Commissioners. 4. The Commission will not assess any penalty or fine against Estill District for the alleged violations of KRS 278.300.
5. The Commission will not assess any penalty or fine against Commissioners Wright, Beard, and Arnold for violations of KRS 278.300.
6. Upon receiving notice in the record of the resignation of Commissioners Wright, Beard, and Arnold, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2017-00467
|
2/28/2018
|
PSC_ORDER
Order Entered: 1.) Post hearing data requests shall be filed in the record on or before March 6, 2018. 2.) Responses to the post hearing data requests shall be filed on or before March 20, 2018. 3.) This case shall stand submitted for a decision on the merits as of March 21, 2018, at 12:01 a.m.
|
2017-00469
|
2/28/2018
|
PSC_ORDER
Final Order Entered: 1. Frontier is authorized to borrow $35,000 from Community Trust Bank. The loan maturity date and interest rate shall be in accordance with the terms as described in Frontier's application. 2. Frontier shall execute the loan documents as authorized herein. 3. Frontier shall comply with all matters set out in finding paragraphs 3 through 5 as if they were individually so ordered. 4. Any documents filed in the future pursuant to finding paragraph 3 shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00010
|
2/28/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Natural Energy and set forth in the Appendix to this Order is approved for service rendered by Natural Energy on and after April 1, 2018. 2. Within 20 days of the date of entry of this Order, Natural Energy shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved
pursuant to this Order.
|
2018-00071
|
2/28/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Bluegrass is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after April 1, 2018. 3. Within 20 days of the date of entry of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2018-00079
|
2/28/2018
|
20180228_PSC_ORDER.pdf
|
2017-00417
|
3/1/2018
|
DATA_REQUEST
Commission Staff's Post Hearing Request for Information to Jonathan Creek Water District
|
2017-00469
|
3/1/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.1100 per 1,000 gallons is approved. 2. The rates as set forth in Appendix B to this Order are approved for water service rendered by Beech Grove on and after April 1, 2018. 3. Within 20 days of the date of entry of this Order, Beech Grove shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00032
|
3/1/2018
|
20180301_PSC_ORDER.pdf
Order Entered: 1. The motion of Nucor to intervene is granted. 2. Nucor shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Nucor shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Nucor shall adhere to the procedural schedule set forth in the Commission's February 19, 2018 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Nucor shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Nucor in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00050
|
3/1/2018
|
20180301_PSC_ORDER.pdf
|
2018-00048
|
3/1/2018
|
20180301_PSC_ORDER.pdf
|
2018-00005
|
3/6/2018
|
20180306_DATA_REQUEST.pdf
Commission Staff's Post-Hearing Request for Information to Martin County Water District
|
2016-00142
|
3/6/2018
|
PSC_ORDER
Final Order Entered: Estill County's application for approval of refinancing is hereby denied without prejudice.
|
2018-00058
|
3/6/2018
|
PSC_ORDER
Final Order Entered: 1 . Atmos is granted a CPCN that authorizes it to bid on a franchise offered by the city of Hopkinsville, Kentucky, for the transmission and distribution of natural gas. 2. If Atmos is not the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Atmos was not the successful bidder. 3. If Atmos is the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Atmos is the successful bidder, Atmos shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2018-00074
|
3/6/2018
|
PSC_ORDER
Final Order Entered: 1. Kentucky Power is granted a CPCN that authorizes it to bid on a franchise offered by the city of South Shore, Kentucky, for electric transmission and distribution service. 2. If Kentucky Power is not the successful bidder, Kentucky Power shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Kentucky Power was not the successful bidder. 3. If Kentucky Power is the successful bidder, Kentucky Power shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the
executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Kentucky Power is the successful bidder, Kentucky Power shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00077
|
3/6/2018
|
20180306_PSC_ORDER.pdf
Order Entered: 1. The proposed PAP tariff is suspended for five months, from May 1, 2018, up to and including September 30, 2018.
2. Nothing contained in this Order shall prevent the Commission from entering further Orders in this matter.
|
2018-00086
|
3/6/2018
|
20180306_PSC_ORDER.pdf
|
2018-00005
|
3/6/2018
|
20180306_PSC_ORDER.pdf
|
2018-00057
|
3/7/2018
|
PSC_ORDER
Order Entered: 1. Estill District's February 27, 2018 Motion to Amend and Correct the Commission's Order of February 20, 2018 is granted.
2. Ordering paragraph 1 of the Commission's February 20, 2018 Order is amended to read: Estill District and Estill District's Commissioners' Motion to Dispense with Evidentiary Hearing and Submit Case for Decision is denied. 3. Ordering paragraph 2 of the Commission's February 20, 2018 Order is amended to read: Estill District's Commissioners' Motion to Dismiss Commissioners as Parties to Proceeding is denied. 4. All other provisions of the Commission's February 20, 2018 Order not in conflict with this Order shall remain in full force and effect.
|
2017-00467
|
3/7/2018
|
20180307_PSC_ORDER.pdf
|
2017-00468
|
3/7/2018
|
PSC_ORDER
Final Order Entered: 1. Windstream's petition regarding the Pooling Administrator's denial of its application for assignment of additional numbering resources is granted. 2. The decision of the Pooling Administrator denying Windstream 's request for the assignment of a new thousand-number block for the Uniontown rate centers in Kentucky is hereby overturned. 3. The Pooling Administrator shall assign Windstream a single thousand-number block for the Uniontown rate center. 4. The numbering resources considered in this Order are to be assigned for
the sole use of Windstream's customers. If the numbering resources requested by Windstream are no longer required to meet the service, the associated numbering resources approved in this Order shall be returned to the Pooling Administrator.
|
2018-00033
|
3/7/2018
|
20180307_PSC_ORDER.pdf
Order Entered: 1. South Kentucky's Motion is granted. 2. The procedural scheduled established in the Commission's February 19, 2018 Order is vacated. 3. All parties shall adhere to the procedural schedule established in the Appendix to this Order.
|
2018-00050
|
3/7/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00060
|
3/7/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. AT&T Mobility shall file a copy of the final decision regarding the pending KAZC and FAA applications for the proposed construction within ten days of receiving a decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00070
|
3/7/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after April 1, 2018. 2. Within 20 days of the date of entry of this Order, Millennium shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00081
|
3/7/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Western Lewis and set forth in the Appendix to this Order are approved for service rendered by Western Lewis on and after April 1, 2018. 2. Within 20 days of the date of entry of this Order, Western Lewis shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were
approved pursuant to this Order.
|
2018-00082
|
3/7/2018
|
20180307_DATA_REQUEST.pdf
Data Request
|
2017-00244
|
3/7/2018
|
20180307_PSC_ORDER.pdf
|
2016-00162
|
3/8/2018
|
PSC_ORDER
Final Order Entered: 1. Western Lewis's request to waive the requirement of obtaining prior approval from the Commission for a CPCN is denied.
2. By separate Order, the Commission will establish a proceeding to investigate whether Western Lewis or its Board of Commissioners should be assessed a penalty under KRS 278.990 for beginning construction of the headquarters building without obtaining a CPCN from the Commission. 3. This case is closed and removed from the Commission's docket.
|
2017-00141
|
3/8/2018
|
20180308_DATA_REQUEST.pdf
Commission Staff's Post Hearing Request for Information to Martin County Water District
|
2018-00017
|
3/8/2018
|
PSC_ORDER
Final Order Entered: 1. The accounting treatment requested by EKPC to classify depreciation and accretion expense related to the Smith Station landfill AROs as a regulatory asset is approved for 2017 and subsequent years. 2. The regulatory asset accounts established in this case are for accounting purposes only. 3. EKPC shall record a credit to expense and a debit to the regulatory asset accounts for $83,078 in the 2018 financial statements to bring the regulatory asset account balance to the amount requested for December 31 , 2017. 4. EKPC shall, within 14 days of the date of this Order, file with the Commission the accounting entries made on its books to effectuate the creation of the regulatory assets.
5. EKPC shall file annually updated ARO calculations reflecting any studies, reports, or change in other assumptions for the ARO balances as originally recorded herein. The annual update shall be based upon the balances of December 31 of each year and the updated calculations shall be submitted at the time EKPC files its annual report with the Commission. 6. Any document filed in the future pursuant to ordering paragraphs 4 and 5 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00027
|
3/8/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Crittenden-Livingston County Water District
|
2018-00047
|
3/8/2018
|
PSC_ORDER
Order Entered: 1. Cumberland Valley's motion for confidential treatment filed on February 1, 2018, is denied. 2. Cumberland Valley's motion to withdraw and replace documents and for confidential treatment, filed on February 23, 2018, is denied. 3. Within 20 days of the date of entry of this Order, Cumberland Valley shall file a revised version of the designated materials for which confidential protection was denied, reflecting as unredacted the information that has been denied confidential treatment. 4. The material for which Cumberland Valley's requests for confidential treatment has been denied shall neither be placed in the public record nor made available for inspection for 20 days from the date of entry of this Order in order to allow Cumberland Valley to seek a remedy afforded by law.
|
2018-00056
|
3/8/2018
|
20180308_PSC_ORDER.pdf
|
2017-00349
|
3/8/2018
|
20180308_PSC_ORDER.pdf
|
2017-00446
|
3/8/2018
|
20180308_DATA_REQUEST.pdf
Data Request
|
2017-00483
|
3/9/2018
|
PSC_ORDER
Final Order Entered: 1. This case is closed and removed from the Commission's docket. 2. Any under- or over-recoveries of gas costs that would have otherwise been reconciled in this case, shall be reconciled in Valley Gas's GCR application for rates effective April 1, 2018.
|
2017-00439
|
3/12/2018
|
20180312_PSC_ORDER.pdf
|
2017-00343
|
3/12/2018
|
20180312_PSC_ORDER01.pdf
|
2017-00343
|
3/12/2018
|
20180312_PSC_ORDER.pdf
|
2017-00349
|
3/13/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by B&H are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered on and after April 1, 2018, subject to further revision based upon the final outcome of the appeal of the Commission's Order in Case No. 2015-00367. 3. Within 20 days of the date of entry of this Order, B&H shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00073
|
3/13/2018
|
20180313_PSC_ORDER.pdf
|
2017-00179
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
3/13/2018
|
20180313_PSC_ORDER.pdf
|
2018-00035
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2018-00040
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2018-00042
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2018-00041
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2018-00043
|
3/13/2018
|
20180313_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
3/14/2018
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of entry of this Order, Kentucky-American shall file a response to the Complaint of Roger W. Parry.
2. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10) , encrypt or redact the paper so that personal information cannot be read. 3. Documents of any kind filed with the Commission in the course of this proceeding shall also be served on all parties of record.
|
2017-00452
|
3/14/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Cumberland Valley Electric, Inc.
|
2018-00056
|
3/14/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered by Citipower on and after April 1, 2018. 3. Citipower shall submit all invoices received from Citigas and Citizens Gas as part of all future GCR filings. 4. Within 20 days of the date of entry of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00087
|
3/14/2018
|
20180314_PSC_ORDER.pdf
|
2016-00317
|
3/14/2018
|
20180314_PSC_ORDER.pdf
|
2017-00321
|
3/15/2018
|
20180315_PSC_IC_NOTICE.pdf
Commission Staff's Notice of Telephonic Informal Conference
|
2018-00050
|
3/15/2018
|
PSC_ORDER
Order Entered: Cawood District's Supplemental Motion is granted, and the responses to the Requests for Information shall be filed with the
Commission on or before March 19, 2018.
|
2018-00068
|
3/15/2018
|
PSC_ORDER
Final Order Entered: 1. To satisfy his or her training obligations set forth in KRS 74.020(8), every newly appointed water district commissioner must complete, within the first 12 months following the water district commissioner's appointment, each and every core course described in the Appendix attached hereto, each of which will be offered at each of the Commission's seminars. 2. Returning water district commissioners may fulfill their six hours of annual training, pursuant to KRS 74.020(6) and (7), by completing six hours of courses offered at the Commission's seminars, whether core courses or electives, by taking courses offered by third parties and approved by the Commission, or through some combination thereof. 3. Third parties applying for approval of a proposed water district commissioner training program shall provide, in electronic or paper form, the documents and information described above and set forth in 807 KAR 5:070, Section 1, 30 days prior to the first date on which the course is scheduled to take place, except as otherwise stated herein. 4. Water district commissioners will not receive credit for courses that are not approved by the Commission.
|
2018-00085
|
3/16/2018
|
20180316_PSC_ORDER.pdf
Final Order Entered: 1. LG&E is assessed a civil penalty in the total amount of $395,000 for four violations of 49 C.F.R § 192.605(a) and 807 KAR 5:022, Section 13(2), one violation of 49 C.F.R § 192.241 and 807 KAR 5:022, Section 5(8), and seventy-four vi
|
2017-00119
|
3/16/2018
|
PSC_ORDER
Order Entered: North Mercer's deviation from the office hours requirements of 807 KAR 5:006 Section 14(1)(b)(1), is approved.
|
2017-00127
|
3/16/2018
|
PSC_ORDER
Final Order Entered: 1. Center Ridge is assessed a penalty of $2,500 for its willful failure to comply 2. Center Ridge shall pay the assessed penalty, totaling $2,500.00 within 30 days of the date of entry of this Order. Payment shall be by certified check or money order made payable to "Treasurer, Commonwealth of Kentucky" and shall be sent by certified mail or delivered to Office of General Counsel, Public Service Commission of Kentucky, 211 Sower Boulevard, P.O. Box 615 Frankfort, Kentucky 40602-0615. 3. The Executive Director shall serve a copy of this Order on Center Ridge by certified mail.
|
2017-00359
|
3/16/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 199 feet in height, with attached antennas, and to be located at 5095 Kentucky Highway 52, a.k.a St. Francis Highway, Loretto, Kentucky. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced , the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2017-00462
|
3/16/2018
|
20180316_PSC_ORDER.pdf
Order Entered: 1. Martin District is authorized to place into effect the interim base rate increase, subject to refund, and the surcharge set forth in the Appendix to this Order, for service rendered on and after the date of this Order. 2. Martin District
|
2018-00017
|
3/16/2018
|
PSC_ORDER
Final Order Entered: 1. Wood Creek is granted a CPCN for the proposed project as submitted. 2. Wood Creek's proposed plan of financing is approved. 3. Wood Creek is authorized to enter into a loan agreement in an amount not to exceed $896,000 with RD, maturing over a 40-year period, at an interest rate not to exceed the lower of 2.75 percent per annum and be equal to the lower of the rate in effect
at the time of loan approval, or the interest rate in effect at the time of closing. 4. The proceeds from the loan shall be used only for the purposes specified in Wood Creek's application. 5. Wood Creek shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Wood Creek may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Wood Creek's rates for service. Wood Creek shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4. 7. Wood Creek shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs, (e.g., engineering, legal, and administrative) within 60 days of the date that construction is substantially completed.
|
2018-00066
|
3/16/2018
|
PSC_ORDER
Final Order Entered: 1 . The rate proposed by Martin and set forth in the Appendix to this Order is approved for service rendered by Martin on and after April 1, 2018. 2. Within 20 days of the date of entry of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2018-00090
|
3/16/2018
|
20180316_PSC_ORDER.pdf
|
2017-00328
|
3/16/2018
|
20180316_PSC_ORDER.pdf
|
2018-00084
|
3/16/2018
|
20180316_PSC_ORDER.pdf
|
2017-00415
|
3/19/2018
|
20180319_PSC_ORDER.pdf
|
2018-00039
|
3/19/2018
|
20180319_PSC_ORDER.pdf
|
2017-00417
|
3/20/2018
|
20180320_PSC_ORDER.pdf
|
2017-00468
|
3/20/2018
|
20180320_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule established by the Commission's March 7, 2018 Order is vacated. 2. All parties shall adhere to the procedural schedule set forth in the Appendix to this Order.
|
2018-00050
|
3/20/2018
|
20180320_PSC_ORDER.pdf
|
2018-00048
|
3/20/2018
|
20180320_PSC_ORDER.pdf
|
2018-00034
|
3/21/2018
|
PSC_ORDER
Final Order Entered: 1. The Commission annually will conduct a formal review of the TRS fund to determine if a change in the surcharge is warranted. 2. This case is closed and removed from the Commission's docket.
|
2017-00358
|
3/21/2018
|
20180321_PSC_ORDER01.pdf
Order Entered: South Kentucky's Motion is granted.
|
2018-00050
|
3/21/2018
|
20180321_PSC_ORDER.pdf
Order Entered: Scott B. Grover, Dan H. McCrary, Steven M. Madison, and Jesse S. Unkenholz are admitted, pro hac vice, for the purpose of representing SKRECC in the above-styled proceeding, provided that Mr. May or another member of the Kentucky Bar Association acts as co-counsel and is present at all proceedings before this Commission.
|
2018-00050
|
3/21/2018
|
20180321_PSC_ORDER.pdf
|
2017-00338
|
3/22/2018
|
PSC_ORDER
Final Order Entered: Western Fleming County's request for deviation from the water storage requirements of 807 KAR 5:0066, Section 4(4) is
granted.
|
2016-00424
|
3/22/2018
|
PSC_ORDER
Order Entered: 1. Billy Driskill, Dean McCoy, Steve Mathis, Kenneth Shadowen, and Tim Watkins shall each file with the Commission, no later than April 9, 2018, the original and two copies of the information listed in Appendix A, with a copy to North Marshall Water District. A candidate's failure to file the requested information in a timely manner shall be considered as notice that the candidate does not wish to be considered for appointment to North Marshall Water District's Board of Commissioners. 2. North Marshall Water District shall file with the Commission no later than April 9, 2018, the original and two copies of the information listed in Appendix B. 3. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and two copies to the Commission. b. Each response shall be answered under oath, or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of the person's knowledge, information, and belief formed after a reasonable inquiry.
|
2018-00011
|
3/22/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 370 feet, with attached antennas, to be located at Hwy 127N 7820, Owenton, Kentucky, on a parcel of land located entirely within Owen County, Kentucky. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2018-00028
|
3/22/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Valley Gas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after April 4, 2018. 3. Within 20 days of the date of entry of this Order, Valley Gas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2018-00089
|
3/22/2018
|
20180322_PSC_ORDER.pdf
|
2016-00432
|
3/22/2018
|
20180322_PSC_ORDER.pdf
|
2017-00427
|
3/23/2018
|
PSC_ORDER
Final Order Entered: 1. The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates proposed by Herrington Haven are denied. 3. The rates set forth in the Appendix to this Oder are approved for services
rendered by Herrington Haven on and after the date of this Order. 4. Within 20 days of the date of this Order, Herrington Haven shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order.
|
2017-00311
|
3/23/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Kentucky shall send customer notification via U.S. mail to each of its customers in the Designated Relinquishment Areas no later than June 14, 2018, advising them that AT&T Kentucky plans to discontinue service on August 14, 2018, and that service can be obtained from other providers. 2. AT&T Kentucky's request to withdraw as an ETC in the Designated
Relinquishment Areas as of August 14, 2018, is granted. 3. AT&T Kentucky's request to cancel its authority to operate as an ETC in the
Designated Relinquishment Areas as of August 14, 2018, is granted. 4. A copy of this Order shall be served upon the Federal Communications Commission and the Universal Service Administration Company. 5. This case is now closed and removed from the Commission's docket.
|
2017-00416
|
3/23/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 320 feet, with attached antennas, to be located at 835 Flat Rock Road, Morgantown, Kentucky on a parcel of land located entirely within Butler County, Kentucky. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. . Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00014
|
3/23/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct the wireless telecommunications facility. The proposed facility consists of a tower not to exceed 370 feet, with attached antennas, to be located on a parcel of land located at Wide Creek Road, also known as Kentucky Highway 708, Beattyville, Kentucky. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00059
|
3/23/2018
|
20180323_PSC_ORDER.pdf
|
2018-00076
|
3/23/2018
|
20180323_DATA_REQUEST.pdf
Data Request
|
2017-00415
|
3/26/2018
|
PSC_ORDER
Order Entered: SSA's request to intervene is denied.
|
2017-00435
|
3/26/2018
|
PSC_ORDER
Final Order Entered: This case is dismissed without prejudice and is removed from the Commission's docket.
|
2017-00450
|
3/26/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2017-00482
|
3/26/2018
|
20180326_PSC_ORDER.pdf
|
2017-00349
|
3/27/2018
|
PSC_ORDER
Final Order Entered: 1. East Kentucky's proposed changes to its Cogeneration and Small Power Production Power Purchase Rate Schedule Over 100 kW from Dispatchable Generation Sources tariff and its Cogeneration and Small Power Production Power Purchase Rate
Schedule Equal to or Less Than 100 kW from Dispatchable Generation Sources tariff are approved for service rendered on and after the date of this Order. 2. East Kentucky's proposed new Cogeneration and Small Power Production Power Purchase Rate Schedule Over 100 kW from Non-Dispatchable Generation Sources tariff and its Cogeneration and Small Power Production Power Purchase Rate Schedule Equal to or Less Than 100 kW from Non-Dispatchable Generation Sources tariff, as revised, are approved for service rendered on and after the date of this Order. 3. Within 20 days of the date of this Order, East Kentucky and its distribution cooperatives shall file, using the Commission's electronic Tariff Filing System, its proposed cogeneration tariffs with the Commission reflecting that they were approved
pursuant to this Order.
|
2017-00212
|
3/27/2018
|
PSC_ORDER
Order Entered: 1.) Post hearing data requests shall be filed in the record on or before Friday, March 30th, 2018. 2.) Responses to post hearing data requests shall be filed in the record on or before Tuesday, April 10th, 2018. This case shall stand submitted for decision by the commission effective 12:01 a.m., Eastern Daylight Time, on April 11th, 2018.
|
2017-00374
|
3/27/2018
|
20180327_PSC_ORDER.pdf
Order Entered: Columbia shall continue to use its current PBR mechanism until the Commission issues a Final Order addressing Columbia's request for a five-year extension of its PBR in the pending case.
|
2017-00453
|
3/27/2018
|
20180327_PSC_ORDER.pdf
Order Entered: 1. Martin District's Motion for Protective Order is granted. 2. Martin District shall not be required to respond to the requests for
information submitted by MCCC on March 6, 2018.
|
2018-00017
|
3/27/2018
|
PSC_ORDER
Final Order Entered: 1. Columbia Gas is granted a CPCN that authorizes it to bid on a franchise offered by the city of Paris, Kentucky, for the transmission and distribution of natural gas. 2. If Columbia Gas is not the successful bidder, Columbia Gas shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Columbia Gas was not the successful bidder. 3. If Columbia Gas is the successful bidder, Columbia Gas shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Columbia Gas is the successful bidder, Columbia Gas shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in the said city.
|
2018-00100
|
3/27/2018
|
20180327_PSC_ORDER.pdf
|
2017-00472
|
3/27/2018
|
20180327_Data Request.pdf
Data Request
|
2018-00050
|
3/27/2018
|
20180327_PSC_ORDER.pdf
|
2016-00162
|
3/28/2018
|
PSC_ORDER
Final Order Entered: 1. The presentation at Morehead, Kentucky is accredited and approved for a maximum of two credit hours of water district management training. 2. The presentations at Hawesville and Draffenville, Kentucky, are accredited and approved for a maximum of two credit hours of water district management training. 3. KAWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 4. Within 30 days of this Order, KAWA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, their water district, and the number of hours they attended; d. A copy of any written material given to water commissioners attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification of Water Treatment and Distribution System Operators approved the training for continuing education credit.
|
2017-00429
|
3/28/2018
|
PSC_ORDER
Final Order Entered: 1. The Utility Leadership Institute - 2017 Water Law Series held on October 31, 2017, in Bowling Green, Kentucky is accredited and approved for a maximum of six credit hours of water district management training. 2. KAWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 3. Within 30 days of this Order, KAWA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended; d. A copy of any written material given to water commissioners attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification of Water Treatment and Distribution System Operators approved the training for continuing education credit.
|
2017-00436
|
3/28/2018
|
PSC_ORDER
Final Order Entered: 1. The presentation at Morehead, Kentucky, is accredited and approved for a maximum of two credit hours of water district management training. 2. The presentations at Hawesville and Draffenville, Kentucky, are accredited and approved for a maximum of two credit hours of water district management training. 3. KAWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 4. Within 30 days of this Order, KAWA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; d. A copy of any written material given to water commissioners attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification of Water Treatment and Distribution System Operators approved the training for continuing education credit.
|
2018-00008
|
3/28/2018
|
PSC_ORDER
Final Order Entered: 1. The 2018 Management Conference held February 21-22, 2018, in Bowling Green, Kentucky, is accredited and approved for a maximum of 12 credit hours of water district management training. 2. KRWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 3. Within 30 days of this Order, KRWA shall file with the Commission:
a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended; d. A copy of any written material given to water commissioners
attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification of Water Treatment and Distribution System Operators approved the training for continuing education credit.
|
2018-00016
|
3/28/2018
|
20180328_PSC_ORDER.pdf
|
2016-00059
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00018
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00019
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00020
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00021
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00022
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2018-00023
|
3/28/2018
|
20180328_PSC_ORDER.pdf
|
2018-00034
|
3/28/2018
|
20180328_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
3/28/2018
|
20180328_DATA_REQUEST01.pdf
Data Request
|
2017-00349
|
3/28/2018
|
20180328_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00036
|
3/29/2018
|
DATA_REQUEST
Commission Staff's Post-Hearing Request for Information to Big Sandy Rural Electric Cooperative Corporation
|
2017-00374
|
3/29/2018
|
PSC_ORDER
Final Order Entered: 1. Crittenden-Livingston is authorized to borrow from KACOFC up to $2,105,000, but no more than the total amount needed to pay off the RD indebtedness proposed to be refinanced as identified in the application on the condition that the final NPV of the savings, determined upon closing, generate a positive cash flow. The loan maturity date and interest rate shall be in accordance with the KACOFC refinancing program as described in Crittenden-Livingston's application. 2. Crittenden-Livingston shall execute the KACOFC loan documents as authorized herein. 3. Crittenden-Livingston shall comply with all matters set out in finding paragraphs 3 through 6 as if they were individually so ordered. 4. Any documents filed in the future pursuant to finding paragraphs 3 and 4 shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00047
|
3/29/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Apache Gas Transmission Company, Inc.
|
2018-00106
|
3/29/2018
|
PSC_ORDER
Order Entered: This case shall be continued for 60 additional days, up to and including July 15, 2018.
|
2018-00107
|
3/29/2018
|
20180329_PSC_ORDER.pdf
|
2018-00029
|
3/30/2018
|
PSC_ORDER
Final Order Entered: 1. The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates proposed by Symsonia are denied. 3. The rates set forth in the Appendix to this Order are approved for services rendered by Symsonia on and after the date of this Order. 4. Within 20 days of the date of entry of this Order, Symsonia shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order.
|
2017-00371
|
3/30/2018
|
PSC_ORDER
Final Order Entered: 1. The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates originally proposed by South Hopkins are denied. 3. Within 45 days of publishing the notice required in ordering paragraph
number 7, South Hopkins shall file proof of notice as required pursuant to 807 KAR 5:076, Section 5(3). 4. Within 20 days of the date of entry of this Order, South Hopkins shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order.
|
2017-00420
|
3/30/2018
|
20180330_DATA_REQUEST.pdf
Data Request
|
2017-00179
|
3/30/2018
|
20180330_DATA_REQUEST.pdf
Data Request
|
2018-00057
|
3/30/2018
|
20180330_DATA_REQUEST.pdf
Data Request
|
2017-00472
|
3/30/2018
|
20180330_PSC_ORDER.pdf
|
2018-00035
|
3/30/2018
|
20180330_PSC_ORDER.pdf
|
2018-00034
|
3/30/2018
|
20180330_PSC_ORDER.pdf
|
2017-00179
|
4/2/2018
|
20180402_PSC_ORDER.pdf
Order Entered: 1. A hearing in this matter shall be held on Tuesday, May 15, 2018, at 10 a.m. Eastern Daylight Time, and continue on Wednesday, May 16, 2018, at 9 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard,
Frankfort, Kentucky. 2. South Kentucky Rural Electric Cooperative Corporation ("South Kentucky'') shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: ''This hearing will be
streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is requested, South Kentucky shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing.
|
2018-00050
|
4/2/2018
|
PSC_ORDER
Order Entered: 1. A hearing in this matter shall be held on Wednesday, May 30, 2018, at 9 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Cumberland Valley Electric, Inc. ("Cumberland Valley") shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: ''This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is requested, Cumberland Valley shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing.
|
2018-00056
|
4/2/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.08 per 1,000 Gallons is approved. 2. Levee Road's proposed rates as set forth in Appendix B to this Order are approved for water service rendered by Levee Road on and after March 15, 2018. 3. Within 20 days of the date of this Order, Levee Road shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2018-00099
|
4/2/2018
|
PSC_ORDER
Final Order Entered: 1. Henderson County's request to amend its purchased water adjustment filing, filed on March 19, 2017, is granted.
2. The purchased water adjustment factor of $0.51 per 1,000 gallons is approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Henderson County on and after March 31, 2018. 4. Within 20 days of the date of this Order, Henderson County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00102
|
4/2/2018
|
20180402_DATA_REQUEST.pdf
Data Request
|
2018-00005
|
4/2/2018
|
20180402_DATA_REQUEST.pdf
Data Request
|
2018-00035
|
4/2/2018
|
20180402_PSC_ORDER.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER01.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER02.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER.pdf
|
2017-00483
|
4/2/2018
|
20180402_PSC_ORDER03.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER04.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER05.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER06.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER07.pdf
|
2016-00059
|
4/2/2018
|
20180402_PSC_ORDER08.pdf
|
2016-00059
|
4/3/2018
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky's Motion to dismiss the Complaint with prejudice is granted. 2. Ms. Rule's Complaint is dismissed with prejudice. 3. This case is closed as of the entry date of this order and removed from the Commission's docket.
|
2017-00403
|
4/3/2018
|
PSC_ORDER
Order Entered: 1. KWWOA's Training Program scheduled to take place between April 9, 2018, and April 11, 2018, is hereby conditionally approved and accredited for six hours of water district management training for water district commissioners seeking to satisfy
the training requirements set forth in KRS 74.020 (6) and (7). 2. KWWOA's Training Program may not be used by water district
commissioners seeking to satisfy any portion of the initial training requirement for water district commissioners required by KRS 74.020(8).
3. KWWOA shall retain a record of all water district commissioners attending the Training Program. 4. No Later than 30 days after the scheduled training program, KWWOA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was
performed; b. A description of any changes in the presenters or purposed curriculum that occurred after the application; c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; and d. A copy of any written material given to water district commissioners attending the presentations. 5. Upon receipt of the materials identified in Paragraph No. 4 and provided that there are no material changes to the program, the Commission shall issue a final order approving and accrediting the Training Program.
|
2018-00083
|
4/3/2018
|
20180403_PSC_ORDER.pdf
|
2017-00441
|
4/3/2018
|
20180403_PSC_ORDER.pdf
|
2018-00050
|
4/4/2018
|
20180404_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
4/4/2018
|
20180404_PSC_ORDER.pdf
|
2017-00415
|
4/5/2018
|
PSC_ORDER
Order Entered nunc pro tunc that: 1. The first paragraph of the April 3, 2018 Order is corrected to state: "On September 27, 2017, Ms. Rule filed a complaint alleging that Duke Kentucky overcharged her for utility services." 2. All other provisions of the April 3, 2018 Order shall remain in full force and effect.
|
2017-00403
|
4/5/2018
|
PSC_ORDER
Order Entered: 1. The time in which the Commission must issue its decision in this case is extended to 120 days. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or, for
representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or,
though correct when made, is not incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part
of the requested information that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2018-00004
|
4/5/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a Certificate of CPCN to construct a wireless telecommunications facility. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. AT&T Mobility shall file a copy of the final decisions regarding the pending FAA and KAZC applications for the proposed construction within 10 days of receiving each decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2018-00012
|
4/5/2018
|
PSC_ORDER
Final Order Entered: 1. The boundary changes agreed upon by KU and Kenergy for the Woosley Farm Property are approved. 2. Copies of the Revised Territorial Maps, with the revisions signed by representatives of KU and Kenergy on December 8, 2017 and December 15, 2017, respectively, are attached hereto as an Appendix to this Order, and as it reflects the agreed-upon amended territorial boundary of KU and Kenergy, full-scale copies of the Revised Territorial Maps shall be attached to the Commission's official territorial boundary map. 3. KU's request for deviation from the filing requirements of 807 KAR 5:001, Section 7(1 ) is approved.
|
2018-00069
|
4/5/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order
are approved for final meter readings on and after April 23, 2018. 2. Within 20 days of the date of entry of this Order, Delta shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00112
|
4/5/2018
|
20180405_PSC_ORDER.pdf
|
2016-00413
|
4/5/2018
|
20180405_PSC_ORDER.pdf
|
2017-00468
|
4/5/2018
|
20180405_PSC_ORDER.pdf
|
2018-00036
|
4/6/2018
|
PSC_ORDER
Order Entered: 1. EKPC and each of its Member Cooperatives listed in footnote 2 shall be parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any motion to intervene filed after the date set forth in Appendix A shall show a basis for intervention and good cause for being untimely. If the untimely motion is granted, the movant shall accept and abide by the existing procedural schedule. 4. By the date set forth in Appendix A, EKPC shall file prepared direct testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the application of the pass-through mechanism during the
period under review. 5. Any party filing testimony shall file an original and six copies. 6. a. EKPC and each of its 16-Member Cooperatives shall file responses to the questions asked of the particular cooperative in Appendix B. The information requested herein is due by the date set forth in Appendix A. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the
name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and six copies to the Commission.
|
2018-00075
|
4/6/2018
|
PSC_ORDER
Order Entered: 1. Pollitt shall submit to the Commission, within 20 days of the entry date of this Order, a written response to the allegations contained in the Staff Report. 2. Pollitt shall appear on July 10, 2018, at 9 a.m., Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard in Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of 49 C.F.R. Part 192 and 807 KAR 5:022, and to show cause why it should not be subject to the penalties prescribed in KRS 278.992(1) for these alleged violations. 3. At the scheduled hearing in this matter, Pollitt shall also present evidence on the adequacy, safety, and reasonableness of its practices related to the construction, installation, maintenance, and operation of natural gas facilities.
4. The July 10, 2018 hearing shall be recorded by digital video recording only. 5. The Staff Report attached as an Appendix to this Order is made a part of the record in this case.
|
2018-00103
|
4/6/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed in the application by Nebo are denied. 2. The purchased water adjustment factor of ($0.54) per 1,000 gallons is approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Nebo on and after March 31, 2018. 4. Within 20 days of the date of this Order, Nebo shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00104
|
4/6/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with the original and six copies to the Commission. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information that indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that personal information cannot be read.
|
2018-00107
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2017-00483
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2017-00441
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2018-00040
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2018-00043
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2018-00041
|
4/6/2018
|
20180406_DATA_REQUEST.pdf
Data Request
|
2018-00042
|
4/6/2018
|
20180406_PSC_ORDER.pdf
|
2017-00321
|
4/9/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. 2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for
a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00007
|
4/9/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. 2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for
a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00053
|
4/9/2018
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Sadieville, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2018-00123
|
4/9/2018
|
20180409_PSC_ORDER.pdf
|
2018-00035
|
4/9/2018
|
20180409_PSC_ORDER.pdf
|
2018-00110
|
4/10/2018
|
PSC_ORDER
Order Entered: 1. Estill County's Motion for Reconsideration is granted to the limited extent that Estill County shall appear at a formal hearing on April 16, 2018 at 9 a.m. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky for the purpose of presenting testimony of the issues discussed in the findings above. 2. Estill County's Motion for Conference with Commission Staff is denied as moot. 3. Estill County shall give notice of the hearing by any means available to it in the intervening time. In addition, the notice of hearing shall include the following statement: ''This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed, publication is requested, or is posted on a website or social media platform, Estill County shall forward a duplicate of the notice, request, or posting to the Commission. 4. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing. 5. The record of Commission Case No. 2017-00176 is incorporated into the record of this proceeding by reference
|
2018-00058
|
4/10/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00067
|
4/10/2018
|
20180410_DATA_REQUEST.pdf
Data Request
|
2018-00036
|
4/11/2018
|
PSC_ORDER
Order Entered: 1. Martin's motion to reopen the case to modify the April 6, 2017 Order is granted. 2. The refund options proposed by Martin as set forth in its motion are denied. 3. Martin shall implement a one-month bill credit that refunds $536.45 in equal amounts to Martin's 419 customer accounts. 4. This case is closed and removed from the Commission's docket.
|
2016-00332
|
4/11/2018
|
PSC_ORDER
Order Entered: Kentucky RSA #3's Motion for Extension of Time filed on March 22, 2018, is granted.
|
2017-00143
|
4/11/2018
|
PSC_ORDER01
Order Entered: 1. Mr. Biddle's Request to Intervene is denied. 2. Mr. Potts' Request to Intervene is denied. 3. Mr. Biddle's and Mr. Potts' tendered documents shall be considered as public comment.
|
2017-00143
|
4/11/2018
|
PSC_ORDER
Order Entered: 1. The motion of Republic to intervene is granted. 2. Republic shall be entitled to the full rights of a party and shall be served
with the Commission's Orders and with fi led testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Republic shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Republic shall adhere to the procedural schedule set forth in the Commission's April 5, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001 , Section 8(9), within seven days of entry of this Order, Republic shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00004
|
4/11/2018
|
PSC_ORDER
Final Order Entered: 1. Russ's request for approval and accreditation of the Training Program scheduled to take place on March 21, 2018, is hereby DENIED. 2. Russ's Training Program may not be used by water district commissioners to satisfy their training obligations pursuant to KRS 74.020(6), KRS 74.020(7), or KRS 74.020(8). 3. Within 10 days from the entry of this order, Russ shall: a. Provide the Commission with a list of water district commissioners who attended the Training Program and, if known, their water districts; b. Certify that a copy of this order was sent to each water district commissioner who attended the Training Program. 4. Any document filed pursuant to ordering paragraph 3 of this Order shall reference the number of this case and shall be retained in the post case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00101
|
4/11/2018
|
20180411_DATA_REQUEST.pdf
Data Request
|
2018-00041
|
4/12/2018
|
PSC_ORDER
Order Entered: 1. Duke Kentucky's petition for confidential treatment is denied. 2. Within 10 days of the date of entry of this Order, Duke Kentucky shall file an unredacted copy of the Crounse Agreement using the Commission's process for submitting fuel and transportation contracts. Duke Kentucky shall reference this case number when submitting the Crounse Agreement. 3. The unredacted copy of the Crounse Agreement shall be held confidentially for a period of 30 days from the date of entry of this Order. At the end of this period, the
Crounse Agreement shall be placed in the public record without further notice.
|
2018-00108
|
4/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for final meter readings by Frontier on and after May 1, 2018. Although Frontier's PGA rate filing did not provide 30 days' notice to the Commission as required by its tariff, KRS 278.180(2) authorizes the Commission to make a reduction in rates effective in less than 30 days. 2. Each customer's bill shall separately reflect the approved gas cost reconciliation rate applicable to the customer's service area. 3. Within 20 days of the date of entry of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. The individual gas cost reconciliation rates for Frontier and the
former Public system shall be included in the compliance tariffs.
|
2018-00119
|
4/12/2018
|
20180412_PSC_ORDER.pdf
|
2018-00088
|
4/12/2018
|
20180412_PSC_ORDER.pdf
|
2018-00109
|
4/13/2018
|
PSC_ORDER
Order Entered: 1. Estill County's Motion to Postpone the formal hearing scheduled for April 16, 2018, is granted. 2. The hearing scheduled for April 16, 2018, is cancelled and shall be rescheduled at a later date, if needed. 3. Within five days of receiving notice from KRWFC as to the terms of the proposed refinancing, Estill County shall file a written notice with the Commission stating whether it intends to continue with the refinancing and the anticipated date of filing an amended application if one is needed.
|
2018-00058
|
4/13/2018
|
PSC_ORDER
Commission Staff's Initial Request for Information to Sentra Corporation and Blue Ridge Mountain Resources, Inc. and Sentra Resources LLC
|
2018-00107
|
4/13/2018
|
20180413_DATA_REQUEST.pdf
Data Request
|
2018-00034
|
4/13/2018
|
20180413_PSC_ORDER.pdf
|
2017-00321
|
4/16/2018
|
PSC_ORDER
Final Order Entered: 1. The Training for McCreary Co. Water District held on November 3, 2017, in Whitley City, Kentucky is accredited and approved for a maximum of six credit hours of water district management training. 2. KRWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 3. Within 30 days of the entry of this Order, KRWA shall file with the
Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended; and d. A copy of any written material given to water commissioners
attending the presentations.
|
2017-00434
|
4/16/2018
|
PSC_ORDER
Order Entered: 1. The Training for Oldham Co. Water District held on February 13, 2018, in LaGrange, Kentucky is conditionally accredited and approved for a maximum of six credit hours of water district management training. 2. KRWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 3. Within 30 days of this Order, KRWA shall file with the Commission:
a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended; and d. A copy of any written material given to water commissioners
attending the presentations. 4. Upon receipt of the materials identified in Paragraph No. 3 and provided there are no material changes to the program, the Commission shall issue a final order approving and accrediting the Training Program.
|
2018-00063
|
4/16/2018
|
PSC_ORDER
Order Entered: 1 . This proceeding is established to review the reasonableness of Ledbetter District's proposed rates. 2. No later than July 17, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report ("Staff Report") containing its findings and recommendations regarding Ledbetter District's requested rate adjustment. 3. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 4. If Commission Staff finds that Ledbetter District's financial condition supports a higher rate than Ledbetter District proposes, or the assessment of an additional rate or charge not proposed in Ledbetter District's Application, Ledbetter District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge.
5. If Commission Staff finds that changes should be made to the manner in which Ledbetter accounts for depreciation of Ledbetter District's assets, Ledbetter District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Ledbetter District to implement proposed change for accounting purposes.
|
2018-00117
|
4/16/2018
|
20180416_PSC_ORDER.pdf
|
2017-00179
|
4/16/2018
|
20180416_PSC_ORDER.pdf
|
2018-00022
|
4/16/2018
|
20180416_PSC_ORDER.pdf
|
2018-00018
|
4/16/2018
|
20180416_PSC_ORDER.pdf
|
2018-00050
|
4/17/2018
|
PSC_ORDER
Order Entered nunc pro tunc: 1. The Appendix of the Order of March 30, 2018, is stricken and is replaced by the revised Appendix attached to this Order. 2. All provisions of the Order of March 30, 2018, that are not in conflict with the terms of this Order shall remain in effect.
|
2017-00371
|
4/17/2018
|
PSC_ORDER
Order Entered: 1. Grayson's October 24, 2017 petition for confidential treatment is denied. 2. Within 20 days of the date of this Order, Grayson shall file revised pages reflecting as unredacted the information that has been denied confidential treatment. 3. The materials denied confidential treatment shall be withheld from public inspection for 20 days from the date of this Order to allow Grayson to seek any remedy afforded by law.
|
2017-00419
|
4/17/2018
|
PSC_ORDER
Final Order Entered: This proceeding is dismissed and shall be removed from the Commission's docket.
|
2018-00054
|
4/17/2018
|
PSC_ORDER
Final Order Entered: 1 . Apache's request to implement a $.29 per Mcf charge for its PRP is approved. 2. Apache shall continue to collect its PRP surcharges subject to the escrow terms contained in the final Order in Case No. 2017-00168. 3. The rates in the appendix to this order are approved to be billed starting with the May 1, 2018 Gas Cost Adjustment rates. 4. This case is closed and removed from the Commission's docket.
|
2018-00106
|
4/17/2018
|
20180417_PSC_ORDER.pdf
|
2018-00023
|
4/18/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001 , Section 7, related to the service and electronic filing of documents. 4. The Attorney General shall adhere to the procedural schedule set forth in the Commission's April 5, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001 , Section 8(9) , within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00004
|
4/18/2018
|
PSC_ORDER
Final Order Entered: 1 . Russ's request for approval and accreditation of the Training Program scheduled to take place on March 27, 2018, and March 28, 2018, is hereby denied. 2. Russ's Training Program may not be used by water district commissioners to satisfy their training obligations pursuant to KRS 74.020(6), KRS 74 .020(7), or KRS 74.020(8). 3. Russ's request for a deviation from 807 KAR 5:070, Section 1 (6) is
denied. 4. Within 1 O days from the entry of this order, Russ shall: a. Provide the Commission with a list of water district commissioners who attended the Training Program and, if known, their water districts; and b. Certify to the Commission that a copy of this order was sent to each water district commissioner who attended the Training Program. 5. Any document filed pursuant to ordering paragraph 4 of this Order shall
reference the number of this case and shall be retained in the post case correspondence file. 6. This case is closed and removed from the Commission's docket.
|
2018-00065
|
4/18/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 370 feet in height, with attached antenna and is to be located at 175 Sparks Lane, Beattyville, Kentucky 41311. The coordinates for the proposed facility are North Latitude 37° 32' 58.07" by West Longitude 83° 48' 32.90". 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file. 4. This is closed and removed from the Commission's docket.
|
2018-00096
|
4/18/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 370 feet in height, with attached antenna and is to be located at Bentley Lane, Carlisle, Kentucky 40311. The coordinates for the proposed facility are North Latitude 38° 21 ' 18.23" by West Longitude 83° 57' 30.40". 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. The Applicant shall file a copy of the final decision regarding the pending
KAZC application for the proposed construction within ten days of receiving the decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00098
|
4/18/2018
|
PSC_ORDER
Final Order Entered: 1. KRWA's request for approval and accreditation of the Training Program scheduled to take place on May 22, 2018, and May 23, 2018, is hereby denied without prejudice. 2. KRWA's Training Program may not be used by water district commissioners to satisfy their training obligations pursuant to KRS 74.020(6), KRS 74.020(7), or KRS 74.020(8). 3. Nothing in this order shall be interpreted as preventing KAWA from refiling its request for approval of the Training Program to satisfy the training requirements of KRS 74.020 (6) and (7) in a timely manner with all of the documents required by the Commission as discussed hereinabove and with additional documents and information as necessary to demonstrate how the Training Program will enhance a water district commissioner's understanding of his or her responsibilities and duties.
4. In the event KAWA seeks to file the request, it shall do so 30 days prior to the scheduled date of the program unless it can demonstrate good cause for failing to do so.
|
2018-00128
|
4/18/2018
|
20180418_PSC_ORDER.pdf
|
2017-00179
|
4/18/2018
|
20180418_PSC_ORDER.pdf
|
2018-00035
|
4/18/2018
|
20180418_PSC_ORDER.pdf
|
2017-00321
|
4/18/2018
|
20180418_PSC_ORDER.pdf
|
2018-00093
|
4/18/2018
|
20180418_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
4/19/2018
|
20180419_DATA_REQUEST.pdf
Data Request
|
2018-00041
|
4/19/2018
|
20180419_PSC_ORDER.pdf
|
2016-00413
|
4/19/2018
|
20180419_PSC_ORDER.pdf
|
2017-00349
|
4/20/2018
|
PSC_ORDER
Order Entered: 1 . Duke Kentucky's motion for confidential protection for the Attachment to the ARO Update is granted. 2. The materials set forth in the Attachment to the ARO Update shall not be placed in the public record or made available for public inspection for a period of ten years, or until further Orders of this Commission . 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001 , Section 13(9). 4. Duke Kentucky shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run , Duke Kentucky shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878.If Duke Kentucky is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Duke Kentucky to seek a remedy afforded by law.
|
2015-00187
|
4/20/2018
|
20180420_PSC_ORDER.pdf
Order Entered: 1. A hearing for the purpose of taking evidence on the issues within the scope of this investigation in the instant case shall be held on May 31, 2018, at 9 a.m. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 Sow
|
2016-00142
|
4/20/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $(0.59) per 1,000 gallons is approved. 2. The rates proposed by North Hopkins are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by North Hopkins on and after March 31 , 2018. 4. Within 20 days of the date of entry of this Order, North Hopkins shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00133
|
4/20/2018
|
20180420_DATA_REQUEST.pdf
Data Request
|
2018-00019
|
4/20/2018
|
20180420_DATA_REQUEST.pdf
Data Request
|
2018-00050
|
4/20/2018
|
20180420_DATA_REQUEST01.pdf
Data Request
|
2018-00050
|
4/20/2018
|
20180420_DATA_REQUEST02.pdf
Data Request
|
2018-00050
|
4/23/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2017-00374
|
4/23/2018
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky's request for a waiver from the requirements of 807 KAR 5:058, Sections 7(5) and 8(3), for its 2018 IRP is granted subject to the conditions set forth herein. 2. This case is closed and removed from the Commission's docket.
|
2018-00111
|
4/23/2018
|
20180423_DATA_REQUEST.pdf
Data Request
|
2017-00417
|
4/23/2018
|
20180423_DATA_REQUEST.pdf
Data Request
|
2017-00427
|
4/24/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for final meter readings on and after May 1, 2018.
2. Within 20 days of the date of the entry of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00116
|
4/24/2018
|
PSC_ORDER
Order Entered: 1. No later than July 16, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report ("Staff Report") containing its findings and recommendations regarding North Hopkins's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that North Hopkins's financial condition supports a higher rate than North Hopkins proposes or the assessment of an additional rate or charge not proposed in North Hopkins's Application, North Hopkins in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which North Hopkins accounts for the depreciation of North Hopkins's assets, North Hopkins in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require North Hopkins to implement the proposed change for accounting purposes.
|
2018-00118
|
4/24/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Sentra are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings on and after May 1, 2018. Although Sentra's PGA rate filing did not provide 30 days' notice to the Commission as required by its tariff, KRS 278.180(2) authorizes the Commission to make a reduction in rates effective in less than 30 days. 3. Within 20 days of the date of entry of this Order, Sentra shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2018-00124
|
4/24/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Navitas and set forth in the Appendix to this Order is approved for service rendered by Navitas on and after May 12, 2018. 2. Within 20 days of the date of entry of this Order, Navitas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
3. This case is closed and removed from the Commission's docket.
|
2018-00132
|
4/24/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Burkesville is denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered by Burkesville on and after April 27, 2018. 3. Within 20 days of the date of entry of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00134
|
4/24/2018
|
20180424_PSC_ORDER.pdf
|
2018-00005
|
4/24/2018
|
20180424_PSC_ORDER.pdf
|
2017-00244
|
4/24/2018
|
20180424_PSC_ORDER.pdf
|
2018-00057
|
4/24/2018
|
20180424_PSC_ORDER.pdf
|
2018-00114
|
4/25/2018
|
20180425_DATA_REQUEST.pdf
Commission Staff's First Request for Information to Delta Natural Gas Company, Inc.
|
2018-00086
|
4/25/2018
|
20180425_PSC_ORDER.pdf
|
2017-00328
|
4/25/2018
|
20180425_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00041
|
4/26/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Big Sandy are denied. 2. The rates set forth in the Appendix to this Order are approved for services rendered by Big Sandy on and after the date of this Order. 3. Within 20 days of the date of entry of this Order, Big Sandy shall file with
this Commission , using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and reflecting their effective date and that they were authorized by this Order.
|
2017-00374
|
4/26/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Cawood Water District
|
2018-00068
|
4/26/2018
|
20180426_PSC_ORDER.pdf
Order Entered: 1.Delta's Motion to Utilize Electronic Filing Procedures for this case is granted. 2. All documents submitted in this proceeding shall comply with the Commission 's rules. of procedure as set forth in 807 KAR 5:001 , and any deviation from these rules shall be submitted in writing to the Commission for consideration. 3. Any party filing a paper shall upload an electronic version using the Commission's electronic Filing System and shall file the original and one copy in paper medium. 4. Any request for confidential treatment of material submitted shall conform to the requirements of 807 KAR 5:001, Section 13. 5. Materials submitted to the Commission that do not comply with the rules of procedure or that do not have an approved deviation are subject to rejection pursuant to 807 KAR 5:001, Section 3.
|
2018-00086
|
4/26/2018
|
PSC_ORDER
Order Entered: 1. Within seven days of the date of this Order, Ms. Reynolds shall file a reply, if any, to the Applicant's response in opposition to Ms. Reynolds request for intervention. 2. Upon the expiration of the seven-day period affording Ms. Reynolds for filing a reply, if any, her request for intervention shall stand submitted for a decision based on the record.
|
2018-00095
|
4/26/2018
|
20180426_DATA_REQUEST.pdf
Data Request
|
2018-00005
|
4/27/2018
|
PSC_ORDER
Final Order Entered: 1. Atmos's request to extend and revise its DSM Programs other than the Low- Income Weatherization Program is denied. 2. Atmos's proposed residential and commercial DSM rates are denied. 3. Any future DSM applications filed by Atmos shall include the information as described in the findings above. 4. Atmos's Low-Income Weatherization Program is approved through April 30, 2021, at the proposed budget of $180,000 with a funding level of up to $3 ,000 per qualifying low-income household. 5. The DSM rates in the Appendix to this Order are approved for final meter readings on and after May 1, 2018. 6. Within 20 days of the date of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 7. Atmos shall be allowed to recover any lost revenues and authorized incentives associated with any Commission-approved DSM program consistent with KRS 278.285. Recovery of lost revenues shall be limited to no more than three years, but will be reset to zero upon Commission approval of rates in Atmos's pending base-rate case, and shall not exceed claimed savings over the life of the specific DSM measure.
|
2017-00424
|
4/27/2018
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Big Rivers Electric Corporation
|
2018-00004
|
4/27/2018
|
20180427_DATA_REQUEST.pdf
Data Request
|
2017-00316
|
4/30/2018
|
PSC_ORDER
Final Order Entered: 1. Horvath is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 300 feet in height, with attached antennas, to be located on Hico Road, Calloway County, Kentucky. The coordinates for the proposed facility are North Latitude 36° 42' 56.53" by West Longitude 88° 10' 20.10". 2. Horvath shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2017-00442
|
4/30/2018
|
20180430_PSC_ORDER.pdf
Order Entered: 1. No later than May 29, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings regarding Martin District's rate adjustment. 2. All provisions of the Commission's O
|
2018-00017
|
4/30/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 270 feet, with attached antennas, to be located at 340 Turner Hill Road, Totz, Kentucky on a parcel of land located entirely within Hazard County, Kentucky. The coordinates for the proposed facility are North Latitude 36°55'08.07" by West Longitude 83°10'16.40". 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00078
|
4/30/2018
|
PSC_ORDER
Final Order Entered: 1. The 2018 Water Personnel Training Seminar, which the Commission conducted at Jenny Wiley State Resort Park in Prestonsburg, Kentucky on April 17-18, 2018, is approved for a maximum of 12 credit hours of initial training required by KRS 74.020(8) for newly appointed water district commissioners. 2. The 2018 Water Personnel Training Seminar conducted on April 17- 18, 2018, is also hereby approved and accredited for a maximum of six credit hours of training for water district commissioners seeking to satisfy the training requirements set forth in KRS 74.020(6) and (7). 3. Within 20 days of the date of this Order, Commission Staff shall file into the post case correspondence file for this case a list of the name of each attendee, his or her water district, and the number of hours that he or she attended the training program.
|
2018-00137
|
4/30/2018
|
20180430_PSC_ORDER.pdf
|
2017-00483
|
4/30/2018
|
20180430_PSC_ORDER.pdf
|
2018-00041
|
5/1/2018
|
20180501_DATA_REQUEST.pdf
Commission Staff's Fifth Request for Information to Martin County Water District
|
2016-00142
|
5/2/2018
|
20180502_PSC_ORDER.pdf
Order Entered: 1. MCCC's motion to compel Martin District to fully respond to MCCC's Second Data Request is sustained. 2. Martin District shall fully and completely respond to each data request including subparts thereof without objection on or before May
|
2016-00142
|
5/2/2018
|
20180502_PSC_ORDER.pdf
|
2017-00427
|
5/3/2018
|
PSC_ORDER
Final Order Entered: 1. Flemingsburg is assessed a penalty in the amount of $60,000 for violation of 49 C.F.R. §§192.605(a), 192.751(a), 199.105(b), 199.225(a). 2. Flemingsburg shall pay $30,000 of the assessed civil penalty within 30 days of date of this Order by cashier's check or money order payable to the Kentucky State Treasurer, and mailed or delivered to the Office of the General Counsel, Kentucky Public Service Commission, 211 Sower Boulevard, Post Office Box 615, Frankfort, Kentucky 40602. The remaining $30,000 of the civil penalty shall be suspended on the condition that Flemingsburg complies with the ordering paragraphs 3, 4, and 5 of this Order within the timeframe allowed. 3. Within three months of the date of this Order, Flemingsburg shall provide, through a qualified third party, additional mandatory training to all employees who work on or near natural gas facilities on the requirement to remove each potential ignition source from any area where gas is being vented into the open air. 4. Within three months of the date of this Order, Flemingsburg shall provide, through a qualified third party, additional mandatory training to all supervisors of employees who work on or near natural gas facilities regarding the proper procedure for post-incident drug and alcohol testing. 5. Within 30 days of completion of the training ordered in ordering paragraphs 3 and 4 of this Order, Flemingsburg shall certify to the Commission in writing that it has completed such training.
|
2017-00079
|
5/3/2018
|
20180503_PSC_ORDER.pdf
|
2017-00321
|
5/3/2018
|
20180503_PSC_ORDER01.pdf
|
2017-00321
|
5/3/2018
|
20180503_PSC_ORDER02.pdf
|
2017-00321
|
5/3/2018
|
20180503_PSC_ORDER.pdf
|
2017-00349
|
5/4/2018
|
PSC_ORDER
Final Order Entered: 1. All motions in this proceeding that have yet to be addressed are denied as moot. 2. This proceeding is closed and shall be removed from the Commission's docket.
|
2017-00467
|
5/4/2018
|
PSC_ORDER
Final Order Entered: 1. Estill District's motion to withdraw its application to execute a loan agreement with KRWFC to borrow approximately $2,745,000 to refund certain outstanding debt obligations filed on February 5, 2018, is granted. 2. All motions in this proceeding that have yet to be addressed are denied as moot. 3. This proceeding is closed and shall be removed from the Commission's docket.
|
2018-00058
|
5/4/2018
|
PSC_ORDER
Order Entered nunc pro tunc that: 1. The April 2, 2018 Order is corrected to reflect the water coin vendor rate of $5.63 per 1,000 Gallons to Appendix B, as attached to this Order. 2. All other provisions of the April 2, 2018 Order shall remain in full force and effect.
|
2018-00099
|
5/4/2018
|
Data Request
Commission Staff' Second Request for Information to Sentra Corporation, Blue Ridge Mountain Resources, Inc. and Sentra Resources, LLC
|
2018-00107
|
5/4/2018
|
PSC_ORDER
Final Order Entered: 1. KRWA's request for approval and accreditation for the three regional training programs scheduled for April 10, 2018, April 12, 2018, and April l 19, 2018, is hereby denied. 2. KRWA's training programs scheduled for April 10, 2018, April 12, 2018, and April 19, 2018, may not be used by water district commissioners to satisfy their training obligations pursuant to KRS 74.020(6), KRS 74.020(7), or KRS 74.020(8). 3. Within ten days from the entry of this order, KRWA shall: a. Provide the Commission with a list of water district commissioners
who attended the training programs and, if known, their water districts; and b. Certify to the Commission that a copy of this order was sent to each water district commissioner who attended the training programs. 4. Any document filed pursuant to ordering paragraph 4 of this Order shall reference the number of this case and shall be retained in the post case correspondence file. 5. This case is closed and removed from the Commission's active docket.
|
2018-00126
|
5/4/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Inter-County Energy Cooperative Corporation
|
2018-00129
|
5/4/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $1.33 per 1,000 Gallons is approved. 2. The rates proposed by Marion County are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Marion County on and after April 16, 2018. 4. Within 20 days of the date of entry of this Order, Marion County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00135
|
5/4/2018
|
20180504_PSC_ORDER.pdf
|
2017-00321
|
5/4/2018
|
20180504_PSC_ORDER01.pdf
|
2017-00321
|
5/4/2018
|
20180504_PSC_ORDER.pdf
|
2017-00179
|
5/8/2018
|
20180508_PSC_ORDER.pdf
Order Entered: 1. Martin District's Motion for Protective Order filed on May 7, 2018, is denied as moot. 2. Martin District is ordered to comply with the Commission's May 2, 2018 Order. 3. Martin District's failure to provide MCCC with a full and complete
|
2016-00142
|
5/8/2018
|
PSC_ORDER
Order Entered: 1. Cumberland Valley's motion to schedule an IC is granted. 2. An IC shall be held on Monday, May 21, 2018, at 11 a.m., Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to discuss substantive and procedural matters related to the case. 3. Commission Staff shall contact the parties by electronic mail to provide details for joining the conference by telephone.
|
2018-00056
|
5/8/2018
|
20180508_PSC_ORDER.pdf
|
2018-00050
|
5/8/2018
|
20180508_PSC_ORDER01.pdf
|
2018-00050
|
5/8/2018
|
20180508_DATA_REQUEST.pdf
Data Request
|
2018-00035
|
5/8/2018
|
20180508_DATA_REQUEST.pdf
Data Request
|
2017-00179
|
5/8/2018
|
20180508_PSC_ORDER02.pdf
|
2018-00050
|
5/9/2018
|
PSC_ORDER
Order Entered: 1. Cumberland Valley's Revised Motion for confidential treatment filed on March 22, 2018, is denied. 2. Cumberland Valley's Second Revised Motion for confidential treatment of the component pricing filed on April 2, 2018, is granted. 3. Within seven days of the date of the entry of this Order, Cumberland Valley shall file a revised version of the materials at issue, reflecting as redacted only the specific
component pricing information and as unredacted the total cost of the proposed project and Exhibit 6 to the Application. 4. The materials for which confidential treatment was sought in the Second Revised Motion shall not be made available to the public for a period of ten years from the date of this order, unless and until the Commission orders otherwise. 5. Use of the materials for which confidential treatment was granted in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 6. Cumberland Valley shall inform the Commission if the materials for which confidential treatment was granted become publicly available or no longer qualify for confidential treatment.
|
2018-00056
|
5/9/2018
|
20180509_PSC_ORDER.pdf
|
2017-00483
|
5/9/2018
|
20180509_PSC_ORDER.pdf
|
2018-00091
|
5/9/2018
|
20180509_PSC_ORDER.pdf
|
2018-00110
|
5/9/2018
|
20180509_DATA_REQUEST.pdf
Data Request
|
2017-00328
|
5/10/2018
|
PSC_ORDER
Order Entered: 1. Atmos's petition for confidential protection for Exhibit D, Page 5 of 6, is granted and the information shall not be placed in the public record or made available for public inspection until further Orders of this Commission. 2. Atmos's petition for confidential protection for the WACOG schedule filed in support of Exhibit C, Page 2 of 2, is granted, and the information shall not be placed in the public record or made available until further Orders of this Commission. 3. Use of the material in question in any Commission proceeding shall be in
compliance with 807 KAR 5:001, Section 13(9). 4. Atmos shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted
confidential treatment by this Order then Atmos shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Atmos is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested material available for inspection for 20 days following an Order finding that the material no longer qualifies for confidential protection in order to allow Atmos to seek a remedy afforded by law.
|
2018-00116
|
5/10/2018
|
PSC_ORDER
Final Order Entered: 1. Duke Energy is granted a CPCN that authorizes it to bid on a franchise offered by the city of Warsaw, Kentucky, for a natural gas transmission and distribution service. 2. If Duke Energy is not the successful bidder, Duke Energy shall, within ten days of the award of the franchise at issue, fi le with the Commission a written notice stating that Duke Energy was not the successful bidder. 3. If Duke Energy is the successful bidder, Duke Energy shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Duke Energy is the successful bidder, Duke Energy shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00151
|
5/10/2018
|
20180510_PSC_ORDER.pdf
|
2017-00179
|
5/10/2018
|
20180510_PSC_ORDER.pdf
|
2018-00088
|
5/10/2018
|
20180510_PSC_ORDER.pdf
|
2018-00086
|
5/10/2018
|
20180510_PSC_ORDER.pdf
|
2018-00142
|
5/11/2018
|
20180511_PSC_ORDER.pdf
|
2018-00086
|
5/11/2018
|
20180511_PSC_ORDER.pdf
|
2018-00044
|
5/14/2018
|
PSC_ORDER
Final Order Entered: 1. New Cingular is granted a CPCN to construct a wireless telecommunications facility. 2. New Cingular shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. New Cingular shall file a copy of the final decision regarding the pending
KAZC and FAA applications within ten days of receiving a decision. 4. Documents filed , if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00080
|
5/14/2018
|
20180514_PSC_ORDER.pdf
|
2018-00044
|
5/15/2018
|
PSC_ORDER
Final Order Entered: 1. The Complaint is dismissed for lack of jurisdiction. 2. This case is closed and removed from the Commission's docket.
|
2018-00120
|
5/16/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Columbia and set forth in Appendix A to this Order are approved for billing beginning on May 31, 2018. 2. Columbia shall file responses to the requests for information in Appendix B along with its GCA application for rates effective with the September 2018 billing cycle. 3. Within 20 days of the date of entry of this Order, Columbia shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Columbia's future GCA applications shall include the information required in finding paragraph 11.
5. This case is closed and removed from the Commission's docket.
|
2018-00150
|
5/16/2018
|
20180516_PSC_ORDER.pdf
|
2017-00427
|
5/16/2018
|
20180516_DATA_REQUEST.pdf
Data Request
|
2017-00472
|
5/16/2018
|
20180516_PSC_ORDER.pdf
|
2018-00029
|
5/17/2018
|
20180517_PSC_ORDER.pdf
|
2017-00349
|
5/17/2018
|
20180517_PSC_ORDER01.pdf
|
2017-00349
|
5/18/2018
|
PSC_ORDER
Final Order Entered: 1. EKPC is granted a CPCN to construct the environmental compliance projects discussed herein, including the Peg's Hill Landfill, to comply primarily with the CCR Rule and the ELG Rule. 2. EKPC's request to amend its Environmental Compliance Plan as reflected in the 2018 Compliance Plan for purposes of recovering the costs of the proposed project through its environmental surcharge is granted. 3. EKPC's request to approve the settlement of the Spurlock ash pond ARO and associated regulatory asset as set forth in its application is granted. 4. EKPC shall file an appropriate application and seek Commission approval for a CPCN prior to commencing construction of any additional phases of landfill expansions at Spurlock.
|
2017-00376
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00050
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00139
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2017-00321
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00018
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00019
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00020
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00021
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00022
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00023
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00024
|
5/18/2018
|
20180518_PSC_ORDER.pdf
|
2018-00025
|
5/18/2018
|
20180518_DATA_REQUEST.pdf
Data Request
|
2018-00044
|
5/21/2018
|
PSC_ORDER
Order Entered: 1. EKPC's motions for confidential treatment are granted in part and denied in part. 2. The maps of Spurlock Station and other facilities for which confidential treatment was sought meet the criteria for confidential treatment and, therefore, those materials shall be exempt from public disclosure, unless and until this Commission orders otherwise. 3. The material regarding the benefits of PJM membership for which confidential treatment was sought do not meet the criteria for confidential treatment and, therefore, those materials shall be made available to the public. 4. Lines 11 through 36 of page 1 of Exhibit RH-1; Lines 48 through 53 of page 1 of Exhibit RH-1; Lines 56 through 59 of page 1 of Exhibit RH-1; Lines 19 through 52 of page 2 of Exhibit RH-1; Lines 59 through 62 of page 2 of Exhibit RH-1; Lines 70
through 72 of page 2 of Exhibit RH-1; and Lines 76 through 79 of page 2 of Exhibit RH-1, with the exception of the first column on the left of each page of the spreadsheet, meet the criteria for confidential treatment and, therefore, that information shall be exempt from public disclosure for a period of seven years from that date of this Order, unless and until this Commission orders otherwise. 5. The remaining lines of Exhibit RH-1 and the whole of the first column on the left side of each page do not meet the criteria for confidential treatment and,
therefore, that information shall be made available to the public.
|
2017-00376
|
5/21/2018
|
PSC_ORDER
Order Entered: 1. Atmos's motion for rehearing and clarification is granted as discussed in the finding above. 2. Within 90 days from the date of this Order, Atmos shall notify its customers that purchases made or contracts entered into after April 30, 2018, no longer qualify for
a rebate due to the termination of the program and that all requests for a rebate must be completed and submitted within that time period.
|
2017-00424
|
5/21/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Cumberland Valley Electric, Inc.
|
2018-00056
|
5/21/2018
|
PSC_ORDER
Order Entered: 1. The Commission grants reconsideration of its April 11, 2018 Order in this matter and alters and amends that Order as set forth herein. 2. The training session entitled DOW Update that took place as part of Russ, lnc.'s Training Program on March 21, 2018 is hereby approved and accredited for a maximum of one hour of water district management training for commissioners seeking
to satisfy the six hours of training described in KRS 74.020 (6) and (7). 3. The training session entitled Sample Collection and Preservation that took place as part of Russ, lnc.'s Training Program on March 21, 2018, is hereby approved and accredited for 1.25 hours of water district management training for commissioners seeking to satisfy the 6 hours of training described in KRS 74.020 (6) and (7). 4. The training sessions Operator Ethics, Developing SOP's, and Distribution O&M that took place as part of Russ, lnc.'s Training Program on March 21, 2018, are not approved and accredited, and, therefore, may not be used by water district commissioners to satisfy any portion of the six hours of training described in KRS 74.020 (6) and (7). 5. No portion of Russ, lnc.'s Training Program may be used by water district
commissioners seeking to satisfy any portion of the initial training for commissioners required by KRS 74.020(8).
|
2018-00101
|
5/21/2018
|
20180521_DATA_REQUEST.pdf
Data Request
|
2018-00050
|
5/21/2018
|
20180521_DATA_REQUEST01.pdf
Data Request
|
2018-00050
|
5/22/2018
|
20180522_STAFF_REPORT.pdf
Notice of Filing of Commission Staff Report
|
2018-00017
|
5/22/2018
|
20180522_PSC_ORDER.pdf
Order Entered: Windstream East is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days from the date of service of this Order.
|
2018-00157
|
5/23/2018
|
PSC_ORDER
Order Entered: 1. Mr. Biddle's Request for Rehearing is denied. 2. Mr. Biddle's tendered documents shall be considered as public comment.
|
2017-00143
|
5/23/2018
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2018-00030
|
5/23/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed in the application by Southeast Daviess are approved. 2. The purchased water adjustment factor of $0.14 per 1,000 gallons is approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Southeast Daviess on and after June 1, 2018. 4. Within 20 days of the date of this Order, Southeast Daviess shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00144
|
5/23/2018
|
20180523_DATA_REQUEST.pdf
Data Request
|
2018-00038
|
5/23/2018
|
20180523_PSC_ORDER.pdf
|
2018-00143
|
5/23/2018
|
20180523_PSC_ORDER.pdf
|
2017-00427
|
5/23/2018
|
20180523_PSC_ORDER.pdf
|
2017-00321
|
5/24/2018
|
PSC_ORDER
Order Entered: 1. The Commission will extend the extend the statutory application period an additional 60 days, up to and through July 24, 2018, to further investigate the application. 2. East Kentucky shall file with the Commission the original and ten copies of its responses to the requests for information set forth in the Appendix to this Order within 15 days of the date of this Order. 3. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00115
|
5/25/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Rivers Electric Corporation
|
2018-00004
|
5/25/2018
|
20180525_DATA_REQUEST.pdf
Data Request
|
2018-00029
|
5/25/2018
|
20180525_DATA_REQUEST.pdf
Data Request
|
2017-00427
|
5/29/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Joint Applicants Edmonson County Water District and Caveland Sanitation Authority d/b/a Caveland Environmental Authority
|
2018-00127
|
5/29/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Taylor County Rural Electric Cooperative Corporation
|
2018-00130
|
5/29/2018
|
PSC_ORDER
Final Order Entered: Navitas's Application to approve long-term financing is denied and that this case is closed and removed from the Commission's docket.
|
2018-00149
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00018
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00044
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00019
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00022
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00023
|
5/29/2018
|
20180529_PSC_ORDER.pdf
|
2018-00034
|
5/29/2018
|
20180529_DATA_REQUEST.pdf
Data Request
|
2018-00005
|
5/29/2018
|
20180529_DATA_REQUEST01.pdf
Data Request
|
2018-00005
|
5/29/2018
|
20180529_DATA_REQUEST02.pdf
Data Request
|
2018-00005
|
5/29/2018
|
20180529_DATA_REQUEST03.pdf
Data Request
|
2018-00005
|
5/30/2018
|
PSC_ORDER
Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. KIUC shall adhere to the procedural schedule set forth in the Commission's November 9, 2017 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and
b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2017-00384
|
5/30/2018
|
PSC_ORDER01
Order Entered: 1. The motion of the Sierra Club to intervene is granted. 2. Sierra Club shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Sierra Club shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Sierra Club shall adhere to the procedural schedule set forth in the Commission's November 9, 2017 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this
Order, the Sierra Club shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive
electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served .
|
2017-00384
|
5/30/2018
|
PSC_ORDER
Final Order Entered: 1. Billy Driskill and James K. Shadowen are appointed to fill the two vacant seats identified in the February 21, 2018 Order. Their terms shall expire June 30, 2021. 2. The Executive Director shall serve a copy of this Order upon the Marshall County Judge/Executive, the members of the Marshall County Fiscal Court, the Marshall County Attorney, and the North Marshall District's Board of Commissioners. 3. This proceeding is closed and removed from the Commission's docket.
|
2018-00011
|
5/30/2018
|
PSC_ORDER
Order Entered: 1. Post hearing data requests shall be filed in the record on or before Friday, June 1, 2018. 2. Responses to post hearing data requests shall be filed in the record on or before Thursday, June 21, 2018. 3. This case shall stand submitted for decision by the commission effective 12:01 a.m., Eastern Daylight Time, on June 22, 2018.
|
2018-00056
|
5/30/2018
|
PSC_ORDER
Order Entered: The joint application filed by Edmonson and Caveland requesting approval of the transfer of the sewer system in the Chalybeate area east of the Green River is continued for an additional 60 days up to and including August 2, 2018.
|
2018-00127
|
5/30/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is established to investigate the reasonableness of the proposed Agreement. 2. The filing is suspended for five months from May 31, 2018, up to and including October 31, 2018.
|
2018-00164
|
5/30/2018
|
20180530_DATA_REQUEST.pdf
Data Request
|
2018-00034
|
5/31/2018
|
PSC_ORDER
Order Entered: 1. Cumberland Fall's petition for confidential protection for all paper and electronic diagrams and maps of the Cumberland Fall's water distribution system submitted with its application is granted. 2. The designated material shall not be placed in the public record or made available for public inspection until further Orders of this Commission. 3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Cumberland Falls shall inform the Commission if the material in question
becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order, Cumberland Falls shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Cumberland
Falls is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested material available for inspection for 20 days following an Order finding that the material no longer qualifies for confidential treatment in order to allow Cumberland Falls to seek a remedy afforded by
law.
|
2017-00268
|
5/31/2018
|
PSC_ORDER01
Final Order Entered: 1. Kentucky RSA #3 is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 250 feet, with attached antennas, to be located at 20839 North Highway 259, Stephensport,
Kentucky on a parcel of land located entirely within Breckinridge County, Kentucky. 2. Kentucky RSA #3 shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00062
|
5/31/2018
|
20180531_PSC_ORDER.pdf
|
2018-00038
|
5/31/2018
|
20180531_PSC_ORDER.pdf
|
2017-00328
|
5/31/2018
|
20180531_PSC_ORDER.pdf
|
2017-00441
|
5/31/2018
|
20180531_PSC_ORDER.pdf
|
2017-00321
|
5/31/2018
|
20180531_PSC_ORDER.pdf
|
2017-00316
|
6/1/2018
|
PSC_ORDER
Order Entered: 1. Don Arnold and Deborah Arnold's motion to intervene and for an evidentiary hearing or public meeting is denied.
2. Nothing in this order shall affect a member of the public's right to file public comments with the Commission or the Commission's consideration of those comments in a manner consistent with the relevant statutes and regulations.
|
2018-00031
|
6/1/2018
|
DATA_REQUEST
Commission Staff's First Post-Hearing Request for Information to Cumberland Valley Electric, Inc.
|
2018-00056
|
6/1/2018
|
PSC_ORDER
Order Entered: 1. A hearing in this matter shall be held on Tuesday, June 19, 2018, at 9 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Sentra Corporation, Blue Ridge Mountain Resources, Inc., and Sentra Resources LLC (collectively, "Sentra") shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC
website, psc.ky.gov." At the time the notice is mailed or publication is requested, Sentra shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing.
|
2018-00107
|
6/1/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and eight copies to the Commission.
b. Each response shall be under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. Any party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that the personal information cannot be read.
|
2018-00146
|
6/4/2018
|
PSC_ORDER
Final Order Entered: 1. Kentucky RSA #3 is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 240 feet in height, with attached antennas, to be located at 6199 Highway 2779,
Hardinsburg, Breckinridge County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 54'07.45" by West Longitude 86° 31 '56.18". 2. Kentucky RSA #3 shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2017-00143
|
6/4/2018
|
PSC_ORDER
Order Entered: Norman T. Funk and Thomas J. Costakis are admitted pro hac vice for the purpose of representing Big Rivers in association with Laura Chambliss, Tyson Kamuf, and James M. Miller in the above-styled proceeding, provided that Laura Chambliss, Tyson Kamuf, James M. Miller, or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.
|
2018-00146
|
6/4/2018
|
PSC_ORDER
Order Entered: 1. Each LDC and municipal natural gas system operator under Commission jurisdiction is made a party to this proceeding and shall be served with a copy of this order. 2. Each LDC and municipal natural gas system operator under Commission jurisdiction shall include the above language in customer bills as soon as practicable but, in no case, later than the first bills issued on or after July 2, 2018. The language shall be included for at least one complete billing cycle. 3. Each LDC and municipal natural gas system operator under Commission
jurisdiction shall certify to the Commission, no later than 30 days after the first inclusion of the notice in customer bills, that it has complied with this order. The certification, which may be made either as a filing in this proceeding or by letter to the Commission, shall include a sample of both printed and electronic bills (if applicable) including the notice.
|
2018-00171
|
6/4/2018
|
20180604_PSC_ORDER.pdf
|
2017-00349
|
6/5/2018
|
20180605_DATA_REQUEST.pdf
Commission Staff's Fifth Post-Hearing Request for Information to Martin County Water District
|
2016-00142
|
6/5/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Cawood Water District
|
2018-00068
|
6/5/2018
|
PSC_ORDER
Order Entered: 1. Complainant shall have 14 days from the date this Order is entered to file an amended complaint with the Commission that conforms to the requirements of 807 KAR 5:001, Section 20. 2. If Complainant does not file an amended complaint with the Commission
that conforms to the requirements of 807 KAR 5:001, Section 20 within 14 days from the date this Order is entered, this matter will be dismissed without prejudice. 3. Brandenburg Telephone shall have no obligation to file an answer or responsive pleading to the complaint or any supplement or amendment thereto until ordered to do so by this Commission.
|
2018-00173
|
6/5/2018
|
20180605_PSC_ORDER.pdf
|
2018-00086
|
6/6/2018
|
20180606_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
6/6/2018
|
20180606_PSC_ORDER.pdf
|
2017-00483
|
6/6/2018
|
20180606_PSC_ORDER.pdf
|
2018-00041
|
6/6/2018
|
20180606_DATA_REQUEST.pdf
Data Request
|
2018-00044
|
6/7/2018
|
20180607_PSC_ORDER.pdf
Order Entered: 1 . MCCC's Motion for Extension of Time to Respond to the Staff Report is granted. 2. Martin District's Motion for Extension of Time is granted. 3. MCCC and Martin District shall have until June 30, 2018, to file responses to the Staff Repor
|
2018-00017
|
6/7/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 270 feet in height, with attached antenna and is to be located at 45 Clem Cemetery Road, Cawood, KY 40815. The coordinates for the proposed facility are North Latitude 36° 47' 52.34" by West Longitude 83° 12' 33.86". 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00094
|
6/7/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness who will be responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and seven copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising
the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. Careful attention should be given to copied material to ensure that it is legible.
|
2018-00164
|
6/7/2018
|
PSC_ORDER
Final Order Entered: 1. LG&E is granted a CPCN that authorizes it to bid on a franchise offered by the city of Bardstown, Kentucky, for natural gas service. 2. If LG&E is not the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that LG&E was not the successful bidder. 3. If LG&E is the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If LG&E is the successful bidder, LG&E shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in the said city.
|
2018-00169
|
6/7/2018
|
20180607_PSC_ORDER.pdf
|
2017-00417
|
6/7/2018
|
20180607_DATA_REQUEST.pdf
Data Request
|
2018-00029
|
6/8/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Roger W. Parry
|
2017-00452
|
6/8/2018
|
20180608_DATA_REQUEST.pdf
Data Request
|
2017-00417
|
6/12/2018
|
20180612_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order, which is attached hereto and incorporated herein, shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall
|
2017-00263
|
6/12/2018
|
PSC_ORDER
Final Order Entered: 1. Grant County's Application requesting an alternative inspection schedule for its grinder/pump stations pursuant to 807 KAR 5:071, Section 7(4) is approved. 2. Grant County's residential grinder/pump stations shall be inspected annually.
|
2018-00097
|
6/12/2018
|
PSC_ORDER
Order Entered: 1. On or before June 15, 2018, Sentra Corporation, Blue Ridge Mountain Resources, Inc., and Sentra Resources LLC (collectively, "Sentra"), shall provide the names and titles of each witness Sentra intends to call at the June 19, 2018 hearing and the order in which Sentra intends to call its witnesses. 2. On or before June 15, 2018, Sentra shall file with the Commission a list of all documents that it intends to offer as exhibits, and an original in paper medium of any document that will be presented as an exhibit that has not been previously filed with the Commission in this proceeding.
|
2018-00107
|
6/12/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located near 486 Appalachian Tower Road,
Williamsburg, Whitley County, Kentucky. The coordinates for the proposed facility are North Latitude 36°44'45.1435" by West Longitude 84 °11 '22.5594". 2. Appalachian Wireless shall file a copy of the final decisions regarding the pending KAZC and FAA applications for the proposed construction within 10 days of receiving the decision. 3. Appalachian Wireless shall immediately notify the Commission in writing if,
after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00122
|
6/12/2018
|
20180612_PSC_ORDER.pdf
|
2017-00321
|
6/12/2018
|
20180612_PSC_ORDER.pdf
|
2018-00020
|
6/12/2018
|
20180612_PSC_ORDER.pdf
|
2018-00021
|
6/13/2018
|
PSC_ORDER
Order Entered nunc pro tunc: 1. Ordering paragraph three is stricken from the March 30, 2018 Order. 2. The rates set forth in the Appendix to this Order are approved for services rendered by South Hopkins on and after the date of the March 30, 2018 Order. 3. All other provisions of the Commission's March 30, 2018 Order not in conflict with this Order shall remain in full force and effect.
|
2017-00420
|
6/13/2018
|
PSC_ORDER
Order Entered: 1. Sentra Resources' motion for confidential protection for designated material contained in the response to Staff's First Request, Item 9 is granted. 2. The designed materials shall not be placed in the public record or made available for public inspection for an indefinite period of time, or until further Orders of this Commission. 3. Use of the materials in question in any proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Sentra Resources shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order, Sentra Resources shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Sentra Resources is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Sentra Resources to seek a remedy afforded by law.
|
2018-00107
|
6/13/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 270 feet in height, with attached antenna, and is to be located at 2126 Wrights Ridge Road, Milton, Kentucky. The coordinates for the proposed facility are 38°40'25.13" North latitude, 85°15'33.67" West longitude. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00121
|
6/13/2018
|
PSC_ORDER
Order Entered: 1. Inter-County's proposed rates are suspended for five months from June 28, 2018, up to and including November 27, 2018.
2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties and an original and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information , that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2018-00129
|
6/13/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 199 feet in height, with attached antenna, and is to be located at 2157 Frames Branch, Clay City, Kentucky. The coordinates tor the proposed facility are 37°48'23.07" North latitude, 83°57'09.14" West longitude. 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, it any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00141
|
6/13/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule established by the June 1, 2018 Order shall be amended. 2. The procedural schedule set forth in the Appendix to this Order shall be followed.
|
2018-00146
|
6/13/2018
|
PSC_ORDER
Order Entered: 1. Big Rivers and each of its three Member Cooperatives listed in footnote 2 shall be made parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any motion to intervene filed after the date set forth in Appendix A shall show a basis for intervention and good cause tor being untimely. If the untimely motion is granted, the movant shall accept and abide by the existing procedural schedule. 4. By the date set forth in Appendix A, Big Rivers shall file its prepared direct
testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the three Member Cooperatives, or Big Rivers on their behalf, shall file by that date their prepared direct testimony in support of the reasonableness of
the application of the pass-through mechanism during the periods under review. 5. Any party filing testimony shall file an original and six copies. 6. a. The information requested herein is due on or before the date specified in Appendix A to this Order. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and six copies to the Commission.
|
2018-00163
|
6/14/2018
|
20180614_DATA_REQUEST.pdf
Data Request
|
2018-00159
|
6/15/2018
|
20180615_PSC_ORDER.pdf
Order Entered: 1. A hearing for the purpose of taking evidence on the issues within the scope of this investigation in the instant case shall be held on August 29, 2018 at 9 a.m. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 S
|
2016-00142
|
6/15/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule established pursuant to the Order issued on April 5, 2018, shall be amended to the limited extent as follows: Big Rivers Electric Corporation or any Intervenor shall request either a hearing or that the case be submitted for a
decision based on the record no later than June 20, 2018. 2. All other provisions of the April 5, 2018 Order shall remain in full force and effect.
|
2018-00004
|
6/15/2018
|
PSC_ORDER
Order Entered: 1. Inter-County's motion for an extension of time is granted. 2. Inter-County shall file its responses to Commission Staff's First Request for Information on or before June 19, 2018.
|
2018-00129
|
6/15/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Bluegrass is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after July 1, 2018. 3. Within 20 days of the date of entry of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00158
|
6/15/2018
|
PSC_ORDER
Order Entered: 1. Dawson Springs' proposed rate for wholesale water service to South Hopkins is suspended for five months, from June 26, 2018, to November 25, 2018. 2. South Hopkins is made a party to this case. 3. Requests for intervention shall be filed no later than July 10, 2018. Any party who submits a motion to intervene after July 10, 2018, and upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule.
|
2018-00189
|
6/15/2018
|
20180615_DATA_REQUEST.pdf
Data Request
|
2018-00044
|
6/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Natural Energy and set forth in the Appendix to this Order is approved for service rendered by Natural Energy on and after July 1, 2018. 2. Within 20 days of the date of entry of this Order, Natural Energy shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00160
|
6/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by B&H are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered on and after July 1, 2018, subject to further revision based upon the final outcome of the appeal of the Commission's Order in Case No. 2015-00367. 3. Within 20 days of the date of entry of this Order, B&H shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
4. This case is closed and removed from the Commission's docket.
|
2018-00161
|
6/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Western Lewis is denied. 2. The rate set forth in the Appendix to this Order is approved for service rendered by Western Lewis on and after July 1, 2018. 3. Within 20 days of the date of entry of this Order, Western Lewis shall file
with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00167
|
6/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Martin and set forth in the Appendix to this Order is approved for service rendered by Martin on and after July 1, 2018. 2. Within 20 days of the date of entry of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00168
|
6/18/2018
|
20180618_PSC_ORDER.pdf
|
2018-00044
|
6/19/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 100 feet in height, with attached antennas, to be located near 843 Breckinridge Street, Stanton, Powell County, Kentucky. The coordinates for the proposed facility are North Latitude 37°51 '19.1623" by West Longitude 83°51 '39.6659".
2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00002
|
6/19/2018
|
PSC_ORDER
Order Entered: 1. Post hearing data requests shall be filed in the record on or before Friday, June 22, 2018. 2. Responses to post hearing data requests shall be filed in the record on or before Tuesday, July 3, 2018. 3. This case shall stand submitted for decision by the Commission effective 12:01 a.m. , Eastern Daylight Time, on July 4, 2018.
|
2018-00107
|
6/19/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's
regulations, 807 KAR 5:001, Section 7, related to the service and electronic filing of documents. 4. The Attorney General shall adhere to the procedural schedule set forth in the Commission's June 13, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that:
a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00146
|
6/19/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Natural Energy Utility Corporation
|
2018-00164
|
6/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Citipower on and after July 1, 2018. 3. Citipower shall submit all invoices received from Citigas and Citizens Gas as part of all future GCR filings. 4. Within 20 days of the date of entry of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to
this Order.
|
2018-00174
|
6/19/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.04 per 1,000 gallons is approved. 2. The rates proposed by North Shelby are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by North Shelby on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, North Shelby shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00175
|
6/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Valley Gas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after July 1, 2018. Although Valley Gas's GCR rate filing did not provide 30 days' notice to the Commission as required by its tariff, KRS 278.180(2) authorizes the Commission to make a reduction in rates effective in less than 30 days. 3. Within 20 days of the date of entry of this Order, Valley Gas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00177
|
6/19/2018
|
20180619_PSC_ORDER.pdf
|
2017-00179
|
6/19/2018
|
20180619_PSC_ORDER01.pdf
|
2017-00179
|
6/20/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.05 per 1,000 gallons is approved. 2. The rates proposed by West Shelby are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by West Shelby on and after July 15, 2018. 4. Within 20 days of the date of entry of this Order, West Shelby shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00185
|
6/20/2018
|
20180620_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
6/20/2018
|
20180620_PSC_ORDER.pdf
|
2017-00417
|
6/21/2018
|
PSC_ORDER
Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. KIUC shall adhere to the procedural schedule set forth in the Commission's June 13, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00146
|
6/21/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.07 per 1,000 gallons is approved. 2. The rates proposed by Northeast Woodford District are denied. 3. The rates set forth in Appendix B to this Order are approved for water service rendered by Northeast Woodford District on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Northeast Woodford District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00190
|
6/21/2018
|
20180621_PSC_ORDER.pdf
|
2018-00162
|
6/21/2018
|
20180621_DATA_REQUEST.pdf
Data Request
|
2017-00417
|
6/21/2018
|
20180621_DATA_REQUEST01.pdf
Data Request
|
2017-00417
|
6/22/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Big Rivers Electric Corporation
|
2017-00384
|
6/22/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct the proposed wireless telecommunications facility. The proposed facility consists of a tower not to exceed 370 feet in height, with attached antennas, to be located at 410 Fortner Ridge Road, Owenton,
Owen County, Kentucky. The coordinates for the proposed facility are North Latitude 38°33'01.25" by West Longitude 84°42'55.36".
2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00031
|
6/22/2018
|
DATA_REQUEST
Commission Staff's Post Hearing Request for Information to Sentra Corporation and Blue Ridge Mountain Resources Inc. and Sentra Resources LLC
|
2018-00107
|
6/22/2018
|
PSC_ORDER
Final Order Entered: 1. Taylor County is authorized to borrow from CoBank $6,000,000 to pay off the CoBank and CFC short-term notes proposed to be refinanced as identified in the application. Additionally, Taylor County may borrow the amount to pay the accrued interest charges on the outstanding lines of credit, and reasonable attorney fees and closing costs estimated at approximately $61,000. The loan maturity date and interest rate shall be in accordance with the CoBank refinancing program as described in Taylor County's application.
2. Taylor County shall execute the CoBank loan documents as authorized herein. 3. Taylor County shall comply with all matters set out in finding paragraphs 3 through 6 as if they were individually so ordered. 4. Any documents fi led in the future pursuant to finding paragraphs 3 and 4 shall reference this case number and shall be retained in the utility's general correspondence file. 5. Nothing contained herein shall be deemed a warranty or finding of value of securities or financing authorized herein on the part of the Commonwealth of Kentucky or any agency thereof.
|
2018-00130
|
6/22/2018
|
20180622_PSC_ORDER.pdf
|
2018-00044
|
6/25/2018
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00115
|
6/25/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Big Rivers Electric Corporation
|
2018-00146
|
6/25/2018
|
PSC_ORDER
Final Order Entered: 1 . The rates set forth in the Appendix to this Order are approved for service rendered on and after July 4, 2018.
2. Within 20 days of the date of entry of this Order, Millennium shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00176
|
6/27/2018
|
PSC_ORDER
Order Entered: IBEW's motion to intervene is denied.
|
2018-00146
|
6/27/2018
|
20180627_PSC_ORDER.pdf
|
2018-00153
|
6/28/2018
|
20180628_PSC_ORDER.pdf
Order Entered: 1. A hearing in this matter shall be held on Tuesday, August 7, 2018, at 9:00 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Martin County Water District ("Martin D
|
2018-00017
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2018-00035
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2017-00179
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2018-00052
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2018-00051
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2018-00029
|
6/28/2018
|
20180628_PSC_ORDER.pdf
|
2018-00038
|
6/29/2018
|
20180629_DATA_REQUEST.pdf
Commission Staff's Fifth Request for Information to Kentucky Frontier Gas, LLC
|
2017-00263
|
6/29/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on a tract of land near 1739 Raven Rock, Jenkins, Letcher County, Kentucky. The coordinates for the proposed facility are 37°10'15.6701" North latitude, 82°36'53.3858" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2018-00136
|
6/29/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.05 per 1,000 gallons is approved. 2. The rates proposed by North Nelson are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by North Nelson on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, North Nelson shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00183
|
6/29/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.12 per 1,000 gallons is approved. 2. The rates proposed by Levee Road are approved. 3. The rates set forth in Appendix B to this Order are approved for water service rendered by Levee Road on and after July 1, 2018. 4. In the future, Levee Road shall properly report water loss in its Annual Report that is in conformance with the Commission's water loss reporting requirements. 5. Within 20 days of the date of entry of this Order, Levee Road shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00184
|
6/29/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.09 per 1,000 gallons is approved. 2. The rates proposed by Judy are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Judy on and after July 1, 2018.
4. Within 20 days of the date of entry of this Order, Judy shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00186
|
6/29/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.12 per 1,000 gallons is approved. 2. The rates proposed by Montgomery County are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Montgomery County on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Montgomery County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00200
|
6/29/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is initiated to determine the reasonableness of Jetta's proposed tariff that establishes initial rates, rules, and regulations to operate a farm tap system. 2. Requests for intervention shall be filed no later than July 15, 2018. Any party who submits a motion to intervene after July 15, 2018, and upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule, if any.
|
2018-00212
|
6/29/2018
|
20180629_DATA_REQUEST.pdf
Data Request
|
2017-00349
|
6/29/2018
|
20180629_PSC_ORDER.pdf
|
2017-00343
|
6/29/2018
|
20180629_PSC_ORDER01.pdf
|
2017-00343
|
7/2/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Tillman Infrastructure LLC and New Cingular Wireless PCS, LL d/b/a AT&T Mobility
|
2017-00435
|
7/2/2018
|
PSC_ORDER
Order Entered: 1. Mr. Norman's Request to Intervene is denied.
|
2017-00435
|
7/3/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Inter-County Energy Cooperative Corporation
|
2018-00129
|
7/3/2018
|
PSC_ORDER
Order Entered: 1. Mountain District's proposed tariff revisions are suspended for five months, from July 9, 2018, to December 8, 2018.
2. Requests for intervention shall be filed no later than July 20, 2018. Any party who submits a motion to intervene after July 20, 2018, and upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule, if any.
|
2018-00227
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on a tract of land near the junction of J . Logan Road and Highway 11 in Barbourville, Knox County, Kentucky. The coordinates for the proposed facility are 36°48'29.4639" North latitude, 83°56'46.7567" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if,
after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. The Applicant shall file a copy of the final decision regarding the pending KAZC application for the proposed construction within 10 days of receiving the decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00125
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a 180-foot self-supporting telecommunications tower with attached antenna and is to be located on a tract of land near 1089 Venters Lane, Isom, Letcher County, Kentucky. The coordinates for the proposed facility are 37°12'21.6718" North latitude, 82°54'32.3711" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00131
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located near the intersection of CR-1366 and CR-1325, Knox County, Kentucky. The coordinates for the proposed facility are North Latitude 36°56'51.5234" by West Longitude 83°57'45.0285."
2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00140
|
7/5/2018
|
20180705_PSC_ORDER.pdf
Order Entered: LG&E is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days from the date of entry of this Order.
|
2018-00181
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.23 per 1,000 gallons is approved. 2. The rates proposed by Kirksville are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Kirksville on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Kirksville shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00191
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.16 per 1,000 gallons is approved. 2. The rates proposed by Jessamine District are approved. 3. The rates set forth in Appendix B to this Order are approved for water service rendered by Jessamine District on and after July 10, 2018. 4. Within 20 days of the date of entry of this Order, Jessamine District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00193
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.10 per 1,000 gallons is approved. 2. The rates proposed by Garrard County are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Garrard County on and after August 10, 2018. 4. Within 20 days of the date of entry of this Order, Garrard County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00202
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order are approved for final meter readings on and after July 25, 2018. 2. Delta shall file responses to the requests for information in Appendix B with its GCA application for rates effective with the November 2018 billing cycle. 3. Within 20 days of the date of entry of this Order, Delta shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Delta's future GCA applications shall include the information required in finding paragraph 8. 5. This case is closed and removed from the Commission's docket.
|
2018-00213
|
7/5/2018
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky is granted a CPCN that authorizes it to bid on a franchise offered by the city of Fort Mitchell, Kentucky, for electric and natural gas transmission and distribution service. 2. If Duke Kentucky is not the successful bidder, Duke Kentucky shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Duke Kentucky was not the successful bidder. 3. If Duke Kentucky is the successful bidder, Duke Kentucky shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial
franchise fee. 4. If Duke Kentucky is the successful bidder, Duke Kentucky shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city. 7. This case is closed and removed from the Commission's docket.
|
2018-00231
|
7/5/2018
|
20180705_PSC_ORDER.pdf
|
2018-00197
|
7/6/2018
|
20180706_DATA_REQUEST.pdf
Commission Staff's First Request for Information to Martin County Water District
|
2018-00017
|
7/6/2018
|
20180706_PSC_ORDER.pdf
|
2018-00072
|
7/6/2018
|
20180706_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00042
|
7/9/2018
|
PSC_ORDER
Final Order Entered: 1. Cumberland Valley's request for a CPCN to purchase and install an AMI system as described in its application is approved. 2. Cumberland Valley's request to deviate from the meter testing requirements of 807 KAR 5:041 , Section 15(3) is granted in part and denied in part. 3. Cumberland Valley's request for relief from periodic testing of meters pursuant to 807 KAR 5:041 , Section 15(3), is granted.
4. Cumberland Valley shall resume periodic testing of meters pursuant to 807 KAR 5:041, Section 15(3) in January 2021, or upon completion of the deployment of the proposed AMI system, whichever occurs earlier. 5. Cumberland Valley's request for relief from the requirement to test meters upon removal from service pursuant to 807 KAR 5:041 , Section 15(3), is denied. 6. Cumberland Valley shall ensure that all meters removed from service as a result of this project shall be tested in accordance with 807 KAR 5:041, Section 17. Any meter determined to register inaccurate readings shall be handled in accordance with 807 KAR 5:041, Section 17. The meter test results for all meters tested as part of this project shall be reported to the Commission on Cumberland Valley's Quarterly Meter Report and shall include a full explanation of any billing adjustments resulting from the tests. 7. Cumberland Valley shall depreciate the new AMI system over a 15-year period.
|
2018-00056
|
7/9/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located at 277 Lawson Midway Road, Middlesboro, Bell County, Kentucky. The coordinates for the proposed facility are North Latitude 36°39'19.4092" by West Longitude 83°41 '31.9711 ". 2. Appalachian Wireless shall file a copy of the final decision regarding its pending FAA and KAZC applications for the proposed construction within ten days of
receiving the decision. 3. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00113
|
7/9/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.18 per 100 cubic feet is approved. 2. The rates proposed by Madison District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Madison District on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Madison District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00192
|
7/9/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is established to review the reasonableness of the proposed rates of Fountain Run District #1. 2. No later than October 2, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding Fountain Run District #1 's requested rate adjustment. 3. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 4. If Commission Staff finds that the financial condition of Fountain Run District #1 supports a higher rate than Fountain Run District #1 proposes, or the assessment of an additional rate or charge not proposed in Fountain Run District #1 's Application, Fountain Run District #1 in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge.
|
2018-00205
|
7/9/2018
|
20180709_PSC_ORDER.pdf
|
2017-00483
|
7/9/2018
|
20180709_PSC_ORDER.pdf
|
2017-00316
|
7/10/2018
|
PSC_ORDER
Order Entered: 1. BREC's motion to amend the procedural schedule is granted. 2. The current procedural schedule as established by the June 13, 2018 Order is amended to the limited extent as follows: a. BREC shall file rebuttal testimony no later than August 31, 2018. b. Requests for information on BREC's rebuttal testimony shall be filed no later than September 10, 2018. c. BREC's responses to requests for information on its rebuttal testimony shall be filed no later than September 17, 2018. d. BREC or any Intervenor shall request either a hearing or that the case be submitted for decision based on the record no later than September 21, 2018. 3. All other provisions of the June 13, 2018 Order shall remain in full force and effect.
|
2018-00146
|
7/10/2018
|
PSC_ORDER
LG&E is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days from the date of entry of this Order.
|
2018-00172
|
7/10/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.38 per 1 ,000 gallons is approved. 2. The rates proposed by Dexter-Almo Heights District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Dexter-Almo District on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Dexter-Almo Heights District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00199
|
7/10/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.18 per 1,000 gallons is approved. 2. The rates proposed by East Clark District are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by East Clark District on and after July 20, 2018. 4. Within 20 days of the date of entry of this Order, East Clark District shall file with the Commission , using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00204
|
7/11/2018
|
PSC_ORDER
Order Entered: 1. KIUC's motion to compel discovery, schedule an informal conference, and stay the procedural schedule is held in abeyance.
2. A hearing for receiving oral arguments on the pending motion shall be heard on Wednesday, July 25, 2018, at 1 :00 p.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 3. Memorandum Briefs shall be filed by KIUC and Big Rivers on or before Friday, July 20, 2018.
|
2018-00146
|
7/12/2018
|
PSC_ORDER
Final Order Entered: 1. BREC is granted a CPCN to construct and operate the proposed transmission line as set forth in its application. 2. BREC shall file a survey of the final location of the line after any modifications are finalized as authorized herein and before construction begins. 3. BREC shall file "as-built" drawings or maps within 60 days of the completion of the construction authorized by this Order. 4. BREC request to enter into the APA for the purchase of the Kentucky Portion of the 2015 MTEP Project is granted. 5. BREC shall immediately notify the Commission upon knowledge of any material changes to the scope of the Kentucky portion of the 2015 MTEP Project, including, but not limited to, increase in cost, any significant delays in the construction of the transmission line, or any changes in the route of the transmission line. 6. The Attorney General's request for leave to file a notice regarding the submission of this matter for a decision without the need for a hearing is granted. 7. Any documents filed pursuant to ordering paragraph No. 3 and 5 of this Order shall reference the case number of this matter and shall be retained in the utility's general correspondence files.
|
2018-00004
|
7/12/2018
|
PSC_ORDER
Final Order Entered: 1. The proposed transfer and acquisition of Sentra by Sentra Resources as set forth in the application is approved. 2. The request for approval of the Acquisition Note and Line of Credit is denied in part and granted in part. 3. Approval of the Acquisition Note is denied. 4. Approval of the Letter of Credit is granted, subject to the modification set forth herein. 5. Within five days of the consummation of the approved acquisition, Sentra shall file written notice setting forth the date that the acquisition was completed. 6. Within seven days of the completion of the approved acquisition, Sentra shall file a copy of the First Amendment to the Stock Purchase Agreement. 7. Within 30 days of the completion of the approved acquisition, Sentra shall file a cost allocation manual. 8. Within ten days of the completion of the approved acquisition, Sentra shall
file proof of liability insurance. 9. Within 60 days of the completion of the approved acquisition, Sentra shall file an evaluation of possible gas suppliers. 10. Within 30 days of the completion of the approved acquisition, Sentra shall file a schedule outlining the dates it intends to file Purchased Gas Adjustment applications in conformity with Sentra's Purchased Gas Cost Adjustment tariff. 11. Within 60 days of the completion of the approved acquisition, Sentra shall comply with 49 CFR 191.22 and 192.805.
|
2018-00107
|
7/12/2018
|
PSC_ORDER
Order Entered: BREC's Motion for Deviation from 807 KAR 5:001 , Section 13(2)(a)(3), is granted.
|
2018-00146
|
7/12/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.12 per 1,000 gallons is approved. 2. The rates proposed by Reid Village District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Reid Village District on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, Reid Village District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00201
|
7/12/2018
|
20180712_PSC_ORDER.pdf
|
2017-00417
|
7/13/2018
|
PSC_ORDER
Order Entered: KIUC's motion for clarification of the Commission's July 11, 2018 Order is granted to the extent as stated herein.
|
2018-00146
|
7/16/2018
|
PSC_ORDER
Final Order Entered: Grayson RECC's request for a CPCN to purchase and install an AMI system as described in its application is approved.
|
2017-00419
|
7/16/2018
|
PSC_ORDER
Order Entered: 1. Atmos's petition for confidential protection for the information concerning the actual price being paid by Atmos for natural gas to its supplier, and the WAGOG schedule pertaining to prices projected to be paid by Atmos for purchase contracts is granted. 2. The designated material contained in Atmos's Exhibit D, page 5 of 6, and the WACOG schedule in support of Exhibit C, page 2 of 2, shall not be placed in the public record or made available for public inspection until further Order of this Commission. 3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Atmos shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, Atmos shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Atmos is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection.
|
2017-00478
|
7/16/2018
|
STAFF_REPORT01
Notice of Filing of Staff Report
|
2018-00117
|
7/16/2018
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2018-00118
|
7/16/2018
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to Big Rivers Electric Corporation
|
2018-00146
|
7/16/2018
|
PSC_ORDER
Final Order Entered: 1. Western Pulaski District is granted a CPCN for the proposed project as submitted. 2. Western Pulaski District's proposed plan of financing is approved. 3. Western Pulaski District is authorized to issue $2,225,000 of Western Pulaski County Water District Waterworks Revenue Bonds at an interest rate to be equal to the lower of the rate in effect at the time of loan approval or the interest rate in effect at the time of closing, not to exceed 2.5 percent. 4. The proceeds from the promissory note shall be used only for the purposes specified in Western Pulaski District's application. 5. Western Pulaski District shall obtain approval from the Commission prior to
performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Western Pulaski District may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Western Pulaski District rates for service. Western Pulaski District shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4.
|
2018-00203
|
7/16/2018
|
20180716_PSC_ORDER.pdf
|
2017-00457
|
7/16/2018
|
20180716_PSC_ORDER.pdf
|
2018-00195
|
7/17/2018
|
PSC_ORDER
Order Entered: 1. This case is reopened for the limited purpose of addressing Morgan District's letter and proposed tariff requesting to increase its water service rates. 2. Morgan District's letter and proposed tariff requesting to increase its water service rates are rejected due to filing deficiencies. 3. Morgan District may file an application for a rate adjustment pursuant to 807 KAR 5:076. 4. This case is now closed and removed from the Commission's docket.
|
2016-00068
|
7/17/2018
|
PSC_ORDER
Order Entered: 1. Airview shall file its responses to the Interim Order within 30 days of the date of this Order. 2. Supplemental requests for information to Airview shall be filed no later than August 30, 2018. 3. Airview shall file its responses to supplemental requests for information no later than September 13, 2018.
|
2016-00207
|
7/17/2018
|
PSC_ORDER
Order Entered: 1. Tillman's and AT&T Mobility's joint motion for an extension of time to file their responses to Staff's First Request is granted.
2. Tillman and AT&T Mobility shall file their responses to Staff's First Request no later than August 1, 2018. 3. Tillman's and AT&T Mobility's joint motion for confidential treatment for their untiled responses to Staff's First Request is denied.
|
2017-00435
|
7/17/2018
|
20180717_PSC_ORDER.pdf
Order Entered: CMN's Motion for Informal Conference is hereby granted.
|
2018-00157
|
7/17/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.34 per 1,000 gallons is approved. 2. The rates proposed by South 641 District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by South 641 District on and after July 1, 2018. 4. Within 20 days of the date of entry of this Order, South 641 District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00225
|
7/17/2018
|
PSC_ORDER
Order Entered: 1. Pursuant to 807 KAR 5:006, Section 17(2), the Commission approves the following third parties to test the accuracy of meters on behalf of a utility that furnishes metered electric, gas or water service: a. A third party previously approved by the Commission to perform meter testing on behalf of an electric, gas or water utility. b. The original manufacturer of a meter. c. A third party that is certified by a nationally recognized registrar to a metrology laboratory standard, such as ISO 17025. d. A third party that uses a Commission-approved basic measurement standard and follows written procedures that are consistent with industry recognized and generally accepted practices for meter testing and calibration. 2. A utility that utilizes a third party to perform meter testing required by Commission regulations shall maintain current documentation of the qualifications and the calibration methods and procedures of the third party, including documentation of the
basic measurement standards utilized by the third party. 3. Pursuant to 807 KAR 5:006, Section 17(3), the Commission approves the
calibration of a basic measurement standard that is NIST-certified or traceable to a NIST certified SRM. Each standard approved hereby must be accompanied by a signed certificate that shows an unbroken chain of comparisons to stated references. Each certificate shall also include an expiration date after which the standard must be tested and, if necessary, recalibrated.
|
2018-00226
|
7/17/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless's petition regarding the Pooling Administrator's denial of its application for assignment of additional numbering resources is granted. 2. The decision of the Pooling Administrator denying Appalachian Wireless's request for the assignment of a new thousand-number block for the Allen rate center in Kentucky is overturned. 3. The Pooling Administrator shall assign Appalachian Wireless a single thousand-number block for the Allen rate center. 4. The numbering resources referenced in this Order are to be assigned for the sole use of Appalachian Wireless's customers. If the numbering resources requested by Appalachian Wireless are no longer required to meet the service, the associated numbering resources approved in this Order shall be returned to the Pooling
Administrator.
|
2018-00234
|
7/17/2018
|
20180717_PSC_ORDER.pdf
|
2018-00153
|
7/17/2018
|
20180717_PSC_ORDER.pdf
|
2017-00316
|
7/17/2018
|
20180717_PSC_ORDER.pdf
|
2018-00156
|
7/18/2018
|
20180718_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule established in the June 15, 2018 Order is amended as follows: a. Requests for information to all parties shall be served no later than July 23, 2018. b. Responses to requests for information shall still be filed no
|
2016-00142
|
7/18/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.15 per 1,000 gallons is approved. 2. The rates proposed by Breathitt District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Breathitt District on and after July 15, 2018. 4. Within 20 days of the date of entry of this Order, Breathitt District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00214
|
7/19/2018
|
20180719_DATA_REQUEST.pdf
Commission Staff's Sixth Request for Information to Martin County Water District
|
2016-00142
|
7/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville and set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after July 28, 2018. 2. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00224
|
7/19/2018
|
20180719_PSC_ORDER.pdf
|
2018-00208
|
7/19/2018
|
20180719_DATA_REQUEST.pdf
Data Request
|
2018-00072
|
7/19/2018
|
20180719_PSC_ORDER.pdf
|
2018-00051
|
7/20/2018
|
PSC_ORDER
Final Order Entered: 1. The proposed transfer of ownership and control of Edmonson pursuant to the terms of the agreement is approved, subject to the conditions set forth in ordering paragraphs 2 through 6, as of the date of this Order. 2. Edmonson shall notify the Commission in writing of the closing of the transaction with ten days of the closing. 3. If the transaction does not close within 90 days of the date of this Order, within 15 days, Edmonson shall file with the Commission a report on the status of the efforts to complete the transfer. 4. Any material revision to the proposed transaction shall be approved by the Commission in order for the amendment to be effective. 5. No later than September 1, 2018, Edmonson shall submit its Gross Report and an annual report for the calendar year ending December 31, 2017, and its Gross Report and an Annual Report for the period January 1, 2018, through the date of the transfer. 6. Any documents filed pursuant to ordering paragraphs 2, 3, and 5 shall reference this case number and shall be retained in Edmonson's general correspondence file.
7. The Executive Director is delegated authority to grant reasonable extensions of time for the filing of any documents required by this Order upon a showing of good cause for such an extension. 8. A copy of this order shall be served on the Edmonson County Fiscal Court.
9. This case is closed and removed from the Commission's docket.
|
2018-00127
|
7/20/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to West Shelby Water District
|
2018-00196
|
7/20/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Navitas and set forth in the Appendix to this Order is approved for service rendered by Navitas on and after August 1, 2018. 2. Within 20 days of the date of entry of this Order, Navitas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00228
|
7/20/2018
|
PSC_ORDER
Final Order Entered: 1. Atmos is granted a CPCN that authorizes it to bid on a franchise offered by the city of Springfield, Kentucky, for natural gas service. 2. If Atmos is not the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Atmos was not the successful bidder. 3. If Atmos is the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Atmos is the successful bidder, Atmos shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00246
|
7/20/2018
|
20180720_PSC_ORDER.pdf
|
2017-00179
|
7/20/2018
|
20180720_PSC_ORDER.pdf
|
2018-00052
|
7/20/2018
|
20180720_PSC_ORDER.pdf
|
2018-00230
|
7/23/2018
|
PSC_ORDER
Final Order Entered: 1. The amounts billed by EKPC through its environmental surcharge for the period July 1, 2017, to December31, 2017, are approved. 2. EKPC shall use a rate of return of 6.023 percent in all monthly environmental surcharge filings subsequent to the date of this Order. 3. EKPC's Member Cooperatives shall include the applicable monthly retail pass-through adjustments, shown in the Appendix to this Order, in the determination of each Member Cooperative's respective pass-through mechanism in each of the first six months following the date of this order, as discussed herein. 4. This case is closed and removed from the Commission's docket.
|
2018-00075
|
7/23/2018
|
20180723_DATA_REQUEST.pdf
Data Request
|
2017-00321
|
7/23/2018
|
20180723_DATA_REQUEST.pdf
Data Request
|
2018-00044
|
7/23/2018
|
20180723_PSC_ORDER.pdf
|
2018-00050
|
7/24/2018
|
PSC_ORDER
Final Order Entered: 1. EKPC's Application is approved, subject to the conditions set forth herein, to the extent it requested authority to issue up to $300 million in secured private placement debt. 2. EKPC's Application is denied as moot to the extent it requested authority to
issue any secured tax-exempt bonds or to enter into interest rate management agreements based on EKPC's withdrawal of its request for such authority. 3. EKPC is authorized to issue up to $300 million in secured private placement debt in one or more transactions from the date of this Order through December 31, 2019. 4. The proceeds from the secured private placement debt authorized herein shall be used only for the lawful purposes set out in EKPC's Application. 5. EKPC shall agree only to such terms and conditions for the secured private placement debt that are consistent with those terms and conditions set out in EKPC's Application , including but not limited to the following terms and conditions: a. All secured private placement debt shall have a fixed interest rate; b. The interest rates on all secured private placement debts, including any fees and expenses associated with the offering of the private placement debt, shall not exceed 3.0 percent of the yield to maturity of United States Treasury Bonds of a comparable maturity at the time of issuance; and c. The maturity date on any secured private placement debt shall not exceed 30 years.
|
2018-00115
|
7/24/2018
|
PSC_ORDER
Order Entered: 1. The Request filed by Hardin District No. 1 is rejected for filing. 2. Within ten days of the date of this Order, Hardin District No. 1 shall have an attorney licensed to practice law in Kentucky file an application. Failure to have an attorney file an application in this case will result in dismissal without prejudice of the application and its removal from the Commission's docket without further Order.
|
2018-00166
|
7/24/2018
|
PSC_ORDER
Final Order Entered: 1 . The rates set forth in Appendix A to this Order are approved for final meter readings on and after August 1, 2018.
2. Atmos shall file responses to the requests for information in Appendix B along with its GCA application for rates effective with the November 2018 billing cycle. 3. Within 20 days of the date of the entry of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Atmos's future GCA applications shall include the information required in finding paragraph 8. 5. This case is closed and removed from the Commission's docket.
|
2018-00233
|
7/24/2018
|
20180724_PSC_ORDER.pdf
|
2018-00207
|
7/24/2018
|
20180724_PSC_ORDER.pdf
|
2018-00076
|
7/24/2018
|
20180724_PSC_ORDER.pdf
|
2018-00170
|
7/25/2018
|
DATA_REQUEST
Commission Staff's Fourth Request for Information to Cawood Water District
|
2018-00068
|
7/25/2018
|
DATA_REQUEST01
Commission Staff's First Request for Information to Black Mountain Utility District
|
2018-00068
|
7/25/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Mountain Water District
|
2018-00227
|
7/25/2018
|
20180725_PSC_ORDER.pdf
|
2018-00198
|
7/25/2018
|
20180725_PSC_ORDER.pdf
|
2017-00328
|
7/25/2018
|
20180725_PSC_ORDER.pdf
|
2017-00282
|
7/25/2018
|
20180725_PSC_ORDER.pdf
|
2018-00005
|
7/25/2018
|
20180725_PSC_ORDER.pdf
|
2017-00284
|
7/26/2018
|
PSC_ORDER
Order Entered: 1 . EKPC's motion for confidential protection for its responses to the requests for information contained in the Appendix to the Commission's Order dated August 30, 2017, is granted. 2. The materials requested to be held confidential shall not be placed in the public record or made available for public inspection for a ten-year period from the date of this Order, or until further Orders of this Commission.
3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001 , Section 13(9).
4. EKPC shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment.
5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection.
|
2017-00283
|
7/26/2018
|
PSC_ORDER
Order Entered: 1. BREC's petition for confidential protection for its responses to the requests for information contained in the Appendix to the Commission's Order dated August 30, 2017, is granted. 2. The materials requested to be held confidential shall not be placed in the public record or made available for public inspection for an indefinite period from the date of this Order, or until further Orders of this Commission.
3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. BREC shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, BREC shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If BREC is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection.
|
2017-00287
|
7/26/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Sentra is denied. 2. The rate set forth in Appendix A to this Order is approved for service
rendered on and after August 1, 2018. Although Sentra's GCR rate application did not provide 30 days' notice to the Commission as required by its tariff, KRS 278.180(2) authorizes the Commission to make a reduction in rates effective in less than 30 days. 3. Within 20 days of the date of entry of this Order, Sentra shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets
setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case shall remain open pending the Commission's final determination regarding the amount and treatment of the under recovery. 5. Sentra's Petition for correction is held in abeyance pending discovery regarding the under recovery. 6. Sentra shall fi le with the Commission, within 20 days of the date of this
Order, the original and three copies in paper medium of the information requested in Appendix B to this Order.
|
2018-00243
|
7/26/2018
|
20180726_PSC_ORDER.pdf
|
2017-00285
|
7/26/2018
|
20180726_DATA_REQUEST.pdf
Data Request
|
2018-00005
|
7/27/2018
|
20180727_DATA_REQUEST.pdf
Commission Staff's Sixth Request for Information to Kentucky Frontier Gas, LLC
|
2017-00263
|
7/27/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Kentucky-American Water Company
|
2018-00206
|
7/27/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final meter readings by Frontier on and after August 1, 2018. 3. Each customer's bill shall separately reflect the approved gas cost
reconciliation rate applicable to the customer's service area. 4. The changes to the calculation of the current and total AA, as discussed in
finding paragraph 9, are approved. 5. Within 20 days of the date of entry of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. The individual gas cost reconciliation rates for Frontier and the former Public system shall be included in the compliance tariffs.
|
2018-00232
|
7/30/2018
|
PSC_ORDER
Order Entered: 1. This proceeding is opened to investigate the reasonableness of Salt River Electric's proposal to discontinue its Residential Marketing Rate. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2018-00251
|
7/30/2018
|
20180730_PSC_ORDER.pdf
|
2018-00195
|
7/30/2018
|
20180730_PSC_ORDER.pdf
|
2018-00208
|
7/30/2018
|
20180730_PSC_ORDER.pdf
|
2018-00182
|
7/31/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Inter-County Energy Cooperative Corporation
|
2018-00129
|
7/31/2018
|
PSC_ORDER
Final Order Entered: this matter is hereby dismissed without prejudice.
|
2018-00173
|
7/31/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Jetta Operating Appalachia, LLC
|
2018-00212
|
7/31/2018
|
PSC_ORDER
Order Entered: 1. The proposed changes are approved, for service rendered on and after August 6, 2018, to BREC's tariffs DSM-01, High Efficiency Lighting Replacement Program; DSM-02, ENERGY STAR® Clothes Washer Replacement Incentive Program; DSM-03, ENERGY STAR® Refrigerator Replacement Incentive Program; DSM-06, Touchstone Energy® New Home Program; DSM-07, Residential and Commercial HVAC & Refrigeration Tune-Up Program; DSM-09, Commercial/Industrial General Energy Efficiency Program; DSM-13, Residential Weatherization A La Carte Program. 2. The proposed changes are approved, for service rendered on and after August 6, 2018, to Meade RECC's tariffs Schedule 26, High Efficiency Lighting Replacement Program; Schedule 27, Clothes Washer Replacement Incentive Program; Schedule 28, Refrigerator Replacement Program; Schedule 30, Residential Weatherization A La Carte Program; Schedule 31, Touchstone Energy® New Home Program; Schedule 32, Residential & Commercial HVAC & Refrigeration Tune Up
Program; and Schedule 34, Commercial/Industrial General Energy Efficiency Program.
|
2018-00236
|
7/31/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.12 per 1,000 gallons is approved. 2. The rates proposed by Peaks Mill District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Peaks Mill District on and after July 26, 2018. 4. Within 20 days of the date of entry of this Order, Peaks Mill District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00242
|
7/31/2018
|
20180731_PSC_ORDER.pdf
|
2017-00417
|
7/31/2018
|
20180731_PSC_ORDER.pdf
|
2018-00156
|
7/31/2018
|
20180731_PSC_ORDER.pdf
|
2017-00472
|
8/1/2018
|
20180801_PSC_ORDER.pdf
|
2018-00238
|
8/2/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.11 per 1,000 gallons is approved. 2. The rates proposed by Elkhorn District are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Elkhorn District on and after July 26, 2018. 4. Within 20 days of the date of entry of this Order, Elkhorn District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00241
|
8/2/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.14 per 1,000 gallons is approved. 2. The rates proposed by Farmdale District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Farmdale District on and after August 1, 2018. 4. Within 20 days of the date of entry of this Order, Farmdale District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. Within 30 days of the date of entry of this Order, Farmdale District shall file with the Commission Proof of Notice pursuant to 807 KAR 5:068, Section 5(3). 6. Any document filed pursuant to ordering paragraph 5 of this Order shall reference the number of this case and shall be retained in the post case correspondence
file. 7. This case is closed and removed from the Commission's docket.
|
2018-00249
|
8/2/2018
|
20180802_PSC_ORDER.pdf
|
2018-00230
|
8/3/2018
|
PSC_ORDER
Order Entered: 1. CMTA's request for an Order declaring that the provisions of KRS 278.010(3) are inapplicable to the Project being performed by CMTA for the Finance Cabinet is granted. 2. Based upon the information provided, the proposed Project shall not cause
the Finance Cabinet to be deemed a utility as defined in KRS 278.010(3)(b). 3. Further proceedings are required to address CMTA's request for an Order declaring that the provisions of KRS 278.495 and 49 CFR 191.3 are inapplicable to the Project being performed by CMTA for the Finance Cabinet.
|
2018-00180
|
8/3/2018
|
PSC_ORDER
Order Entered: 1. KRWA's Training Program scheduled to take place between August 27, 2018, through August 29, 2018, is hereby conditionally approved and accredited for six hours of annual water district management training for water district commissioners seeking to satisfy the training requirements set forth in KRS 74.020(6) and (7), provided that materials regarding the sessions are distributed to water district commissioners as discussed above, and water district commissioners seeking credit attend the three sessions offered as part of Concurrent Session C on August 28, 2018. 2. KRWA's Training Program may not be used by water district commissioners seeking to satisfy any portion of the initial training requirement for water district commissioners required by KRS 74.020(8). 3. KRWA shall retain a record of all water district commissioners attending the Training Program. 4. No later than 30 days after the scheduled training program, KRWA shall file
with the Commission: a. A sworn statement attesting that the accredited instruction was performed, including a statement that the materials regarding each session were distributed as required by the Commission herein; b. A description of any changes in the presenters or purposed
curriculum that occurred after the application; c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; and d. A copy of any written material
|
2018-00237
|
8/3/2018
|
PSC_ORDER
Order Entered: 1. Mr. Dawley's complaint is rejected for failing to conform to the requirements of 807 KAR 5:001, Section 20(1 )(c), and for failing to state a prima facie case. 2. Mr. Dawley's request for the assessment of civil penalties against Duke Kentucky for an alleged violation of 16 U.S.C. 2621 (d)(14) is denied. 3. Mr. Dawley shall have 20 days from the date of entry of this Order to file an amended complaint with the Commission that conforms to the requirements of 807 KAR 5:001, Section 20(1 ), and that states a prima facie case.
4. If an amended complaint is not filed within 20 days from the date of entry of this Order, the case shall be closed and removed from the Commission's docket without further order.
|
2018-00259
|
8/3/2018
|
20180803_DATA_REQUEST.pdf
Data Request
|
2018-00044
|
8/3/2018
|
20180803_PSC_ORDER.pdf
|
2018-00153
|
8/6/2018
|
PSC_ORDER
Order Entered: 1. The last sentence on page 4 is stricken and replaced with the following: The proposed private placement debt would have a fixed interest rate that will not exceed by more than 3.0 percent the yield to maturity of United States Treasury Bonds of comparable maturity at the time of issuance, including the effect of any fees and expenses associated with the offering of the private placement debt. 2. Ordering paragraph 5, subpart b, on page 7 is stricken and replaced with the following: b. The interest rates on all secured private placement debts, including any fees and expenses associated with the offering of the private placement debt, shall not exceed by more than 3.0 percent the yield to maturity of United States Treasury Bonds of comparable maturity at the time of issuance. 3. All provisions of the July 24, 2018 Order that are not in conflict with this Order shall remain in full force and effect.
|
2018-00115
|
8/6/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 180 feet in height, with attached antennas, to be located at 3569 Paint Creek Road, Stanton, Powell County, Kentucky. The coordinates for the proposed facility are North Latitude 37°53'07.48" by West Longitude 83°52'26.20". 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00210
|
8/6/2018
|
PSC_ORDER
Order Entered: 1. Atmos's petition for confidential protection for GCA Exhibit C, page 2, and Exhibit D, page 5, is granted. 2. The designated materials in GCA Exhibit C, page 2, and Exhibit D, page 5, shall not be placed in the public record or made available for public inspection for an
indefinite period of time, or until further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall comply with 807 KAR 5:001, Section 13(9). 4. Atmos shall inform the Commission if the materials in question become publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the materials granted confidential treatment by this Order, then Atmos shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Atmos is unable to make such demonstration , the designated materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the designated materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential protection in order to allow Atmos to seek a remedy afforded by law.
|
2018-00233
|
8/6/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.10 per 1,000 gallons is approved. 2. The rates proposed by U.S. 60 District are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by U.S. 60 District on and after July 26, 2018. 4. Within 20 days of the date of entry of this Order, U.S. 60 District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00245
|
8/6/2018
|
20180806_PSC_ORDER.pdf
|
2018-00148
|
8/6/2018
|
20180806_PSC_ORDER.pdf
|
2018-00239
|
8/6/2018
|
20180806_PSC_ORDER.pdf
|
2015-00283
|
8/6/2018
|
20180806_PSC_ORDER.pdf
|
2015-00264
|
8/6/2018
|
20180806_PSC_ORDER.pdf
|
2017-00179
|
8/7/2018
|
20180807_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. Service upon an attorney or upon a party by the parties in the case shall be made via hand delivery, pursuant to 807 KAR 5:001, Section 4(8)(d)1 , or el
|
2018-00157
|
8/7/2018
|
PSC_ORDER
Final Order Entered: 1. Skyway is granted a Certificate of CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 300 feet in height, with attached antenna and is to be located at Kentucky Highway 902 East, Fredonia, Kentucky 42411. The coordinates for the proposed facility are 37°13'32.74" North latitude, 88°02'32.09" West longitude. 2. Skyway shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Skyway shall file a copy of the final decision regarding the pending KAZC
application for the proposed construction within 10 days of receiving the decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00229
|
8/8/2018
|
20180808_PSC_ORDER.pdf
Order Entered: 1. Post hearing data requests shall be filed in the record on or before Friday, August 10, 2018. 2. Responses to post hearing data requests shall be filed in the record on or before Friday, August 17, 2018. 3. The parties have requested a br
|
2018-00017
|
8/8/2018
|
20180808_DATA_REQUEST.pdf
Data Request
|
2018-00156
|
8/9/2018
|
20180809_DATA_REQUEST.pdf
Commission Staff's Post Hearing Request for Information to Martin County Water District
|
2018-00017
|
8/9/2018
|
20180809_PSC_ORDER.pdf
|
2017-00316
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00216
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00217
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00218
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00219
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00220
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00221
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00222
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00223
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00257
|
8/10/2018
|
20180810_PSC_ORDER.pdf
|
2018-00258
|
8/13/2018
|
PSC_ORDER
Order Entered: 1. KIUC's Motion to Compel Discovery Responses is granted as it relates to Items 18-21, 24, and 26 of KIUC's First Set of Data Requests. 2. KIUC's Motion to Compel Discovery Responses is denied, as moot, with respect to Items 22, 23, 27, 28, and 29 of KIUC's First Set of Data Requests. 3. Within three days of the date of this Order, BREC shall file the responses to Items 18-21 , 24, and 26 of KIUC's First Set of Data Requests. 4. KIUC's request to direct BREC to amend the confidentiality agreement is denied as moot. 5. The amended procedural schedule set forth in the Appendix to this Order shall be followed in this case. 6. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2018-00146
|
8/13/2018
|
20180813_DATA_REQUEST.pdf
Commission Staff's First Request for Information to CMN-RUS, Inc.
|
2018-00157
|
8/13/2018
|
20180813_DATA_REQUEST01.pdf
Commission Staff's First Request for Information to Windstream Kentucky East, LLC
|
2018-00157
|
8/13/2018
|
PSC_ORDER
Order Entered: 1. Complainant shall have until August 27, 2018, in which to file her response to LG&E's motion to dismiss. 2. LG&E shall file its reply within five days of the filing of Complainant's response.
|
2018-00172
|
8/13/2018
|
20180813_PSC_ORDER.pdf
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed, with copies to all parties, and the original and five copies to the Commission. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. Each response shall include the name of the witness responsible for responding to the questions related to the information provided. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made o
|
2018-00181
|
8/13/2018
|
20180813_DATA_REQUEST.pdf
Data Request
|
2018-00208
|
8/13/2018
|
20180813_DATA_REQUEST.pdf
Data Request
|
2018-00072
|
8/13/2018
|
20180813_PSC_ORDER.pdf
|
2017-00328
|
8/14/2018
|
PSC_ORDER
Final Order Entered: this case is dismissed without prejudice and is removed from the Commission's docket.
|
2017-00452
|
8/14/2018
|
20180814_DATA_REQUEST.pdf
Data Request
|
2018-00198
|
8/15/2018
|
20180815_PSC_IC_NOTICE.pdf
Commission Staff's Notice of Informal Conference
|
2014-00267
|
8/15/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Mountain Water District
|
2018-00227
|
8/15/2018
|
PSC_ORDER
Order Entered: 1. KWRRl's Training Program scheduled to take place on August 16, 2018, and August 22, 2018, is hereby conditionally approved and accredited for up to 5.5 hours of annual water district management training for water district commissioners seeking to
satisfy the annual training requirements set forth in KRS 74.020(6) and (7). 2. KWRRl's Training Program scheduled to take place in or about September 2018 is hereby conditionally approved and accredited for up to 5.5 hours of annual water district management training for water district commissioners seeking to satisfy the annual training requirements set forth in KRS 74.020(6) and (7) provided there are no material
changes in the content of Training Program or the instructors for the program. 3. KWRRl's Training Program may not be used by water district commissioners seeking to satisfy any portion of the initial training required by KRS 74.020(8) for newly appointed water district commissioners. 4. KWRRI shall retain a record of all water district commissioners attending the Training Program. 5. No later than 30 days after each scheduled offering of the Training Program, KWRRI shall fi le with the Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or purposed curriculum that occurred after the application;
|
2018-00262
|
8/15/2018
|
PSC_ORDER
Final Order Entered: 1. Columbia Kentucky's payment of Staff's proposed penalty and completion of remedial measures required by Staff is accepted and resolves all alleged violations of KRS 278.495, 807 KAR 5:022, 807 KAR 5:027, or 49 CFR Part 192, as well as any
penalty that could be assessed under KRS 278.992(1 ), arising out of the August 6, 2017 incident. 2. The Commission's investigation of the August 6, 2017 incident is closed. 3. This case is closed and removed from the Commission's docket.
|
2018-00266
|
8/15/2018
|
20180815_PSC_ORDER.pdf
|
2018-00247
|
8/16/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Rivers Electric Corporation
|
2017-00384
|
8/16/2018
|
PSC_ORDER
Final Order Entered: 1 . The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates proposed by North Hopkins District are approved. 3. The rates set forth in the Appendix to this Order are approved for services rendered by North Hopkins District on and after the date of this Order. 4. Within 20 days of the date of this Order, North Hopkins District shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order.
|
2018-00118
|
8/16/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001 , Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00250
|
8/16/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $(0.70) per 1,000 gallons is approved. 2. The rates proposed by Marion District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Marion District on and after July 12, 2018. 4. Within 20 days of the date of entry of this Order, Marion District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2018-00254
|
8/17/2018
|
PSC_ORDER
Final Order Entered: 1. The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The rates proposed by Green-Taylor District are denied. 3. The rates set forth in the Appendix to this Order are approved for service rendered by Green-Taylor District on and after the date of this Order. 4. Within 60 days of the date of this Order, Green-Taylor District shall file with the Commission a report of the actions it will take to prevent customers being charged incorrect rates. 5. Within 90 days of the date of this Order, Green-Taylor District shall file with the Commission a report on what actions it will take to collect any uncollected revenue
due from the two commercial customers that were undercharged. 6. Within 20 days of the date of this Order, Green-Taylor District shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order. 7. Any document filed pursuant to ordering paragraphs 4 and 5 of this Order shall reference the number of this case and shall be retained in the post case correspondence file.
8. This case is closed and removed from the Commission's docket.
|
2018-00030
|
8/17/2018
|
PSC_ORDER
Order Entered: 1. BREC's motion to hold the matter in abeyance and for a status conference is granted. 2. The matter shall be held in abeyance for a period of 30 days from the date of this Order. 3. A formal status conference shall be held on Tuesday, October 2, 2018, at
1:00 p.m. Eastern Daylight Time in Hearing Room 1 of the Commission's offices, 211 Sower Boulevard, Frankfort, Kentucky.
|
2018-00146
|
8/17/2018
|
PSC_ORDER
Final Order Entered: 1 . LG&E's payment of Staff's proposed penalty and completion of remedial measures required by Staff is accepted and resolves all alleged violations of KRS 278.495, 807 KAR 5:022, 807 KAR 5:027, or 49 CFR Part 192, as well as any penalty that could be assessed under KRS 278.992(1), arising out of the August 21, 2017 incident. 2. The Commission's investigation of the August 21, 2017 incident is closed. 3. This case is closed and removed from the Commission's docket.
|
2018-00267
|
8/17/2018
|
PSC_ORDER
Final Order Entered: 1. Inter-County's payment of Staff's proposed penalty and completion of remedial measures required by Staff is accepted and resolves all alleged violations of KRS 278.042 or 807 KAR 5:041, as well as any penalty that could be assessed under
KRS 278.990(1), arising out of the March 8, 2018 incident. 2. The Commission's investigation of the March 8, 2018 incident is closed.
3. This case is closed and removed from the Commission's docket.
|
2018-00268
|
8/20/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to CMTA, Inc.
|
2018-00180
|
8/20/2018
|
20180820_PSC_ORDER.pdf
|
2018-00187
|
8/21/2018
|
20180821_PSC_ORDER.pdf
Order Entered: 1. No later than August 22, 2018, Martin District shall file with the Commission and serve upon all parties of record its Witness and Exhibit List, its responses to Commission Staff's Post-Hearing Request for Information and to MCCC's Post-H
|
2018-00017
|
8/21/2018
|
PSC_ORDER
Final Order Entered: 1. Whitley District is authorized to borrow from KACFC up to $2,715,000, but no more than the total amount needed to pay off the RD indebtedness proposed to be refinanced as identified in the application on the condition that the final NPV of the
savings, determined upon closing, generate a positive cash flow. The loan maturity date and interest rate shall be in accordance with the KACFC refinancing program as described in Whitley's application. 2. Whitley District shall execute the KACFC loan documents as authorized
herein. 3. Whitley District shall comply with all matters set out in finding paragraphs 3 through 6 as if they were individually so ordered.
4. Any documents filed in the future pursuant to finding paragraphs 3 and 4 shall reference this case number and shall be retained in the utility's general correspondence file.
|
2018-00211
|
8/21/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Salt River Electric Cooperative Corporation
|
2018-00251
|
8/21/2018
|
PSC_DATA_REQUEST
Commission Staff's First Request for Information to Cumberland Valley Electric, Inc.
|
2018-00256
|
8/21/2018
|
PSC_ORDER
Order Entered: KU is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days from the date of entry of this Order.
|
2018-00273
|
8/21/2018
|
20180821_PSC_ORDER.pdf
|
2017-00349
|
8/21/2018
|
20180821_PSC_ORDER.pdf
|
2018-00240
|
8/21/2018
|
20180821_PSC_ORDER.pdf
|
2018-00086
|
8/22/2018
|
PSC_ORDER
Order Entered nunc pro tunc, that: 1. The Commission's Order entered July 18, 2018, is amended to the limited extent that Appendix B attached thereto lists the Leak Adjustment Rate and Wholesale Rates to be applied for water service rendered by Breathitt District on and after July 15, 2018. 2. A copy of Appendix B as amended to include the Leak Adjustment Rate and Wholesale Rates is appended to this Order. 3. All other provisions of the Order entered on July 18, 2018, remain in full force and effect.
|
2018-00214
|
8/22/2018
|
20180822_PSC_ORDER.pdf
|
2018-00252
|
8/22/2018
|
20180822_PSC_ORDER.pdf
|
2018-00153
|
8/23/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Black Mountain Utility District
|
2018-00068
|
8/23/2018
|
DATA_REQUEST01
Commission Staff's Fifth Request for Information to Cawood Water District
|
2018-00068
|
8/23/2018
|
PSC_ORDER
Final Order Entered: 1. Kentucky-American is granted a CPCN to proceed with the proposed construction as set forth in its application.
2. Kentucky-American shall notify the Commission prior to performing any additional construction not expressly authorized by this Order.
3. Any deviation from the construction and repairs approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Kentucky-American shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance
with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project.
5. Kentucky-American shall submit an application to the Commission prior to issuing any securities that require approval pursuant to KRS 278.300. 6. Kentucky-American shall file with the Commission documentation of the total costs of this project, including the cost of construction and repairs and all other capitalized costs, (e.g., engineering, legal, administrative) within 60 days of the date that construction authorized under this CPCN is substantially completed. Construction and repair costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission.
|
2018-00206
|
8/23/2018
|
20180823_PSC_ORDER.pdf
|
2018-00253
|
8/23/2018
|
20180823_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00278
|
8/24/2018
|
20180824_DATA_REQUEST.pdf
Data Request
|
2018-00261
|
8/27/2018
|
20180827_DATA_REQUEST01.pdf
Commission Staff's First Request for Information to Sanctuary Church
|
2018-00181
|
8/27/2018
|
20180827_DATA_REQUEST.pdf
Commission Staff's First Request for Information to Louisville Gas and Electric Company
|
2018-00181
|
8/27/2018
|
20180827_PSC_ORDER.pdf
|
2018-00278
|
8/27/2018
|
20180827_PSC_ORDER.pdf
|
2018-00038
|
8/28/2018
|
20180828_PSC_ORDER.pdf
Order Entered: the record of Case No. 2018-00017 is incorporated by reference into the record of this case.
|
2016-00142
|
8/28/2018
|
PSC_ORDER
Order Entered: 1. Inter-County Energy's motion for a deviation is granted in part and denied in part as discussed in detail above. 2. Inter-County Energy's application is accepted for filing as of July 27, 2018. 3. The proposed rates are suspended up to and including January 25, 2019. 4. All requests for intervention shall be filed no later than September 7, 2018. 5. The Commission's June 13, 2018 Order in this matter, including the procedural schedule, shall remain in full force and effect to the extent that it does not conflict with this Order.
|
2018-00129
|
8/28/2018
|
20180828_PSC_ORDER.pdf
|
2017-00316
|
8/28/2018
|
20180828_PSC_ORDER.pdf
|
2018-00208
|
8/29/2018
|
PSC_ORDER
Order Entered: 1. BREC's request for a declaration finding that Station Two is no longer economically viable and confirming the termination of the Station Two Contracts, except for the Joint Facilities Agreement, is granted. 2. BREC's request to continue operation of Station Two under the terms of the Station Two Contracts for a period up to May 31, 2019, unless BREC and the city of Henderson reach a mutually acceptable agreement regarding the ongoing operation of Station Two prior to May 31, 2019, or the Commission directs BREC to cease operation of Station Two prior to May 31, 2019, is granted. 3. The Commission will reserve ruling on BREC's request for authorization to establish a regulatory asset until a later date.
|
2018-00146
|
8/29/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Big Rivers Electric Corporation
|
2018-00236
|
8/30/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Airview Utilities, LLC
|
2016-00207
|
8/30/2018
|
DATA_REQUEST01
Commission Staff's Third Request for Information to the City of Elizabethtown
|
2016-00207
|
8/30/2018
|
PSC_ORDER
Final Order Entered: 1. Whitley County District's motion to incorporate the record of Case No. 2017- 00068 is granted. 2. Whitley County District is granted a CPCN to proceed with the proposed construction as set forth in its application. 3. Whitely County District shall notify the Commission prior to performing any additional construction not expressly approved by this order. 4. Any deviation from the construction approved by this order shall be undertaken only with the prior approval of the Commission. 5. Whitley County District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 6. Whitley County District is authorized to enter into the proposed Assistance Agreement with KIA and, under the terms of the Assistance Agreement, to borrow from KIA an amount not to exceed $37,204.00 to be repaid over a 20-year period at an interest rate of 0.75 percent per annum with a loan servicing fee of 0.25 percent of the annual outstanding loan balance payable to KIA with each interest payment. 7. Within 30 days of executing its proposed Assistance Agreement with KIA, Whitley County District shall file with the Commission an executed copy of the Assistance Agreement.
|
2018-00235
|
8/30/2018
|
20180830_PSC_ORDER.pdf
|
2018-00005
|
8/30/2018
|
20180830_PSC_ORDER.pdf
|
2018-00043
|
8/30/2018
|
20180830_PSC_ORDER.pdf
|
2018-00208
|
8/30/2018
|
20180830_PSC_ORDER.pdf
|
2018-00042
|
8/31/2018
|
20180831_DATA_REQUEST.pdf
Commission Staff's Post-Hearing Request for Information to Martin County Water District
|
2016-00142
|
8/31/2018
|
PSC_ORDER
Order Entered: 1. Verizon Wireless's motion is granted. 2. Verizon Wireless shall have until April 6, 2019, to begin construction and
exercise its authority under the CPCN approved in this case on April 6, 2017. 3. This case is closed and removed from the Commission's docket.
|
2016-00390
|
8/31/2018
|
PSC_ORDER
Order Entered: 1. South 641 District must publish, in the newspaper with the largest circulation in the county, the notice of two vacancies on the South 641 District's Board of Commissioners attached as Appendix hereto and supply proof of publication to the Commission within five days of publication. 2. Within 20 days of the date of publication, any person who wishes to apply as a candidate to fill the vacancies on South 641 Water District's Board of Commissioners shall submit to the Commission in writing the candidate's name, address, and telephone
number. 3. The term of each commissioner appointed shall be four years pursuant to KRS 74.020, and the terms of current commissioners shall be extended to four years and staggered upon the filling of vacancies to be determined upon final order. 4. The Executive Director shall serve a copy of this Order upon the Calloway County Judge/Executive, the members of the Calloway County Fiscal Court, the Calloway
County Attorney, and the South 641 District's Board of Commissioners.
|
2017-00426
|
8/31/2018
|
PSC_ORDER
Final Order Entered: KWWOA's request for approval and accreditation for its training program scheduled to take place between April 9, 2018, and April 11 , 2018, is denied as moot based on KWWOA's withdrawal of its application.
|
2018-00083
|
8/31/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 199 feet in height, with attached antennas, to be located at 320 Wright Road, Beaver Dam, Kentucky. The coordinates for the proposed facility are North Latitude 37°28'36.26" by West Longitude 86°47'45.36". 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period
of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraphs 2 herein shall reference this case number and shall be retained in the post-case file. 4. This case is closed and removed from the Commission's docket.
|
2018-00154
|
8/31/2018
|
PSC_ORDER
Final Order Entered: 1 . The boundary changes agreed upon by KU and Clark Energy for the Olympic Steel, Vogelsang, and Setzer properties are approved.
2. A copy of the revised Territorial Map for the Mount Sterling Quadrangle and a detailed vicinity map, both with the revisions approved by KU and Clark Energy on
March 19, 2018, are attached as an Appendix to this Order. These maps reflect the agreed-upon amended territorial boundary and the written agreement of KU and Clark
Energy and shall be attached to the Commission's official territorial boundary map.
3. KU's request for deviation from the filing requirements of 807 KAR 5:001, Section 7(1), is approved.
|
2018-00194
|
8/31/2018
|
PSC_ORDER
Final Order Entered: 1. West Shelby District is granted a CPCN for the proposed project as submitted. 2. West Shelby District is authorized to use funds from its unrestricted cash reserves in the amount of $233,633.00. 3. These funds shall be used only for the purposes specified in West Shelby District's application. 4. West Shelby District shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 5. West Shelby District shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs, (e.g., engineering, legal, administrative, etc.) within 60 days of the date that construction is substantially completed. Construction costs shall be classified in appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. 6. West Shelby District shall file a copy of the "as-built" drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certified herein. 7. West Shelby District shall notify the Commission in writing one week prior to the actual start of construction and at the 50 percent completion point.
|
2018-00196
|
8/31/2018
|
PSC_ORDER
Final Order Entered: 1. KU/LG&E's request to publish an abbreviated customer notice for their upcoming rate applications as described herein is granted. In addition to the public awareness measures that KU/LG&E proposes in the instant application, KU/LG&E shall also post a copy of the full customer notice as required by 807 KAR 5:001, Section 17, in each public library located within KU and LG&E's respective service territories at the time the abbreviated customer notice is published, to remain posted throughout the entirety of the rate proceedings.
2. KU/LG&E's upcoming rate applications shall include the customer notice as a separate document labeled "Customer Notice of Rate Adjustment." 3. KU/LG&E's request to not provide six paper copies of the FERC and SEC documents that are required to be filed with their upcoming rate applications is denied as moot. As set forth in 807 KAR 5:001 , Section 8, KU/LG&E shall provide one copy of those
FERC and SEC documents either on paper medium or physical electronic storage media. 4. KU/LG&E's request to be relieved of the obligation to provide the Commission on physical electronic storage media any Excel spreadsheet that has been uploaded to the Commission via the Electronic Filing System and is available to the public for download through the Commission's website is denied. KU/LG&E shall file one copy on physical electronic storage media of any Excel spreadsheet filed by KU/LG&E in their upcoming rate cases.
|
2018-00250
|
8/31/2018
|
PSC_ORDER
Order Entered: 1. No later than November 14, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding North Mclean District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that North Mclean District's financial condition supports a higher rate than North Mclean District proposes or the assessment of an additional rate or charge not proposed in North Mclean District's Application, North Mclean District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in
which North Mclean District accounts for the depreciation of North Mclean District's assets, North Mclean District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require North Mclean District to implement the proposed change for accounting purposes.
|
2018-00260
|
8/31/2018
|
20180831_PSC_ORDER.pdf
|
2018-00209
|
8/31/2018
|
20180831_DATA_REQUEST.pdf
Data Request
|
2018-00156
|
8/31/2018
|
20180831_PSC_ORDER.pdf
|
2018-00287
|
9/4/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Jetta Operating Appalachia, LLC
|
2018-00212
|
9/4/2018
|
PSC_ORDER
Order Entered: 1. Duke Kentucky shall file responses to the requests for information attached as an Appendix to this Order within ten days of the date of entry of this Order. 2. a. Duke Kentucky shall file with the Commission the original and six copies of the information requested in the Appendix to this Order. b. Responses to requests for information shall be appropriately bound, tabbed, and indexed, and shall include the name of the witness responsible for responding to the questions related to the information provided, with a copy to all parties of record.
c. Each response shall be answered under oath or, for representatives of a public or private corporation or partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. d. Any party shall make timely amendment to any prior response if it obtains information that indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00259
|
9/4/2018
|
20180904_PSC_ORDER.pdf
|
2018-00181
|
9/5/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Grayson Rural Electric Cooperative Corporation
|
2018-00272
|
9/5/2018
|
PSC_ORDER
Final Order Entered: 1. Atmos is granted a CPCN that authorizes it to bid on a franchise offered by the city of Glasgow, Kentucky, for natural gas service. 2. If Atmos is not the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Atmos was not the successful bidder. 3. If Atmos is the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Atmos is the successful bidder, Atmos shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, fi le with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2018-00275
|
9/5/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.14 per 1,000 gallons is approved. 2. The rates proposed by South Woodford District are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by South Woodford District on and after August 1, 2018. 4. Within 20 days of the date of entry of this Order, South Woodford District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. This case is closed and removed from the Commission's docket.
|
2018-00277
|
9/5/2018
|
20180905_PSC_ORDER.pdf
|
2018-00269
|
9/6/2018
|
PSC_ORDER
Final Order Entered: 1. NEUC's Agreement is approved as filed. 2. Columbia Kentucky's Motion to Withdraw is granted.
|
2018-00164
|
9/6/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.04 per 1,000 gallons is approved. 2. The rates proposed by Northeast Woodford District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Northeast Woodford District on and after August 15, 2018. 4. Within 20 days of the date of entry of this Order, Northeast Woodford District
shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
5. Within 30 days of the date of entry of this Order, Northeast Woodford District shall fi le with the Commission Proof of Notice, pursuant to 807 KAR 5:068, Section 5(3). 6. Any document filed pursuant to ordering paragraphs 4 or 5 of this Order shall reference the case number and shall be retained in the post-case correspondence file. 7. This case is closed and removed from the Commission's docket.
|
2018-00265
|
9/6/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.02 per 1,000 gallons is approved. 2. The rates proposed by North Shelby are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by North Shelby on and after October 1, 2018. 4. Within 20 days of the date of entry of this Order, North Shelby shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. Any documents filed in the future pursuant to ordering paragraph 4 shall reference this case number and shall be retained in the post-case correspondence file. 6. This case is closed and removed from the Commission's docket.
|
2018-00279
|
9/6/2018
|
20180906_PSC_ORDER.pdf
|
2018-00017
|
9/6/2018
|
20180906_PSC_ORDER.pdf
|
2016-00142
|
9/7/2018
|
PSC_ORDER
Order Entered nunc pro tunc, that: 1. The Commission's Order entered August 17, 2018, is amended to the limited extent that the Appendix attached thereto lists the corrected 3/4-lnch Meter rate schedule for service rendered by Green-Taylor District on and after August 17, 2018.
2. All other provisions of the Order entered on August 17, 2018, remain in full force and effect.
|
2018-00030
|
9/7/2018
|
PSC_ORDER
Order Entered: The motion to intervene filed by Ms. Reynolds is denied.
|
2018-00095
|
9/7/2018
|
PSC_ORDER
Final Order Entered: 1. Northern Kentucky District's application for a deviation is denied as moot. 2. This case is closed and removed from the Commission's docket.
|
2018-00165
|
9/7/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 180 feet in height, with attached antennas, to be located at 543 Adventure Way, Putney, Harlan County, Kentucky. The coordinates for the proposed facility are North Latitude 36°54'36.42" by West Longitude 83°11 '50.37". 2. Appalachian Wireless shall file a copy of the final decision regarding its pending FAA and KAZC applications for the proposed construction within ten days of receiving the decision. 3. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 shall reference this case number and shall be retained in the post-case file.
5. This case is closed and removed from the Commission's docket.
|
2018-00255
|
9/7/2018
|
20180907_PSC_ORDER.pdf
Order Entered: Peoples Gas is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days of the date of service of the Order.
|
2018-00263
|
9/10/2018
|
PSC_ORDER
Final Order Entered: 1. With the exception of the change to the sewer division's Revenue Requirement, as explained above, the findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The water rates originally proposed by Ledbetter District are denied. 3. The water rates set forth in Appendix A to this Order are approved for water service on and after the date of this Order. 4. The sewer rates originally proposed by Ledbetter District are denied. 5. The sewer rates for Phase 1 in Appendix A to this order are approved for sewer service on and after the date of this Order. 6. The sewer rates for Phase 2 in Appendix A to this order are approved for sewer service one year after the date of this Order. 7. One week prior to the effective date of the Phase 2 sewer rates, Ledbetter District shall publish notice following the requirements of 807 KAR 5:075, Section 5. The customer notice shall be in the same format, as set forth in Appendix B to this Order, and shall contain only the rate comparison being implemented for the rate phase.
8. Within 45 days of publishing the notice required in ordering paragraph 7, Ledbetter District shall file proof of notice as required pursuant to 807 KAR 5:076, Section 5(3).
|
2018-00117
|
9/10/2018
|
PSC_ORDER
Final Order Entered: 1. Cumberland Valley is authorized to borrow from CoBank up to $2,024,000.00, but no more than the total amount needed to pay off the RUS notes proposed to be refinanced as identified in the application at an interest rate of 4.29 percent. The loan maturity date and interest rate shall be in accordance with the CoBank refinancing program as described in Cumberland Valley's application.
2. Cumberland Valley shall execute the CoBank loan documents as authorized herein. 3. Cumberland Valley shall comply with all matters set out in finding paragraphs 3 through 6 as if they were individually so ordered. 4. Any documents filed in the future pursuant to finding paragraphs 3 and 4 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is hereby closed and will be removed from the Commission's docket.
|
2018-00256
|
9/10/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.1200 per 1,000 gallons for residential customers and the purchased water adjustment factor of $0.1189 per 1,000 gallons for wholesale customers are approved. 2. The residential rates and the wholesale rates proposed by South Anderson District are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by South Anderson District on and after September 1, 2018. 4. Within 20 days of the date of entry of this Order, South Anderson District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. Within 30 days of the date of entry of this Order, South Anderson District shall file with the Commission Proof of Notice pursuant to 807 KAR 5:068, Section 5(3). 6. Any document filed, pursuant to ordering paragraph 5 of this Order, shall reference this case number and shall be retained in the post-case correspondence file. 7. This case is closed and removed from the Commission's docket.
|
2018-00274
|
9/10/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness who will be responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information, which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information that party shall provide a written explanation of the specific grounds for its failure to respond completely and precisely. e. Careful attention should be given to copied material to ensure that it is legible.
|
2018-00292
|
9/10/2018
|
20180910_DATA_REQUEST.pdf
Data Request
|
2018-00208
|
9/11/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Hardin County Water District No. 1
|
2018-00166
|
9/11/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $1.57 per 1,000 gallons is approved. 2. The rates proposed by Murray District No. 2 are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Murray District No. 2 on and after October 1, 2018. 4. Within 20 days of the date of entry of this Order, Murray District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. This case is closed and removed from the Commission's Docket.
|
2018-00271
|
9/11/2018
|
PSC_ORDER
Order Entered: Mr. Peyton shall file a response to KU's request that the complaint be dismissed within 14 days of the date of entry of this Order.
|
2018-00273
|
9/12/2018
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of entry of this Order, Sharpsburg District shall file a response to the Complaint of Sarah Helton and Jeffrey Collins. The response shall also include the information identified in the body of the order. 2. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that personal information cannot be read. 3. Documents of any kind filed with the Commission in the course of this proceeding shall also be served on all parties of record.
|
2018-00138
|
9/12/2018
|
PSC_ORDER
Order Entered: 1. No later than December 3, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings regarding Elkhorn District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider.
3. If Commission Staff finds that Elkhorn District's financial condition supports a higher rate than Elkhorn District proposes or the assessment of an additional rate or charge not proposed in Elkhorn District's Application, Elkhorn District, in its responses to the Commission Staff Report, shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or recommend an additional rate or charge. 4. If Commission Staff recommends changes in the manner in which Elkhorn District accounts for the depreciation of Elkhorn District's assets, Elkhorn District, in its response to the Commission Staff Report, shall also state its position in writing on whether the Commission should require Elkhorn District to implement the proposed change for accounting purposes.
|
2018-00145
|
9/12/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to South Anderson Water District
|
2018-00244
|
9/12/2018
|
20180912_PSC_ORDER.pdf
|
2018-00159
|
9/12/2018
|
20180912_PSC_ORDER.pdf
|
2018-00182
|
9/13/2018
|
PSC_ORDER
Final Order Entered: 1. Kentucky RSA #4 is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 250 feet in height, with attached antennas, to be located at 242 A. Cox Road, Elkhorn, Taylor
County, Kentucky. The coordinates for the proposed facility are North Latitude 37°18'55.56" by West Longitude 85°10'17.04." 2. Kentucky RSA #4 shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00092
|
9/13/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 300 feet in height, with attached antennas, to be located near 658 Harold Leforce Road, Williamsburg, Whitley County, Kentucky. The coordinates for the proposed facility are North Latitude 36°48'44.5299" by West Longitude 84°10'02.5765".
2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Appalachian Wireless shall file a copy of the final decision regarding the pending KAZC and FAA applications for the proposed construction within ten days of receiving a decision. 4. Any documents filed in the future pursuant to ordering paragraphs 2 and 3 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00095
|
9/13/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after October 1, 2018.
2. Within 20 days of the date of entry of this Order, Millennium shall file with this Commission , using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00289
|
9/13/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by B&H are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered on and after October 1, 2018. 3. Within 20 days of the date of this Order, B&H shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00300
|
9/13/2018
|
20180913_DATA_REQUEST.pdf
Data Request
|
2018-00281
|
9/13/2018
|
20180913_DATA_REQUEST.pdf
Data Request
|
2018-00291
|
9/13/2018
|
20180913_PSC_ORDER.pdf
|
2017-00427
|
9/14/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after October 1, 2018.
2. Within 20 days of the date of entry of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00293
|
9/14/2018
|
20180914_DATA_REQUEST.pdf
Data Request
|
2018-00198
|
9/17/2018
|
PSC_ORDER
Final Order Entered: 1. Jonathan Creek District is assessed a civil penalty of two thousand five hundred dollars ($2,500) for its willful failure to comply with KRS 278.300; however, $2,000 of the penalty is suspended under the condition that no further violation of KRS 278.300 is committed by Jonathan Creek District for a period of one year following the date of this Order. If no further violations of KRS 278.300 have occurred during the one year from the date of this Order, the suspended penalty of $2,000 will be forgiven. If a violation of KRS 278.300 occurs during the next one year from the date of this Order, the suspended penalty of $2,000 shall be immediately due and payable.
2. Jonathan Creek District shall pay the five hundred dollar ($500) unsuspended portion of the assessed civil penalty within 30 days of the date of this Order by cashier's check or money order payable to the Kentucky State Treasurer, and mailed or delivered to the Office of the General Counsel, Kentucky Public Service Commission, 211 Sower Boulevard, Post Office Box 615, Frankfort, Kentucky 40602.
3. Jonathan Creek District shall develop a written policy concerning the process to obtain prior loan authorization from the Commission that requires consultation with legal counsel, and have the policy adopted by the Board of Commissioners. Jonathan Creek District shall file the adopted written policy with the Commission within 60 days of the date of this Order.
|
2017-00469
|
9/17/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Black Mountain Utility District
|
2018-00068
|
9/17/2018
|
20180917_DATA_REQUEST.pdf
Commission Staff's Second Request for Information to CMN-RUS, Inc.
|
2018-00157
|
9/17/2018
|
20180917_DATA_REQUEST01.pdf
Commission Staff's Second Request for Information to Windstream Kentucky East, LLC
|
2018-00157
|
9/17/2018
|
PSC_ORDER
Final Order Entered: 1. Mr. Coleman's Complaint is denied. 2. Mr. Coleman's request for confidential treatment of Exhibit 1 to the Complaint is granted in part and denied in part. 3. Mr. Coleman's request for confidential treatment of signer's telephone numbers contained in Exhibit 1 to the Complaint is granted. The information granted confidential treatment contained in Exhibit 1 to the Complaint shall not be placed in the
public record or made available for public inspection for an indefinite period of time. 4. Mr. Coleman's request for confidential treatment of signer's names, addresses, and county of residence contained in Exhibit 1 to the Complaint is denied. 5. The materials for which the request for confidential treatment has been denied shall not be placed in the public record or made available for inspection for 20 days from the date of entry of this Order to allow Mr. Coleman to seek a remedy afforded by law. 6. Within 20 days of the date of this Order, Mr. Coleman shall file revised Exhibit 1 to the Complaint reflected the redaction of information determined to be confidential and reflecting as unredacted the information that has been denied confidential treatment. 7. Use of the materials for which confidential protection was granted shall comply with 807 KAR 5:001, Section 13(9).
|
2018-00297
|
9/17/2018
|
20180917_PSC_ORDER.pdf
|
2018-00290
|
9/17/2018
|
20180917_PSC_ORDER.pdf
|
2018-00261
|
9/17/2018
|
20180917_PSC_ORDER.pdf
|
2017-00349
|
9/18/2018
|
PSC_ORDER
Final Order Entered: 1. Sentra shall include the $3,308.06 under-recovery in the actual adjustment component of its next GCR application for rates effective November 1, 2018. 2. This case is closed and removed from the Commission's docket.
|
2018-00243
|
9/18/2018
|
20180918_PSC_ORDER.pdf
|
2018-00148
|
9/18/2018
|
20180918_DATA_REQUEST.pdf
Data Request
|
2018-00209
|
9/18/2018
|
20180918_PSC_ORDER.pdf
|
2017-00472
|
9/19/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in Appendix A to this Order shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with an original and six copies in paper medium, and an electronic version to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information that party shall provide a written explanation of the specific
grounds for its failure to completely and precisely respond. e. Careful attention should be given to copied material to ensure that it
is legible.
|
2018-00189
|
9/19/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Salt River Electric Cooperative Corporation
|
2018-00251
|
9/19/2018
|
PSC_ORDER
Final Order Entered: 1. Atmos is authorized to implement a $3,000,000,000 universal shelf registration for equity and debt financing, subject to the provisions and terms contained within its application, superseding the previous universal shelf authority granted in Case No. 2015-00346. 2. The proceeds from the transaction authorized herein shall be used only for the lawful purposes set out in the application. 3. Atmos shall, within ten days after each issuance of the securities referenced herein, file with the Commission a statement setting forth the date or dates of issuance, the price paid, the interest rate if any, the purchasers, and all fees and expenses, including underwriting discounts or commission or other compensation, involved in the issuance. In addition, if debt securities were issued, Atmos shall include an explanation as to how the interest rate alternative chosen represents the most reasonable interest rate available at the time of issuance, as well as copies of any executed interest rate management agreements. 4. Any documents filed pursuant to ordering paragraph 3 of this Order shall
reference the number of this case and shall be retained in the post-case correspondence file. 5. The remaining universal shelf registration authority granted to Atmos in Case No. 2015-00346 shall be terminated with the registration of the universal shelf registration that has been approved in this case. 6. This case is closed and removed from the Commission's Docket.
|
2018-00280
|
9/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Natural Energy and set forth in the Appendix to this Order are approved for final meter readings on and after October 1, 2018. 2. Within 20 days of the date of entry of this Order, Natural Energy shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00284
|
9/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Bluegrass and set forth in the Appendix to this Order is approved for service rendered on and after October 1, 2018. 2. Within 20 days of the date of entry of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00288
|
9/19/2018
|
20180919_PSC_ORDER.pdf
|
2018-00304
|
9/19/2018
|
20180919_PSC_ORDER.pdf
|
2016-00142
|
9/19/2018
|
20180919_DATA_REQUEST.pdf
Data Request
|
2018-00294
|
9/19/2018
|
20180919_DATA_REQUEST.pdf
Data Request
|
2018-00295
|
9/20/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Citipower on and after October 1, 2018. 3. Citipower shall submit all invoices received from Citigas and Citizens Gas
as part of all future GCR filings. 4. Within 20 days of the date of entry of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 5. Any documents filed in the future pursuant to ordering paragraph 3 shall reference this case number and shall be retained in the post-case correspondence file. 6. This case is hereby closed and will be removed from the Commission's docket.
|
2018-00303
|
9/20/2018
|
20180920_PSC_ORDER.pdf
|
2018-00306
|
9/20/2018
|
20180920_PSC_ORDER.pdf
|
2018-00307
|
9/21/2018
|
20180921_DATA_REQUEST.pdf
Data Request
|
2017-00472
|
9/21/2018
|
20180921_DATA_REQUEST01.pdf
Data Request
|
2017-00472
|
9/21/2018
|
20180921_PSC_ORDER.pdf
|
2018-00040
|
9/24/2018
|
PSC_ORDER
Order Entered: 1. BREC's motion to continue to hold the remaining procedural deadlines in this matter in abeyance is granted. 2. BREC shall file the formal settlement agreement as soon as it has been finalized and executed by the parties and prior to the October 2, 2018 status conference.
|
2018-00146
|
9/24/2018
|
PSC_ORDER
Final Order Entered: 1. The amounts billed by BREC through its environmental surcharge for the period August 1, 2017, through January 31, 2018, are approved. 2. The amounts billed by Jackson Purchase and Kenergy through their respective environmental surcharge pass-through mechanisms for the period August 1, 2017, through January 31, 2018, for all customers with dedicated delivery points are approved.
3. The amounts billed by the three Member Cooperatives through their respective environmental surcharge pass-through mechanisms for the period September 1, 2017, through February 28, 2018, for all non-dedicated delivery point customers are approved. 4. The rates of return determined by BREC for each month of the review period are approved. 5. This case is closed and removed from the Commission's docket.
|
2018-00163
|
9/24/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Western Lewis District is denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Western Lewis District on and after October 1, 2018. 3. Within 20 days of the date of entry of this Order, Western Lewis District shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00299
|
9/24/2018
|
20180924_PSC_ORDER.pdf
|
2015-00264
|
9/25/2018
|
PSC_ORDER
Final Order Entered: 1. Mountain District's request to revise its water and sewer connection fee installment plans is approved and are effective as the date of entry of this order. 2. Within 20 days of the date of entry of this Order, Mountain District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the revised water and sewer connection fee installment plans approved herein. 3. This case is closed and removed from the Commission's docket.
|
2018-00227
|
9/25/2018
|
PSC_ORDER
Order Entered nunc pro tunc, that: 1. Ordering paragraph 5 of the September 20, 2018 Order is hereby stricken. 2. All other provisions of the September 20, 2018 Order shall remain in full force and effect.
|
2018-00303
|
9/25/2018
|
20180925_DATA_REQUEST.pdf
Data Request
|
2018-00222
|
9/27/2018
|
DATA_REQUEST
Commission Staff's First Request for the Information to Valley Gas, Inc.
|
2018-00298
|
9/27/2018
|
20180927_PSC_ORDER.pdf
|
2018-00309
|
9/27/2018
|
20180927_PSC_ORDER.pdf
|
2018-00050
|
9/27/2018
|
20180927_DATA_REQUEST.pdf
Data Request
|
2018-00304
|
9/27/2018
|
20180927_PSC_ORDER.pdf
|
2018-00041
|
9/28/2018
|
20180928_PSC_ORDER.pdf
|
2018-00034
|
10/1/2018
|
STAFF_REPORT
Notice of Filing of Staff Report
|
2018-00205
|
10/1/2018
|
PSC_ORDER
Order Entered: South Anderson District's motion for an extension of time is granted, and South Anderson District's responses to Staff's First Request shall be due on or before October 9, 2018.
|
2018-00244
|
10/1/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located at 10101 N. Hwy 421, Manchester, Clay County, Kentucky. The coordinates for the proposed facility are North Latitude 37°16'08.86" by West Longitude 83°48'57.23". 2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00282
|
10/1/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located at 565 Halls Hollow Road, Pineville, Bell County, Kentucky. The coordinates for the proposed facility are North Latitude 36°47'24.94" by West Longitude 83°31 '59.74". 2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00283
|
10/1/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Shelby Energy Cooperative, Inc.
|
2018-00310
|
10/1/2018
|
20181001_PSC_ORDER.pdf
|
2018-00050
|
10/1/2018
|
20181001_DATA_REQUEST.pdf
Data Request
|
2018-00311
|
10/1/2018
|
20181001_DATA_REQUEST.pdf
Data Request
|
2018-00287
|
10/1/2018
|
20181001_PSC_ORDER.pdf
|
2018-00311
|
10/1/2018
|
20181001_PSC_ORDER.pdf
|
2018-00261
|
10/2/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2018-00138
|
10/2/2018
|
PSC_ORDER
Order Entered: 1. Mr. Coleman's request for rehearing is denied. 2. Mr. Coleman's request for a hearing is denied as moot. 3. Mr. Coleman's request for an extension of time to file a revised Exhibit 1 to the Complaint, reflecting the redaction of information determined to be confidential and reflecting as unredacted the information that has been denied confidential treatment, is granted. 4. Within 20 days of the date of this Order, Mr. Coleman shall file either a revised Exhibit 1 reflecting the redaction of only the signers' telephone numbers, or a
written request to withdraw Exhibit 1, which contains the petition, from the case record. 5. This case shall remain open in order to allow Mr. Coleman time to file the document referenced in ordering paragraph 4. After 30 days, this case shall be closed and removed from the Commission's docket. -
|
2018-00297
|
10/2/2018
|
20181002_PSC_ORDER.pdf
|
2018-00304
|
10/2/2018
|
20181002_PSC_ORDER.pdf
|
2018-00261
|
10/2/2018
|
20181002_PSC_ORDER.pdf
|
2017-00321
|
10/3/2018
|
PSC_ORDER
Order Entered: This proceeding is held in abeyance until March 2, 2019.
|
2018-00103
|
10/3/2018
|
PSC_ORDER
Order Entered: 1. Dawson Springs's motion to withdraw the proposed wholesale rate increase contained in its May 15, 2018 filing is granted.
2. This case is dismissed without prejudice. 3. This case is closed and removed from the Commission's docket.
|
2018-00189
|
10/3/2018
|
PSC_ORDER
Final Order Entered: 1. The amended complaint filed by Mr. Dawley is dismissed for failing to conform to the requirements of 807 KAR 5:001, Section 20(1 )(c). 2. This case is closed and removed from the Commission's docket.
|
2018-00259
|
10/3/2018
|
PSC_ORDER
Order Entered: 1. No later than January 8, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding Western Lewis-Rectorville District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Western Lewis-Rectorville District's financial condition supports a higher rate than Western Lewis-Rectorville District proposes or the assessment of an additional rate or charge not proposed in Western Lewis-Rectorville District's Application, Western Lewis-Rectorville District, in its response to the Commission Staff Report, shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge.
|
2018-00321
|
10/3/2018
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Sparta, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city. 7. This case is closed and removed from the Commission's docket.
|
2018-00325
|
10/3/2018
|
PSC_ORDER02
Final Order Entered: 1. LG&E is granted a CPCN that authorizes it to bid on a franchise offered by the city of Mt. Washington, Kentucky, for the transmission and distribution of natural gas. 2. If LG&E is not the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that LG&E was not the successful bidder. 3. If LG&E is the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise
agreement and a statement disclosing the amount of the initial franchise fee. 4. If LG&E is the successful bidder, LG&E shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city. 7. This case is closed and removed from the Commission's docket.
|
2018-00326
|
10/3/2018
|
PSC_ORDER
Final Order Entered: 1. LG&E is granted a CPCN that authorizes it to bid on a franchise offered by the city of Mt. Washington, Kentucky, for electric transmission and distribution service. 2. If LG&E is not the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that LG&E was not the successful bidder. 3. If LG&E is the successful bidder, LG&E shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise
agreement and a statement disclosing the amount of the initial franchise fee. 4. If LG&E is the successful bidder, LG&E shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city. 7. This case is closed and removed from the Commission's docket.
|
2018-00327
|
10/3/2018
|
20181003_PSC_ORDER.pdf
|
2018-00050
|
10/3/2018
|
20181003_PSC_ORDER.pdf
|
2014-00267
|
10/3/2018
|
20181003_PSC_ORDER.pdf
|
2018-00208
|
10/3/2018
|
20181003_PSC_ORDER01.pdf
|
2018-00050
|
10/3/2018
|
20181003_PSC_ORDER.pdf
|
2018-00221
|
10/3/2018
|
20181003_PSC_ORDER.pdf
|
2018-00263
|
10/4/2018
|
PSC_ORDER
Order Entered: 1. Applicants' petition for confidential protection for the designated material in Applicants' Response to Commission Staff's First Request for Information is granted. 2. The designated material shall not be placed in the public record or made available for public inspection until further Orders of this Commission. 3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Applicants shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, then Applicants shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Applicants are unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested material available for inspection for 20 days following an Order finding that the material no longer qualifies for confidential treatment in order to allow Applicants to seek a remedy afforded by law.
|
2017-00435
|
10/4/2018
|
PSC_ORDER
Order Entered: 1. Whitley District #1 's petition for confidential protection for all paper and electronic diagrams and maps of the Whitley District #1's water distribution system submitted with its application is granted. 2. The designated material shall not be placed in the public record or made available for public inspection until further Orders of this Commission. 3. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Whitley District #1 shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect the material granted confidential treatment by this Order, Whitley District #1 shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Whitley District #1 is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested material available for inspection for 20 days following an Order finding that the material no longer qualifies for confidential treatment in order to allow Whitley District #1 to seek a remedy afforded by law.
|
2018-00235
|
10/4/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Kentucky Utilities Company
|
2018-00273
|
10/4/2018
|
DATA_REQUEST01
Commission Staff's First Request for Information to Stephen W. Peyton
|
2018-00273
|
10/4/2018
|
PSC_ORDER
Final Order Entered: 1. The 2018 Water Personnel Training Seminar, which the Commission conducted at Kentucky Dam Village State Resort Park, located at 113 Administration Drive, Calvert City, Kentucky, on September 19-20, 2018, is approved for a maximum of 12 credit hours of water district management training and for a maximum of 12 credit hours of new water district commissioner training. 2. Within 20 days of the date of this Order, Commission Staff shall file into the post-case referenced correspondence file for this case a list of the names of each attendee, his or her water district, and the number of hours that he or she attended this training program. 3. This case is closed and removed from the Commission’s docket. -
|
2018-00331
|
10/4/2018
|
PSC_ORDER
Order Entered: 1. The Commission opens this proceeding to conduct a formal review of the TRS fund to determine if a change in the surcharge is warranted. 2. Any comments shall be filed no later than October 29, 2018.
|
2018-00332
|
10/5/2018
|
20181005_PSC_ORDER.pdf
Order Entered: 1. A hearing in this matter shall be held on December 11, 2018, at 9:00 a.m. Eastern Standard Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. The hearing will continue through December 12, 2
|
2018-00157
|
10/5/2018
|
PSC_ORDER
Order Entered: 1. Oldham County Vet and Ms. Ford shall have 28 days from the date this Order is entered to supplement this complaint by filing a paper indicating the type of service at issue and name of the customer as listed on the bill provided by the companies providing telephone service. 2. If the telephone service was in the name of a corporation during the period at issue, then the corporation shall have 28 days from the date of this Order to obtain counsel to represent it in this matter. 3. The Commission will dismiss the complaint without prejudice if Oldham County Vet or Ms. Ford does not provide the information requested in numerical paragraph 1, or if the service is in the name of a corporation and no attorney enters an appearance on behalf of the corporation within the period prescribed by numerical paragraph 2.
4. Birch Communications shall have no obligation to file an answer or responsive pleading to the complaint or any supplement or amendment thereto until ordered to do so by this Commission. 5. Nothing in this Order shall be construed as limiting the authority of the Commission to open an independent investigation based on the factual allegations made in the complaint pursuant to another provision of KRS Chapter 278 or applicable administrative regulations.
|
2018-00308
|
10/5/2018
|
20181005_PSC_ORDER.pdf
|
2017-00441
|
10/5/2018
|
20181005_PSC_ORDER.pdf
|
2018-00072
|
10/5/2018
|
20181005_PSC_ORDER.pdf
|
2018-00291
|
10/5/2018
|
20181005_PSC_ORDER.pdf
|
2017-00316
|
10/8/2018
|
DATA_REQUEST
Commission Staff's Fourth Request for Information to Inter-County Energy Cooperative Corporation
|
2018-00129
|
10/8/2018
|
PSC_ORDER
Order Entered: 1. Within 20 days of the date of this Order, Mr. Taylor shall file copies of the bills issued to Mr. Taylor by KU/LG&E for each month in question. And, 2. Mr. Taylor shall clearly state against which utility he is filing his Complaint.
|
2018-00215
|
10/8/2018
|
PSC_ORDER
Final Order Entered: 1. Kenergy is granted a CPCN that authorizes it to bid on franchises offered by the city of Lewisport, Kentucky, and Dixon, Kentucky for electric transmission and distribution service. 2. If Kenergy is not the successful bidder on either, or both of the franchises, Kenergy shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Kenergy was not the successful bidder. 3. If Kenergy is the successful bidder on either or both franchises, Kenergy shall file with the Commission, within ten days of the award of the franchise at issue, a copy of the executed franchise agreements and a statement disclosing the amount of the initial franchise fees. 4. If Kenergy is the successful bidder for either or both franchises, Kenergy shall, within ten days of an increase or decrease in the amount of the initial franchise fees set forth in the respective franchise agreements, file with the Commission documentation setting forth the revised fees. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said cities. 7. This case is closed and removed from the Commission's docket.
|
2018-00319
|
10/8/2018
|
20181008_PSC_ORDER.pdf
|
2018-00311
|
10/8/2018
|
20181008_DATA_REQUEST.pdf
Data Request
|
2018-00311
|
10/8/2018
|
20181008_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00041
|
10/9/2018
|
PSC_ORDER
Order Entered: Kentucky-American is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint
within ten days from the date of entry of this Order.
|
2018-00312
|
10/9/2018
|
20181009_DATA_REQUEST.pdf
Data Request
|
2018-00218
|
10/9/2018
|
20181009_DATA_REQUEST.pdf
Data Request
|
2018-00219
|
10/9/2018
|
20181009_PSC_ORDER.pdf
|
2018-00216
|
10/9/2018
|
20181009_PSC_ORDER.pdf
|
2018-00217
|
10/9/2018
|
20181009_DATA_REQUEST.pdf
Data Request
|
2018-00220
|
10/10/2018
|
PSC_ORDER
Final Order Entered: 1. East Kentucky is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a 180-foot self-supporting telecommunications tower with attached antennas, and is to be located on a tract of land at 266 Vanover Hill Road, Coldiron, Harlan County, Kentucky. The coordinates for the proposed facility are 36°49'03.5055" North latitude, 83°29'47.2293" West longitude. 2. East Kentucky shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file.
4. This case is hereby closed and will be removed from the Commission's docket.
|
2018-00155
|
10/10/2018
|
20181010_DATA_REQUEST.pdf
Data Request
|
2018-00261
|
10/10/2018
|
20181010_PSC_ORDER.pdf
|
2018-00034
|
10/11/2018
|
PSC_ORDER
Order Entered: 1. Inter-County Energy's motion for an extension of time is granted. 2. Inter-County Energy shall file its responses to Commission Staff's Fourth Request for Information on or before October 22, 2018.
|
2018-00129
|
10/11/2018
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2018-00129
|
10/11/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00292
|
10/11/2018
|
20181011_PSC_ORDER.pdf
|
2018-00294
|
10/11/2018
|
20181011_PSC_ORDER.pdf
|
2018-00295
|
10/11/2018
|
20181011_PSC_ORDER.pdf
|
2018-00338
|
10/12/2018
|
PSC_ORDER
Order Entered: 1. Grayson RECC's Motion for an extension of time is granted. 2. Grayson RECC's responses to Staff's First Request shall be due on or before October 12, 2018.
|
2018-00272
|
10/15/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on a tract of land located at 270 Mt. Pleasant Church Road, Gray, Knox County, Kentucky. The coordinates for the proposed facility are 36°54'51.4979" North latitude, 83°55'43.8413" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is hereby closed and removed from the Commission's docket.
|
2018-00285
|
10/15/2018
|
20181015_PSC_ORDER.pdf
|
2018-00302
|
10/15/2018
|
20181015_PSC_ORDER.pdf
|
2017-00427
|
10/15/2018
|
20181015_PSC_ORDER.pdf
|
2018-00294
|
10/15/2018
|
20181015_PSC_ORDER.pdf
|
2018-00017
|
10/16/2018
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed in this proceeding. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, the original and five copies to the Commission. Responses that are required to be provided on electronic medium shall be in portable document format (PDF), shall be
searchable and shall be appropriately bookmarked. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it
obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2018-00270
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00221
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00218
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00219
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00220
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00295
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00287
|
10/16/2018
|
20181016_PSC_ORDER.pdf
|
2018-00017
|
10/17/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's
regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2018-00270
|
10/17/2018
|
20181017_PSC_ORDER.pdf
|
2018-00316
|
10/17/2018
|
20181017_PSC_ORDER.pdf
|
2018-00143
|
10/17/2018
|
20181017_DATA_REQUEST.pdf
Data Request
|
2018-00209
|
10/17/2018
|
20181017_PSC_ORDER.pdf
|
2018-00291
|
10/18/2018
|
PSC_ORDER
Final Order Entered: 1. KU's motion to dismiss is granted. 2. This matter is closed and removed from the Commission's docket.
|
2018-00273
|
10/18/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on a tract of land located at 4067 Hwy 904E, Williamsburg, Whitley County, Kentucky. The coordinates for the proposed facility are 36°42'57.75" North latitude, 84°05'04.86" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is hereby closed and removed from the Commission's docket.
|
2018-00305
|
10/18/2018
|
20181018_PSC_ORDER.pdf
|
2018-00209
|
10/19/2018
|
PSC_ORDER
Order Entered: 1. Grayson RECC's proposed rates are suspended for five months, up to and including, April 1, 2019. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound,
tabbed, and indexed, with copies to all parties, and the original and six copies to the Commission. Responses that are required to be provided on electronic medium shall in portable document format (PDF), shall be searchable and shall be appropriately bookmarked. Each response shall include the name of the witness responsible for responding to the questions related to the information provided. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00272
|
10/19/2018
|
PSC_ORDER
Final Order Entered: 1.The rates set forth in the Appendix to this Order are approved for final meter readings on and after November 1, 2018.
2. Within 20 days of the date of the entry of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket. -
|
2018-00337
|
10/19/2018
|
20181019_PSC_ORDER.pdf
|
2018-00318
|
10/19/2018
|
20181019_PSC_ORDER.pdf
|
2018-00147
|
10/19/2018
|
20181019_DATA_REQUEST.pdf
Data Request
|
2018-00147
|
10/19/2018
|
20181019_DATA_REQUEST.pdf
Data Request
|
2018-00064
|
10/19/2018
|
20181019_PSC_ORDER.pdf
|
2018-00315
|
10/19/2018
|
20181019_PSC_ORDER.pdf
|
2018-00317
|
10/22/2018
|
PSC_ORDER
Final Order Entered: The purchased water adjustment factor of $0.10 per 1,000 gallons is approved. 2. The rates proposed by Morgan District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Morgan District on and after October 1, 2018. 4. Within 20 days of the date of entry of this Order, Morgan District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. Within 30 days of the date of entry of this Order, Morgan District shall file with the Commission Proof of Notice pursuant to KAR 5:068, Section 5(3). 6. Any document filed pursuant to ordering paragraph 5 of this Order shall reference this case number and shall be retained in the post-case correspondence file.
7. This case is closed and removed from the Commission's docket.
|
2018-00301
|
10/22/2018
|
PSC_ORDER
Order Entered: 1. No later than January 15, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding Milburn District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Milburn District's financial condition supports a higher rate than Milburn District proposes or the assessment of an additional rate or charge not proposed in Milburn District's Application, Milburn District in its response to
the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which Milburn District accounts for the depreciation of Milburn District's assets, Milburn District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Milburn District to implement the proposed change for accounting purposes.
|
2018-00314
|
10/22/2018
|
PSC_ORDER
Order Entered: 1. This case shall be continued for 60 additional days, up to and including February 8, 2019. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with an original and five copies in paper medium to the Commission, and a copy to all parties of record. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information that indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part
of the requesting information that party shall provide a written explanation of the specific grounds for failure to completely and precisely respond. e. Careful attention should be given to copied material to ensure that it is legible.
|
2018-00347
|
10/22/2018
|
20181022_PSC_ORDER.pdf
|
2018-00208
|
10/23/2018
|
PSC_ORDER
Final Order Entered: 1. BREC's motion for leave to file the Settlement Agreement and supporting testimony is granted. 2. The Settlement Agreement is approved. 3. BREC's request for authority to establish, for accounting purposes, the Station Two Regulatory Asset is approved. 4. BREC's proposed revisions to the MRSM tariff are approved. 5. Within 20 days of the date of entry of this Order, BREC shall file with the Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the modifications approved herein and reflecting their effective date and that they were authorized by this Order. 5. The case is hereby closed and removed from the Commission's docket.
|
2018-00146
|
10/23/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after October 28, 2018. 3. Burkesville shall fi le its next GCR application with the Commission on or
about November 28, 2018, for the calendar quarter of January through March 2019. 4. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 5. This case is closed and removed from the Commission's docket.
|
2018-00328
|
10/24/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.32 per 1,000 gallons is approved. 2. The rates proposed by East Casey District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by East Casey District on and after October 16, 2018. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by East Casey District on and after October 16, 2018. 4. Within 20 days of the date of entry of this Order, East Casey District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. This case is closed and removed from the Commission's docket.
|
2018-00324
|
10/24/2018
|
20181024_STAFF_REPORT.pdf
Staff Report
|
2018-00230
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2018-00044
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2018-00294
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2018-00295
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2018-00041
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2017-00441
|
10/25/2018
|
20181025_PSC_ORDER.pdf
|
2018-00341
|
10/26/2018
|
PSC_ORDER
Final Order Entered: 1. Kentucky RSA #4 is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 250 feet in height, with attached antennas, to be located at 693 J E Bickett Road, Raywick, Marion County, Kentucky 40060. The coordinates for the proposed facility are North Latitude 37°33'17.47" by West Longitude 85°25'9.90". 2. Kentucky RSA #4 shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00152
|
10/26/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Jetta Operating Appalachia, LLC
|
2018-00212
|
10/26/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 310 feet in height, with attached antennas, to be located at 10568 U.S. HWY 25E, Pineville, Bell County, Kentucky. The coordinates for the proposed facility are North Latitude 36°43'00.5439" by West Longitude 83°40'55.6647". 2. Appalachian Wireless shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Appalachian Wireless shall file a copy of the final decision regarding the pending KAZC and FAA applications for the proposed construction within ten days of receiving a decision. 4. Any documents filed in the future pursuant to ordering paragraphs 2 and shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00296
|
10/26/2018
|
PSC_ORDER
Order Entered: Nolin is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten days from
the date of entry of this Order. Should documents of any kind by filed with the Commission in the course of this proceeding, the documents shall also be served on all parties of record. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section
4(10), encrypt or redact the paper so personal information cannot be read.
|
2018-00345
|
10/26/2018
|
PSC_ORDER
Order Entered: 1. Owen Electric's proposed Opt-Out Tariff is suspended for five months, from November 1, 2018, to April 30, 2019. 2. The entire case file for Case No. 2012-00468, as well as any responses submitted by Owen Electric in Case No. 2012-00448 that relate to the meter reading tariff, are incorporated into this case by reference. 3. The procedural schedule set forth in the Appendix to this Order shall be followed. 4. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2018-00354
|
10/26/2018
|
20181026_DATA_REQUEST.pdf
Data Request
|
2018-00304
|
10/26/2018
|
20181026_PSC_ORDER.pdf
|
2018-00281
|
10/26/2018
|
20181026_PSC_ORDER01.pdf
|
2018-00281
|
10/26/2018
|
20181026_PSC_ORDER.pdf
|
2018-00348
|
10/29/2018
|
PSC_ORDER
Order Entered: Sherry Basore may file with the Commission any reply to Kentucky-American's response and to provide the Commission with any additional information that she feels is relevant within 14 days of the date of entry of this Order.
|
2018-00312
|
10/29/2018
|
PSC_ORDER
Final Order Entered: 1. Northeast Woodford District's request to substitute the redacted page attached to its motion for the page attached to its application as Exhibit A, is granted. 2. Northeast Woodford District's motion to withdraw its application filed October 5, 2018, is granted.
3. The above-styled proceeding is dismissed with prejudice. 4. This case is closed and removed from the Commission's docket.
|
2018-00342
|
10/29/2018
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Joint Applicants, Joann Estates Utilities, Inc. and Paducah-McCracken County Joint Sewer System
|
2018-00347
|
10/29/2018
|
20181029_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2018-00208
|
10/30/2018
|
PSC_ORDER
Final Order Entered: 1. American Broadband's motion to withdraw its request to receive support payment from the KUSF is granted. 2. This case is closed and removed from the Commission's docket.
|
2016-00426
|
10/30/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Valley Gas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after November 1, 2018. 3. Valley Gas's future GCR applications shall include the information required in finding paragraph 8. 4. Valley Gas shall file its next GCR application with the Commission on or about December 2, 2018, for the calendar quarter of January through March 2019. 5. Within 20 days of the date of entry of this Order, Valley Gas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order. 6. This case is closed and removed from the Commission's docket.
|
2018-00298
|
10/30/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier and set forth in the Appendix to this Order are approved for final meter readings by Frontier on and after November 1, 2018. 2. Each customer's bill shall separately reflect the approved gas cost reconciliation rate applicable to the customer's service area. 3. Within 20 days of the date of entry of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. The individual gas cost reconciliation rates for Frontier and the former Public system shall be included in the compliance tariffs. 4. This case is closed and removed from the Commission's docket.
|
2018-00334
|
10/30/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Navitas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered by Navitas on and after November 1, 2018. 3. Within 20 days of the date of entry of this Order, Navitas shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00336
|
10/30/2018
|
20181030_PSC_ORDER.pdf
|
2018-00348
|
10/30/2018
|
20181030_PSC_ORDER.pdf
|
2018-00311
|
10/30/2018
|
20181030_PSC_ORDER.pdf
|
2017-00441
|
10/31/2018
|
20181031_PSC_ORDER.pdf
|
2018-00147
|
10/31/2018
|
20181031_PSC_ORDER.pdf
|
2018-00036
|
11/1/2018
|
PSC_ORDER
Final Order Entered: 1. Applicants are granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 325 feet in height, with attached antennas, and to be located at 1641 Lee Burd Road, Benton, Kentucky. The coordinates for the proposed facility are North Latitude 36° 49'24.34" by West Longitude 88° 28'25.57". 2. Applicants shall file with the Commission notice of KAZC's approval of their application within ten days of receiving said approval. 3. Applicants shall immediately notify the Commission in writing, if, after the tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraph 2 or 3 herein, shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2017-00435
|
11/1/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Hardin County Water District No. 1
|
2018-00166
|
11/1/2018
|
PSC_ORDER
Final Order Entered: 1. Applicants are granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 300 feet in height, with attached antennas, and to be located at 6741 U.S. Highway 119, Calvin, Bell
County, Kentucky. The coordinates for the proposed facility are North Latitude 36° 44'20.18" by West Longitude 83° 36'20.99".
2. Applicants shall immediately notify the Commission in writing, if, after the tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00286
|
11/1/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Shelby Energy Cooperative, Inc.
|
2018-00310
|
11/1/2018
|
20181101_DATA_REQUEST.pdf
Data Request
|
2018-00323
|
11/1/2018
|
20181101_DATA_REQUEST.pdf
Data Request
|
2018-00322
|
11/1/2018
|
20181101_DATA_REQUEST.pdf
Data Request
|
2018-00341
|
11/1/2018
|
20181101_DATA_REQUEST.pdf
Data Request
|
2018-00335
|
11/2/2018
|
20181102_PSC_ORDER.pdf
Order Entered: IT IS HEREBY ORDERED that an in-person informal conference is scheduled for November 9, 2018, at 10:30 a.m. Eastern Standard Time at the offices of the Commission located at 211 Sower Boulevard, Frankfort, Kentucky to discuss a potential set
|
2018-00157
|
11/2/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00270
|
11/5/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's
regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. The Commission does not look favorably upon motions for continuance. Accordingly, motions for extensions of time with respect to the schedule herein shall be made in writing and will be granted only upon a showing of good cause. 5. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2018-00272
|
11/5/2018
|
PSC_ORDER01
Order Entered: 1. Grayson RECC and any intervening parties shall appear on February 19, 2019, at 9 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard in Frankfort, Kentucky for the purposes of presenting evidence
concerning Grayson RECC's request for adjustment of rates. 2. Grayson RECC shall give notice of the hearing in accordance with the
provisions set forth in 807 KAR 5:001, Section 9(2). In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time publication is requested, Grayson RECC shall forward a duplicate of the notice and request to the Commission. 3. At any public hearing in this matter, neither opening statements nor
summarization of direct testimonies shall be permitted. 4. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video
recording shall be made of the hearing. 5. The Commission does not look favorably upon motions for continuance. Accordingly, motions for extensions of time with respect to the schedule herein shall be made in writing and will be granted only upon a showing of good cause.
6. Grayson RECC and any intervening parties shall file with the Commission, no later than February 12, 2019, seven days prior to hearing, a list of witnesses and exhibits to be presented at the February 19, 2019 hearing.
|
2018-00272
|
11/5/2018
|
20181105_PSC_ORDER.pdf
|
2018-00291
|
11/5/2018
|
20181105_DATA_REQUEST.pdf
Data Request
|
2018-00261
|
11/5/2018
|
20181105_PSC_ORDER.pdf
|
2018-00017
|
11/6/2018
|
PSC_ORDER
Order Entered: 1. No later than November 30, 2018, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding North Mclean District's requested rate adjustment. 2. All provisions of the Commission's Order of August 31, 2018, in conflict with the provisions of this Order are vacated. All other provisions of the Order of August 31,
2018, shall remain in effect.
|
2018-00260
|
11/6/2018
|
20181106_DATA_REQUEST.pdf
Data Request
|
2018-00291
|
11/6/2018
|
20181106_PSC_ORDER.pdf
|
2018-00351
|
11/6/2018
|
20181106_PSC_ORDER.pdf
|
2018-00208
|
11/7/2018
|
PSC_ORDER
Final Order Entered: 1. South Anderson District is granted a CPCN to proceed with the proposed purchase as set forth in its application.
2. Southern Anderson District is also authorized to perform the necessary minor renovations set forth in its Answers to Commission Staff's First Request for Information, Response No. 15. 3. South Anderson District shall notify the Commission prior to performing any additional purchases or renovations not expressly authorized by this Order. 4. Any deviation from the purchase approved by this Order shall be
undertaken only with the prior approval of the Commission. 5. South Anderson District shall file with the Commission documentation of the
total costs of this project, within 60 days of the date of completion of the allowed minor renovations. 6. Any documents filed in the future pursuant to ordering paragraph 5, shall reference this case number and shall be retained in the post-case correspondence file. 7. The Executive Director is delegated authority to grant reasonable extensions of time for filing any documents required by this Order upon South Anderson District's showing of good cause for such extension. 8. This case is closed and removed from the Commission's docket.
|
2018-00244
|
11/7/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00292
|
11/7/2018
|
PSC_ORDER
Order Entered: 1. Viasat shall obtain an attorney who is licensed to practice law in Kentucky or an attorney who has complied with SCR 3.030(2) within 21 days. 2. If an attorney who is licensed to practice law in Kentucky or has complied with SCR 3.030(2) does not enter an appearance on behalf Viasat within 21 days, then the Commission will dismiss the Application without prejudice.
|
2018-00330
|
11/7/2018
|
PSC_ORDER
Final Order Entered: 1. Bracken County District is granted a CPCN for the proposed project as submitted. 2. Bracken County District's proposed plan of financing is approved. 3. Bracken County District is authorized to issue $3,427,000 of Bracken County District Water District Waterworks Revenue Bonds at an interest rate to be equal to the lower of the rate in effect at the time of loan approval or the interest rate in effect at the time of closing, not to exceed 2.75 percent. 4. The proceeds from the promissory note shall be used only for the purposes specified in Bracken County District's application. 5. Bracken County District shall obtain approval from the Commission prior to
performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Bracken County District may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Bracken County District rates for service. Bracken County District shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4.
7. Bracken County District shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs, within 60 days of the date that construction is substantially completed.
|
2018-00352
|
11/8/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 270 feet in height, with attached antennas, to be located at Tucker Hollow Lane, Hartford, Ohio County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 31 '40. 70" by West Longitude 87° 01 '15. 92". 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00179
|
11/8/2018
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall adhere to the procedural schedule set forth in
the Commission's October 22, 2018 Order and as amended by subsequent Orders. 4. Within seven days of entry of this Order, the Attorney General shall provide his electronic email address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8).
|
2018-00314
|
11/8/2018
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on a tract of land located at 2552 Highway 11, Williamsburg, Whitley County, Kentucky. The coordinates for the proposed facility are 36°45'18.11" North latitude, 83°58'02.77" West longitude. 2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is hereby closed and removed from the Commission's docket.
|
2018-00320
|
11/8/2018
|
PSC_ORDER
Final Order Entered: 1. The TRS surcharge shall remain at one cent ($0.01) per month. 2. Carriers shall continue to remit the TRS surcharge monthly via the online portal established by the Commission. 3. A copy of this Order shall be served on all local exchange carriers and
commercial mobile radio service providers in Kentucky. 4. This case is closed and removed from the Commission's docket.
|
2018-00332
|
11/8/2018
|
PSC_ORDER
Order Entered: 1. Pursuant to KRS 74.025, this proceeding is initiated to determine whether John Horn has complied with KRS 74.020(8) and whether he is qualified to continue to serve as a member of Martin District's Board of Commissioners. 2. Within 10 days of service of this Order, Mr. Horn shall file with the Commission a written response to this Order and shall specifically admit or deny the allegation that he has not completed a program of instruction for newly appointed commissioners within one year of the date of his initial appointment as a commissioner of Martin District. 3. Unless he waives his right to a public hearing in this matter, Mr. Horn shall appear at the Commission's offices at 211 Sower Boulevard on January 8, 2019, at 1:00 p.m. Eastern Standard Time for a public hearing on whether he has completed a Commission program of instruction for newly appointed commissioners within one year of the date of his initial appointment as a commissioner of Martin District and whether, if he has not completed the required training within the time period that KRS 74.020(8)
specifies, he is disqualified from continued service as a member of Martin District's Board of Commissioners and must be removed from that Board.
|
2018-00367
|
11/8/2018
|
20181108_PSC_ORDER.pdf
|
2018-00281
|
11/8/2018
|
20181108_PSC_ORDER.pdf
|
2018-00304
|
11/9/2018
|
20181109_PSC_ORDER.pdf
|
2017-00417
|
11/9/2018
|
20181109_PSC_ORDER.pdf
|
2018-00036
|
11/9/2018
|
20181109_DATA_REQUEST.pdf
Data Request
|
2018-00358
|
11/9/2018
|
20181109_PSC_ORDER.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER01.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER02.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER03.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER01.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER02.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER03.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER04.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER04.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER05.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER06.pdf
|
2018-00294
|
11/9/2018
|
20181109_PSC_ORDER05.pdf
|
2018-00295
|
11/9/2018
|
20181109_PSC_ORDER06.pdf
|
2018-00295
|
11/13/2018
|
20181113_DATA_REQUEST.pdf
Data Request
|
2018-00295
|
11/13/2018
|
20181113_DATA_REQUEST.pdf
Data Request
|
2018-00294
|
11/13/2018
|
20181113_DATA_REQUEST.pdf
Data Request
|
2018-00357
|
11/14/2018
|
PSC_ORDER
Order Entered: 1. Complainant's motion is granted. 2. Within 30 days of the date of this Order, Complainant shall file copies of the bills issued to him by KU/LG&E for each month in question, and 2018 to date.
|
2018-00215
|
11/14/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to Grayson Rural Electric Cooperative Corporation
|
2018-00272
|
11/14/2018
|
20181114_PSC_ORDER.pdf
|
2017-00328
|
11/14/2018
|
20181114_PSC_ORDER.pdf
|
2016-00142
|
11/14/2018
|
20181114_DATA_REQUEST.pdf
Data Request
|
2018-00064
|
11/15/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 270 feet in height, with attached antennas, to be located at County Road 1248A8, a.k.a. Camp Creek Road, Wallins Creek, Harlan County, Kentucky. The coordinates for the proposed facility are North Latitude 36°48'02.36" by West Longitude 83°24'43.64". 2. AT&T Mobility shall file a copy of the final decision regarding its pending KAZC application for the proposed construction within ten days of receiving the decision. 3. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00340
|
11/15/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.210 per 1,000 gallons is approved. 2. The rates proposed by Southeast Daviess District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Southeast Daviess District on and after December 1, 2018. 4. Within 20 days of the date of entry of this Order, Southeast Daviess District
shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
5. This case is closed and removed from the Commission's docket.
|
2018-00365
|
11/15/2018
|
20181115_PSC_ORDER.pdf
|
2018-00294
|
11/15/2018
|
20181115_PSC_ORDER.pdf
|
2018-00230
|
11/15/2018
|
20181115_PSC_ORDER.pdf
|
2018-00287
|
11/16/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.69 per 1,000 gallons is approved. 2. The rates proposed by West Daviess District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by West Daviess District on and after December 1, 2018. 4. Within 20 days of the date of entry of this Order, West Daviess District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. This case is closed and removed from the Commission's docket.
|
2018-00364
|
11/16/2018
|
20181116_PSC_ORDER.pdf
|
2018-00348
|
11/16/2018
|
20181116_PSC_ORDER.pdf
|
2018-00294
|
11/16/2018
|
20181116_PSC_ORDER01.pdf
|
2018-00294
|
11/16/2018
|
20181116_PSC_ORDER.pdf
|
2018-00295
|
11/16/2018
|
20181116_PSC_ORDER01.pdf
|
2018-00295
|
11/16/2018
|
20181116_PSC_ORDER.pdf
|
2017-00328
|
11/19/2018
|
PSC_ORDER
Final Order Entered: 1 . The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The water rates originally proposed by Fountain Run District #1 are denied. 3. The water rates for Phase 1 in Appendix A to this order are approved for water service on and after the date of this Order. 4. The water rates for Phase 2 in Appendix B to this order are approved for water service one year after the date of this Order. 5. One week prior to the effective date of the Phase 2 water rates, Fountain
Run District #1 shall publish notice following the requirements of 807 KAR 5:076, Section 5. The customer notice shall be in the same format, as set forth in Appendix C to this Order, and shall contain only the rate comparison being implemented for the Phase 2 rates.
6. Within 45 days of publishing the notice required in ordering paragraph 5, Fountain Run District #1 shall file proof of notice as required pursuant to 807 KAR 5:076, Section 5(3). 7. Within 20 days of the date of entry of this Order, Fountain Run District #1 shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order. 8. Any documents filed pursuant to ordering paragraph 6 shall reference case number and shall be retained in post-case correspondence file.
|
2018-00205
|
11/19/2018
|
PSC_ORDER
Order Entered: 1. No later than January 22, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report ("Staff Report") containing its findings and recommendations regarding Muhlenberg District #3's requested rate adjustment.
2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission:
a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Muhlenberg District #3's financial condition supports a higher rate than Muhlenberg District #3 proposes or the assessment of an additional rate or charge not proposed in Muhlenberg District #3's Application, Muhlenberg District #3 in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which Muhlenberg District #3 accounts for the depreciation of Muhlenberg District #3's assets, Muhlenberg District #3 in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Muhlenberg
District #3 to implement the proposed change for accounting purposes.
|
2018-00346
|
11/19/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Owen Electric Cooperative, Inc.
|
2018-00354
|
11/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Columbia Kentucky and set forth in the Appendix to this Order are approved for billing beginning on November 29, 2018. 2. Within 20 days of the date of entry of this Order, Columbia Kentucky shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00366
|
11/19/2018
|
20181119_PSC_ORDER.pdf
|
2018-00257
|
11/19/2018
|
20181119_PSC_ORDER.pdf
|
2018-00258
|
11/20/2018
|
PSC_ORDER
Final Order Entered: 1. Salt River Electric's request to discontinue its Residential Marketing Rate is approved effective May 1, 2019.
2. Within 30 days of the date of entry of this Order, Salt River Electric shall notify all ETS customers in writing that the termination date of the ETS rate has been changed from January 1, 2019, to May 1, 2019, and provide detailed information concerning options available and what is and is not the customer's responsibility. Salt River shall also file one copy of the written notice with the Commission. 3. Within 20 days of the date of entry of this Order, Salt River Electric shall file with the Commission, using the Commission's electronic Tariff Filing System, two sets of revised tariff sheets: one reflecting the existing tariff sheets with the addition of a sentence at the end of the Availability of Service section stating that the tariff will be discontinued on May 1, 2019, and that they were approved pursuant to this Order; and one as
proposed, reflecting that the tariff sheets are reserved for future use, with an effective date of May 1, 2019, and that they were approved pursuant to this Order. 4. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00251
|
11/20/2018
|
PSC_ORDER
Final Order Entered: 1. The transfer of Joann Estates' wastewater collection system serving Wilmington Chiles and Joann Estates subdivisions to Paducah-McCracken Joint Agency, as described in their joint application, is approved. 2. Joint Applicants shall notify the Commission in writing of the transfer of assets within 10 days of the transfer's occurrence. 3. Within 60 days of the transfer's occurrence, Joann Estates shall file a financial and statistical report as required by 807 KRS 5:006, Section 4, for its operations for the period from January 1, 2018, to the date of transfer of ownership of the wastewater collection systems associated with Wilmington Chiles and Joann Estates subdivisions. 4. Any documents filed pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00347
|
11/20/2018
|
20181120_PSC_ORDER.pdf
|
2018-00281
|
11/20/2018
|
20181120_DATA_REQUEST.pdf
Data Request
|
2018-00281
|
11/20/2018
|
20181120_PSC_ORDER.pdf
|
2017-00328
|
11/21/2018
|
PSC_ORDER
Order Entered: 1. South 641 District shall publish, in the newspaper with the largest circulation in the county, a second notice of two vacancies on the South 641 District's Board of Commissioners, attached as Appendix hereto, and supply proof of publication to the
Commission within five days of publication. 2. Within 20 days of the date of publication, any person who wishes to apply as a candidate to fill the vacancies on South 641 Water District's Board of Commissioners shall submit to the Commission in writing the candidate's name, address, and telephone number, and reference Case No. 2017-00426. 3. The term of each commissioner appointed shall be four years pursuant to KRS 74.020, and the terms of current commissioners shall be extended to four years and staggered upon the filling of vacancies to be determined upon final order. 4. The Executive Director shall serve a copy of this Order upon the Calloway County Judge/Executive, the members of the Calloway County Fiscal Court, the Calloway County Attorney, and the South 641 District's Board of Commissioners.
|
2017-00426
|
11/21/2018
|
DATA_REQUEST
Commission Staff's Sixth Request for Information to Cawood Water District
|
2018-00068
|
11/21/2018
|
DATA_REQUEST01
Commission Staff's Fourth Request for Information to Black Mountain Utility District
|
2018-00068
|
11/21/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Columbia Gas of Kentucky, Inc.
|
2018-00356
|
11/26/2018
|
20181126_PSC_ORDER.pdf
|
2018-00322
|
11/26/2018
|
20181126_PSC_ORDER.pdf
|
2018-00323
|
11/26/2018
|
20181126_PSC_ORDER.pdf
|
2018-00357
|
11/27/2018
|
PSC_ORDER
Order Entered: 1. No later than February 25, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding P. R. Wastewater Management's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that P. R. Wastewater Management's financial condition supports a higher rate than P. R. Wastewater Management proposes or the assessment of an additional rate or charge not proposed in P. R. Wastewater Management's Application, P. R. Wastewater Management in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which P. R. Wastewater Management accounts for the depreciation of P. R. Wastewater Management's assets, P. R. Wastewater Management in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require P. R. Wastewater Management to implement the proposed change for accounting purposes.
|
2018-00339
|
11/27/2018
|
20181127_DATA_REQUEST.pdf
Data Request
|
2018-00377
|
11/28/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Rattlesnake Ridge Water District
|
2018-00371
|
11/28/2018
|
20181128_PSC_ORDER.pdf
|
2018-00369
|
11/28/2018
|
20181128_DATA_REQUEST.pdf
Data Request
|
2018-00230
|
11/29/2018
|
STAFF_REPORT
Notice of Filing od Commission Staff Report
|
2018-00260
|
11/29/2018
|
PSC_ORDER
Final Order Entered: 1. Breathitt District's application is denied as moot. 2. This case is dismissed and removed from the Commission's active docket.
|
2018-00355
|
11/29/2018
|
DATA_REQUEST
Commission Staff's Request for Information to Green-Taylor Water District
|
2018-00368
|
11/29/2018
|
20181129_PSC_ORDER.pdf
Order Entered: 1. The Commission opens this proceeding to conduct a formal review of its jurisdiction over EVCS. 2. Any initial comments shall be filed no later than March 1, 2019. 3. Any reply comments shall be filed no later than March 15, 2019.
|
2018-00372
|
11/29/2018
|
20181129_PSC_ORDER.pdf
|
2018-00369
|
11/30/2018
|
20181130_PSC_ORDER.pdf
Order Entered: 1. CMN's motion to submit the case on the written record is denied. 2. The hearing set for December 11, 2018, in this matter shall proceed as scheduled, and, if necessary, continue on December 12, 2018, unless the parties can reach a settlem
|
2018-00157
|
11/30/2018
|
20181130_PSC_ORDER.pdf
|
2018-00304
|
11/30/2018
|
20181130_DATA_REQUEST.pdf
Data Request
|
2018-00304
|
12/3/2018
|
STAFF_REPORT
Notice of Filing of Staff Report
|
2018-00145
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00216
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00217
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00218
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00219
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00220
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00221
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00222
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00223
|
12/3/2018
|
20181203_PSC_ORDER.pdf
|
2018-00335
|
12/4/2018
|
DATA_REQUEST
Commission Staff's Second Request for Information to East Kentucky Power Cooperative, Inc.
|
2018-00270
|
12/4/2018
|
PSC_ORDER
Final Order Entered: . Rattlesnake Ridge District is granted a CPCN for the proposed projects as submitted. 2. Rattlesnake Ridge District's proposed plan of financing is approved. 3. Rattlesnake Ridge District is authorized to issue $2,490,000 of Rattlesnake Ridge District Water District Waterworks Revenue Bonds at an interest rate to be equal to the lower of the rate in effect at the time of loan approval or the interest rate in effect at the time of closing, not to exceed 2.75 percent. 4. The proceeds from the promissory note shall be used only for the purposes specified in Rattlesnake Ridge District's application. 5. Rattlesnake Ridge District shall obtain approval from the Commission prior
to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Rattlesnake Ridge District may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Rattlesnake Ridge District rates for service. Rattlesnake Ridge District shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4.
|
2018-00371
|
12/4/2018
|
20181204_DATA_REQUEST.pdf
Data Request
|
2016-00142
|
12/5/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Gibson Connect, LLC
|
2018-00333
|
12/5/2018
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.13 per 1,000 gallons is approved. 2. The rates proposed by Boone District are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Boone District on and after December 31, 2018. 4. Within 20 days of the date of entry of this Order, Boone District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein. 5. This case is closed and removed from the Commission's docket.
|
2018-00386
|
12/5/2018
|
PSC_ORDER
Final Order Entered: 1. Blue Grass Energy's payment of Staff's proposed penalty and completion of remedial measures required by Staff is accepted and resolves all alleged violations of KRS 278.042 or 807 KAR 5:041, as well as any penalty that could be assessed under KRS 278.990(1), arising out of the August 29, 2018 incident. 2. Blue Grass Energy's payment of Staff's proposed penalty is not any admission by Blue Grass Energy that it violated any provision of KRS Chapter 278 or any administrative regulation promulgated pursuant thereto. 3. The Commission's investigation of the August 29, 2018 incident is closed. 4. This case is closed and removed from the Commission's docket.
|
2018-00391
|
12/5/2018
|
20181205_DATA_REQUEST.pdf
Data Request
|
2018-00369
|
12/5/2018
|
20181205_PSC_ORDER.pdf
|
2018-00358
|
12/5/2018
|
20181205_PSC_ORDER.pdf
|
2018-00291
|
12/5/2018
|
20181205_PSC_ORDER.pdf
|
2018-00380
|
12/5/2018
|
20181205_PSC_ORDER.pdf
|
2018-00341
|
12/6/2018
|
PSC_ORDER
Order Entered: Marshall Environmental shall appear on January 31, 2019, at 9:00 a.m., Eastern Standard Time, in Hearing Room 1 of the
Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, for the purpose of showing cause why it should not be subjected to the penalties of KRS 278.990 for its failure to comply with KRS 278.140 and 278.230(3) by not timely filing the required reports for the 2017 Calendar year, and for the penalties assessed, and subsequently suspended, in Case No. 2017-00032.
|
2018-00264
|
12/6/2018
|
20181206_PSC_ORDER.pdf
|
2018-00209
|
12/6/2018
|
20181206_DATA_REQUEST.pdf
Data Request
|
2018-00261
|
12/7/2018
|
PSC_ORDER
Order Entered: 1. EKPC's motion for confidential protection is granted. 2. The designated materials, with the exception of the material in Section 11.0 of the IRP, shall not be placed in the public record or made available for public inspection for a period of 15 years from the date of this Order, or until further Orders of this Commission. The material in Section 11.0 of the IRP shall not be placed in the public record or made available for public inspection for an indefinite period, or until further Orders of this Commission. 3. Use of the materials that were granted confidential treatment in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials granted confidential treatment become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, then EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection.
|
2015-00134
|
12/7/2018
|
20181207_PSC_ORDER.pdf
Order Entered: 1. CMN and Windstream East's Motion for Settlement Approval is hereby granted. 2. CMN and Windstream East's settlement is hereby approved as proposed. 3. The Commission shall retain jurisdiction, subject to limits on its statutory authority
|
2018-00157
|
12/7/2018
|
20181207_PSC_ORDER.pdf
|
2015-00264
|
12/10/2018
|
PSC_ORDER
Order Entered: 1. EKPC's Motion for Confidential Treatment filed on July 2, 2018, is granted. 2. The information regarding expected interest rates for which confidential treatment was sought meets the criteria for confidential treatment and, therefore, that information shall be exempt from public disclosure for a period of ten years, unless the Commission orders otherwise. 3. The use of the information granted confidential treatment herein shall comply with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the information granted confidential
treatment herein becomes publicly available or no longer qualifies for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials containing the information granted confidential treatment by this Order and the period during which the information has been granted confidential treatment has not run, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the information still falls within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection.
|
2018-00115
|
12/10/2018
|
PSC_ORDER
Final Order Entered: 1. Columbia Kentucky is authorized to issue and sell new Notes to NiSource Finance Corp. in an amount up to $40 million, and to issue and sell Stock to NiSource Gas Distribution in an amount up to $3,693,800, with the total amount of Notes and Stock
not to exceed $40 million. 2. Columbia Kentucky is authorized to issue, sell, and deliver the new Notes and Stock, upon the terms set forth in its application, through December 31, 2020. 3. Columbia Kentucky is authorized to use the proceeds arising from the issuance and sale of the Notes and Stock only for the lawful purposes set forth in its application. 4. Columbia Kentucky shall, within 30 days of the date of issuance, file with the Commission a statement setting forth the date or dates of issuance and terms of the new Notes authorized herein, including the interest rate, and the number of shares of Stock issued and sold at $25 par value per share.
|
2018-00356
|
12/10/2018
|
PSC_ORDER
Final Order Entered: 1. EKPC's request for a declaration confirming that its proposed publication of a single full-page-advertisement as customer notice on behalf of all of its distribution cooperatives in the 2019 edition of Kentucky Living is an acceptable form of notice
under 807 KAR 5:011, Section 8(2) is granted. 2. EKPC's request to deviate from the notice requirements of 807 KAR 5:011, Section 8{4)(b)-(d) is granted. 3. In the event the February 2019 edition of Kentucky Living is delivered after the revised DSM tariffs have been filed, EKPC shall notify the Commission as soon as practicable and file a formal application requesting an appropriate deviation from the
relevant requirement of 807 KAR 5:011, Section 8(2) regarding the timing of the publication of the notice.
|
2018-00404
|
12/10/2018
|
20181210_PSC_ORDER.pdf
|
2018-00156
|
12/10/2018
|
20181210_PSC_ORDER.pdf
|
2016-00370
|
12/10/2018
|
20181210_PSC_ORDER.pdf
|
2016-00371
|
12/10/2018
|
20181210_PSC_ORDER.pdf
|
2018-00358
|
12/11/2018
|
PSC_ORDER
Order Entered: 1. Within 45 days of the date of entry of this Order, a pilot program is established for the purposes of reviewing and streamlining the rate case procedure for Distribution Cooperatives subject to the Commission's jurisdiction. 2. Distribution Cooperatives seeking to utilize the streamlined procedure shall follow the procedures and conform their applications to the requirements listed in Appendix A to this Order. 3. A Distribution Cooperative approved for a streamlined rate case is granted deviation from 807 KAR 5:001, Section 12(1 )(a). 4. A Distribution Cooperative approved for a streamlined rate case is granted deviation from the following sections of 807 KAR 5:001, Section 16: a. (1)(b)(2): certified copy of certificate of assumed name; b. (4)(c): written testimony or statement that utility will not use a witness if the rate increase is less than $5,000,000; c. (4)(j): current chart of accounts; d. (4)(k): current auditor's report; e. (4)(1): most recent FERC report; f. (4)(m): most recent FERC financial reports; g. (4)(n): latest depreciation study if the depreciation schedule on file with the Commission is the most recent version h. (4)(o): list of computer software programs, and models; i. (4)(p) prospectus of most recent stock or bond offering; j. (4)(q): annual reports over the two most recent years; k. (4)(r): monthly managerial reports for the 12-month test period I. (4)(s): Form 10-K or Form 8-K from last two years; m. (4)(v): telecom specific data;
|
2018-00407
|
12/11/2018
|
20181211_PSC_ORDER.pdf
|
2018-00291
|
12/11/2018
|
20181211_PSC_ORDER.pdf
|
2018-00017
|
12/12/2018
|
PSC_ORDER
Order Entered: 1. EKPC's motion for confidential protection is granted. 2. The designated materials in EKPC's status report shall not be placed in the public record or made available for public inspection for ten years, or upon further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the designated materials granted confidential protection become publicly available or no longer qualifies for confidential
treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2015-00358
|
12/12/2018
|
PSC_ORDER01
Order Entered: 1. EKPC's petition for confidential protection for its Amended Application and the McNalley Testimony is granted. 2. The designated materials shall not be placed in the public record or made available for public inspection for ten years, or upon further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2015-00358
|
12/12/2018
|
PSC_ORDER
Final Order Entered: 1. BREC's request to phase out its remaining DSM programs, designated as DSM-8, DSM-11 , DSM-12, and DSM-04, by June 30, 2019, is approved. 2. Jackson Purchase Energy's and Meade County RECC's requests to modify and phase out their respective remaining DSM programs by June 30, 2019, are approved. 3. BREC's request for an Energy Use Education DSM Program is denied. 4. BREC's request to create a Low-Income Weatherization Assistance DSM Program at an annual budget not to exceed $250,000 is approved, subject to the filing of a tariff setting forth the program details, including a list of weatherization initiatives, support for the proposed initiatives, guidelines, and any contracts and agreements. 5. Within 20 days of the date of this Order, BREC shall file with the Commission , using the Commission's electronic Tariff Filing System, revised tariff sheets reflecting that its remaining DSM programs, designated as DSM-8, DSM-11, DSM-12, and DSM-04, shall terminate by June 30, 2019, and reflecting that they were approved pursuant to this Order. 6. Within 20 days of the date of this Order, Jackson Purchase Energy and Meade County RECC shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets reflecting that their remaining DSM programs shall terminate by June 30, 2019, and reflecting that they were approved pursuant to this Order.
|
2018-00236
|
12/12/2018
|
PSC_ORDER
Order Entered: 1. North Mclean District shall have up to 14 days from the date of this Order to file written comments with the Commission, if any, on the findings and recommendations contained in the attached Amended Staff Report and to request a hearing or an informal conference with Commission in this matter. 2. North Mclean District's failure to file with the Commission written objections to a finding contained in the Amended Staff Report within 14 days of this Order shall be deemed as agreement with that finding or recommendation, and a waiver of any right to object to that finding or recommendation. 3. If North Mclean District requests a hearing in this matter, it shall specifically identify in its written request for hearing all objections to the findings and recommendations set forth in the Amended Staff Report and shall provide a brief summary of testimony that it expects to present at the hearing. 4. Within 14 days of the date of this Order, North Mclean District shall file with the Commission in writing its position on adjusting its rates to the level shown in the Attachment to the Amended Staff Report. 5. If North Mclean District wishes to amend its application to request the rates shown in the Attachment to the Amended Staff Report, it should request such amendment in its response to the Amended Staff Report.
|
2018-00260
|
12/12/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 199 feet in height, with attached antennas, to be located at 146 Yocum Road, West Liberty, Morgan County, Kentucky. The coordinates for the proposed facility are North Latitude 37°58'48.084" by West Longitude 83°18'36.599". 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed , if any, in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00343
|
12/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by B&H are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered on and after January 1, 2019. 3. Within 20 days of the date of this Order, B&H shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00381
|
12/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after January 1, 2019.
2. Within 20 days of the date of entry of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
3. This case is closed and removed from the Commission's docket.
|
2018-00382
|
12/12/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Western Lewis-Rectorville District and set forth in the Appendix to this Order are approved for service rendered by Western Lewis-Rectorville District on and after January 1, 2019. 2. Within 20 days of the date of entry of this Order, Western Lewis-Rectorville District shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00383
|
12/12/2018
|
20181212_PSC_ORDER.pdf
|
2018-00316
|
12/12/2018
|
20181212_PSC_ORDER.pdf
|
2015-00264
|
12/12/2018
|
20181212_PSC_ORDER.pdf
|
2018-00064
|
12/13/2018
|
20181213_PSC_ORDER.pdf
|
2018-00369
|
12/13/2018
|
20181213_PSC_ORDER.pdf
|
2018-00370
|
12/13/2018
|
20181213_PSC_ORDER.pdf
|
2017-00328
|
12/13/2018
|
20181213_PSC_ORDER.pdf
|
2018-00040
|
12/13/2018
|
20181213_DATA_REQUEST.pdf
Data Request
|
2018-00294
|
12/13/2018
|
20181213_DATA_REQUEST.pdf
Data Request
|
2018-00295
|
12/13/2018
|
20181213_DATA_REQUEST.pdf
Data Request
|
2018-00230
|
12/14/2018
|
PSC_ORDER
Final Order Entered: 1. Bluegrass Cellular is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 250 feet in height, with attached antennas, and to be located at 149 Preston Loop, Gravel Switch, Kentucky. The coordinates for the proposed facility are North Latitude 37° 35' 34.44." by West Longitude 85° 02' 41.75".
2. Bluegrass Cellular shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00178
|
12/14/2018
|
PSC_ORDER
Order Entered: 1. Mr. Dawley's request for rehearing is denied. 2. This case is closed and removed from the Commission's docket.
|
2018-00259
|
12/14/2018
|
DATA_REQUEST
Commission Staff's Third Request for Information to Grayson Rural Electric Cooperative Corporation
|
2018-00272
|
12/14/2018
|
PSC_ORDER
Final Order Entered: 1. BREC's motion for an extension of time to file a new depreciation study is granted and denied in part. 2. BREC shall file a new depreciation study on or before June 1, 2020. 3. BREC's request to extend the deadline for the filing of a new depreciation
study until the earlier of April 25, 2021, or the filing of Big Rivers next general rate case is denied. 4. This matter is closed and removed from the Commission's docket.
|
2018-00313
|
12/14/2018
|
PSC_ORDER
Final Order Entered: 1. The 2018 Water Personnel Training Seminar, which the Commission conducted at the Public Service Commission, located at 211 Sower Boulevard, Frankfort, Kentucky, on December 4-5, 2018, is approved for a maximum of 12 credit hours of water
district management training and for a maximum of 12 credit hours of new water district commissioner training. 2. Within 20 days of the date of this Order, Commission Staff shall file into the post-case correspondence file for this case a list of the names of each attendee, his or
her water district, and the number of hours that he or she attended this training program. 3. This case is closed and removed from the Commission's docket.
|
2018-00408
|
12/14/2018
|
20181214_DATA_REQUEST.pdf
Data Request
|
2018-00263
|
12/14/2018
|
20181214_PSC_ORDER.pdf
|
2018-00248
|
12/14/2018
|
20181214_PSC_ORDER.pdf
|
2018-00379
|
12/14/2018
|
20181214_PSC_ORDER.pdf
|
2018-00295
|
12/14/2018
|
20181214_PSC_ORDER.pdf
|
2018-00281
|
12/17/2018
|
PSC_ORDER
Final Order Entered: 1. The boundary changes agreed upon by Shelby Energy and Blue Grass Energy for the Snook Property are approved. 2. Copies of the Revised Territorial Map, with the revisions signed by representatives of Shelby Energy and Blue Grass Energy on October 5, 2018, are attached hereto as an Appendix to this Order, 12 and as it reflects the agreed-upon amended territorial boundary of Shelby Energy and Blue Grass Energy, full-scale copies of the Revised Territorial Map shall be attached to the Commission's official territorial boundary map.
3. Within 20 days of the date of entry of this Order, Shelby Energy shall file with the Commission a geologic map at a scale of 1 :24,000 (1 inch = 2,000 feet) for the Polsgrove quadrangle, showing the revised territorial line with a note referencing the property and the date of the territorial agreement that has been signed by representatives of Shelby Energy and Blue Grass Energy. 4. Documents filed pursuant to ordering paragraph 3 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is closed and removed from the Commission's docket.
|
2018-00310
|
12/17/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Bluegrass are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered on and after January 2, 2019. 3. Within 20 days of the date of entry of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order. 4. This case is closed and removed from the Commission's docket.
|
2018-00399
|
12/17/2018
|
20181217_DATA_REQUEST.pdf
Data Request
|
2018-00291
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2014-00371
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2014-00372
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2018-00316
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2018-00390
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2018-00181
|
12/17/2018
|
20181217_PSC_ORDER.pdf
|
2018-00230
|
12/18/2018
|
PSC_ORDER
Order Entered: This case is closed and removed from the Commission's docket.
|
2017-00424
|
12/18/2018
|
PSC_ORDER
Order Entered: 1. The answer filed by Nolin RECC is rejected for filing. 2. Within ten days of the date of this Order, Nolin RECC shall have an attorney licensed to practice law in Kentucky file a signed answer.
|
2018-00345
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. Green-Taylor District is granted a CPCN to construct the proposed projects as set forth in its Application. 2. Green-Taylor District shall notify the Commission prior to performing any additional construction not expressly approved by this Order. 3. Any deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Green-Taylor District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Green-Taylor District shall file the encroachment permit with the Commission within ten days of the Kentucky Transportation Department approving the permit. 6. Green-Taylor District is authorized to enter the proposed Assistance Agreement with KIA and, under the terms of the Assistance Agreement, to borrow from KIA an amount not to exceed $1 ,963,390 to be repaid over a 20-year period at an interest rate of 1.75 percent per annum.
7. Green-Taylor District shall file with the Commission documentation of total costs of this project, including cost of construction and all other capitalized costs, within 60 days of date that construction authorized under this CPCN is substantially completed.
|
2018-00368
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Natural Energy and set forth in the Appendix to this Order are approved for final meter readings on and after January 1, 2019. 2. Within 20 days of the date of entry of this Order, Natural Energy shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00392
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville and set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after December 28, 2018. 2. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00393
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after January 1, 2019.
2. Within 20 days of the date of entry of this Order, Millennium shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00396
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Citipower on and after January 1, 2019. 3. Citipower shall submit all invoices received from Citigas and Citizens Gas
as part of all future GCR filings. 4. Within 20 days of the date of entry of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 5. This case is hereby closed and will be removed from the Commission's docket.
|
2018-00397
|
12/18/2018
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for final meter readings on and after January 1, 2019.
2. Within 20 days of the date of the entry of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 3. This case is closed and removed from the Commission's docket.
|
2018-00398
|
12/18/2018
|
PSC_ORDER
Order Entered: 1 . Gallatin District's proposed tariff revision is suspended for five months from January 1, 2019, up to and including May 31, 2019. 2. Requests for intervention shall be filed no later than January 10, 2019. Any party who submits a motion to intervene after January 10, 2019, and upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule, if any.
|
2018-00410
|
12/18/2018
|
PSC_ORDER
Order Entered: 1 . Ashland's proposed rates for wholesale service are suspended for five months from January 1, 2019, to May 31, 2019.
2. Cannonsburg District and Big Sandy District are made parties to this case. 3. Ashland, by counsel, shall enter an appearance in this proceeding within ten days of the date of this Order. The entry of appearance shall include the name, address, telephone number, fax number, and electronic mail address of counsel. Further, Ashland, with its entry of appearance, shall state its position on the use of electronic filing procedures and whether it has any objection to their use in this proceeding. 4. Big Sandy District, by counsel, shall enter an appearance in this proceeding within ten days of the date of this Order. The entry of appearance shall include the name, address, telephone number, fax number, and electronic mail address of counsel. Further, Big Sandy District, with its entry of appearance, shall state its position on the use of electronic filing procedures and whether it has any objection to their use in this proceeding. 5. Requests for intervention shall be filed no later than January 10, 2019. Any party who submits a motion to intervene after January 10, 2019, and upon a showing of
good cause is granted full intervention, shall accept and abide by the existing procedural schedule, if any.
|
2018-00415
|
12/18/2018
|
20181218_PSC_ORDER.pdf
|
2018-00394
|
12/19/2018
|
PSC_ORDER
Final Order Entered: This matter is hereby dismissed without prejudice.
|
2018-00308
|
12/19/2018
|
PSC_ORDER
Final Order Entered: 1. The hearing scheduled for January 8, 2019, at 1 p.m. Eastern Standard Time is canceled. 2. Any witness ordered to attend the January 8, 2019 hearing is excused. 3. This case is closed and removed from the Commission's docket.
|
2018-00367
|
12/19/2018
|
PSC_ORDER
Order Entered: 1. No later than February 26, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings regarding Cannonsburg District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Cannonsburg District's financial condition supports a higher rate than Cannonsburg District proposes or the assessment of an additional rate or charge not proposed in Cannonsburg District's Application, Cannonsburg District, in its responses to the Commission Staff Report, shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or recommend an additional rate or charge. 4. If Commission Staff recommends changes in the manner in which
Cannonsburg District accounts for the depreciation of Cannonsburg District's assets, Cannonsburg District, in its response to the Commission Staff Report, shall also state its position in writing on whether the Commission should require Cannonsburg District to implement the proposed change for accounting purposes.
|
2018-00376
|
12/19/2018
|
PSC_ORDER
Order Entered: 1. No later than March 6, 2019, Commission Staff shall file with the Commission and serve upon all parties of record a written report (Staff Report) containing its findings and recommendations regarding South Hopkins District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that South Hopkins District's financial condition supports a higher rate than South Hopkins District proposes, or the assessment of an additional rate or charge not proposed in South Hopkins District's Application, South Hopkins District, in its response to the Commission Staff Report, shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which South Hopkins District accounts for the depreciation of South Hopkins District's assets, South Hopkins District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require South Hopkins
District to implement the proposed change for accounting purposes.
|
2018-00387
|
12/19/2018
|
PSC_ORDER
Order Entered: 1. KRWA's Training Program scheduled to take place on December 27, 2018, is hereby conditionally approved and accredited for up to six hours of annual water district management training for water district commissioners seeking to satisfy the training requirements set forth in KRS 74.020(6) and (7). 2. KRWA's Training Program may not be used by water district commissioners seeking to satisfy any portion of the initial training requirement for water district commissioners required by KRS 74.020(8). 3. KAWA shall retain a record of all water district commissioners attending the Training Program. 4. No later than 30 days after the scheduled training program, KAWA shall
file with the Commission: a. A sworn statement attesting that the accredited instruction was performed, including a statement that the materials regarding each session were distributed as required by the Commission herein; b. A description of any changes in the presenters or purposed curriculum that occurred after the application; c. The name of each attending water district commissioner, his or her water district, number of hours he or she attended; and d. A copy of any written material given to water district commissioners attending sessions that was not previously provided to the Commission. 5. Upon receipt of materials identified in Paragraph No. 4 and provided there are no material changes to the program, the Commission shall issue a final order approving and accrediting the Training Program.
|
2018-00389
|
12/19/2018
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Valley Gas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after January 1, 2019. 3. Valley Gas's future GCR applications shall include the information required in finding paragraph 7.
4. Within 20 days of the date of entry of this Order, Valley Gas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
5. This case is closed and removed from the Commission's docket.
|
2018-00409
|
12/19/2018
|
20181219_PSC_ORDER.pdf
|
2018-00198
|
12/19/2018
|
20181219_PSC_ORDER.pdf
|
2018-00309
|
12/19/2018
|
20181219_PSC_ORDER.pdf
|
2018-00208
|
12/19/2018
|
20181219_PSC_ORDER.pdf
|
2018-00378
|
12/20/2018
|
PSC_ORDER
Final Order Entered: 1 . The findings contained in the Staff Report are adopted and incorporated by reference into this Order as if fully set out herein. 2. The general service rates proposed by North Mclean are denied. 3. The rates set forth in the Appendix to this Order are approved for services rendered by North Mclean on and after the date of this Order. 4. Within 20 days of the date of this Order, North Mclean shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and their effective date, and stating that the rates and charges were authorized by this Order. 5. This case is hereby closed and will be removed from the Commission's docket.
|
2018-00260
|
12/20/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Viasat Carrier Services, Inc.
|
2018-00330
|
12/20/2018
|
20181220_PSC_ORDER.pdf
|
2015-00283
|
12/20/2018
|
20181220_PSC_ORDER.pdf
|
2018-00304
|
12/20/2018
|
20181220_DATA_REQUEST.pdf
Data Request
|
2018-00261
|
12/20/2018
|
20181220_PSC_ORDER.pdf
|
2018-00017
|
12/20/2018
|
20181220_DATA_REQUEST.pdf
Data Request
|
2018-00208
|
12/21/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Knott County Water and Sewer, Inc.
|
2018-00353
|
12/21/2018
|
PSC_ORDER
Final Order Entered: 1. Mountain District is granted a CPCN for the proposed projects as submitted. 2. Mountain District's proposed plan of financing is approved. 3. Mountain District is authorized to issue $3,653,000 of Mountain District's Sewer System Revenue Bonds at an interest rate to be equal to the lower of the rate in effect at the time of loan approval or the interest rate in effect at the time of closing, not
to exceed 2.50 percent. 4. The proceeds from the promissory note shall be used only for the purposes specified in Mountain District's application. 5. Mountain District shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Mountain District may use such surplus to construct additional plant facilities if RD approves of the use and the additional
construction will not result in a change in Mountain District rates for service. Mountain District shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4. 7. Mountain District shall file with the Commission documentation of the total
costs of this project, including the cost of construction and all other capitalized costs, (e.g., engineering, legal, and administrative) within 60 days of the date that construction is substantially completed.
|
2018-00400
|
12/21/2018
|
20181221_PSC_ORDER.pdf
|
2018-00042
|
12/21/2018
|
20181221_PSC_ORDER.pdf
|
2018-00040
|
12/21/2018
|
20181221_PSC_ORDER.pdf
|
2018-00377
|
12/21/2018
|
20181221_PSC_ORDER.pdf
|
2018-00276
|
12/21/2018
|
20181221_DATA_REQUEST.pdf
Data Request
|
2018-00281
|
12/21/2018
|
20181221_PSC_ORDER.pdf
|
2018-00208
|
12/26/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 270 feet in height, with attached antennas, to be located at 800 Towery Cemetery Road, Princeton, Caldwell County, Kentucky. The coordinates for the proposed facility are North Latitude 37°17'18.56" by 87°54'10.68" West Longitude. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period
of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00188
|
12/26/2018
|
PSC_ORDER
Final Order Entered: 1. AT&T is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 370 feet in height, with attached antennas, and to be located at Kentucky Highway 30 E, Guage, Kentucky. The coordinates for the proposed facility are North Latitude 37° 35' 49.45." by West Longitude 83° 10' 59 .58". 2. AT&T shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents fi led, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission's docket.
|
2018-00361
|
12/26/2018
|
20181226_DATA_REQUEST.pdf
Data Request
|
2018-00369
|
12/27/2018
|
DATA_REQUEST
Commission Staff's First Request for Information to Duke Energy Kentucky, Inc.
|
2018-00416
|
12/27/2018
|
PSC_ORDER
Order Entered: 1. Kentucky Power's proposed revisions to Tariff C.S. - Coal, Tariff C.S. - l.R.P., and Tariff - E.D.R. are suspended for five months, up to and including June 19, 2019. 2. Kentucky Power's request for a deviation from 807 KAR 5:011, Section 8(2)(b)(3), which requires, among other things, that notice be published for three consecutive weeks, is granted. 3. The information requested in the Appendix to this Order is due no later than 14 days from the date of this Order.
|
2018-00426
|