Kentucky Public Service Commission


View Case Filings for: 2022-00098


Case Number:2022-00098
Service Type:Electric
Filing Date:4/1/2022
Category:Regular
Utilities:

East Kentucky Power Cooperative, Inc.


Electronic Case
Case Nature:

ELECTRONIC 2022 INTEGRATED RESOURCE PLAN OF EAST KENTUCKY POWER COOPERATIVE, INC.









Case Filings
FilingDocuments
8/16/2023 3:15:37 PM

Final Order Entered: 1. EKPC shall file its next IRP no later than April 1, 2025. 2. This case is closed and removed from the Commission’s docket.


8/7/2023 4:04:54 PM

Order Entered: 1. EKPC’s August 19, 2022 motion for confidential treatment is granted in part and denied in part. 2. EKPC’s September 20, 2022 motion for confidential treatment is granted. 3. EKPC’s December 16, 2022 motion for confidential treatment is granted in part and denied in part. 4. EKPC’s January 20, 2023 motion for confidential treatment is denied. 5. The designated material described in EKPC’s August 19, 2022 amended motion for confidential treatment and December 16, 2022 amended motion for confidential treatment is granted confidential treatment except for the first four rows of Table 8-2 on page 163 of EKPC’s IRP. 6. Except as noted below in paragraph 7, the designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for ten years or until further Order of this Commission. 7. The designated material in EKPC’s December 16, 2022 amended motion for confidential treatment containing EKPC’s map of its transmission lines on page 219 of EKPC’s IRP and EKPC’s August 19, 2022 amended motion for confidential treatment consisting of documents filed in response to Joint Intervenors’ First Request, Item 32, shall not be placed in the public record or made available for public inspection for an indefinite period.


5/18/2023 11:43:19 AM

20230518_PSC Notice of Filing Hearing Documents.pdf


3/31/2023 7:18:42 PM

Joint Intervenors Response to Commission Staff’s Report on the 2022 Integrated Resource Plan of East Kentucky Power Cooperative, Inc.


Ashley Wilmes Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

3/31/2023 3:48:37 PM

Sierra Clubs Comments Regarding Commission Staffs Report


Joe F. Childers Sierra Club

2023.3.31_post_report_comments_FINAL.pdf

Sierra Club's Comments Regarding Commission Staff's Report

3/31/2023 11:37:10 AM

East Kentucky Power Cooperative, Inc.’s (“EKPC”) Comments on Commission Staffs report in the above-styled case.


Chris Adams East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Read First _ Cover Letter

3/16/2023 4:27:55 PM

Commission HEREBY ORDERS, nunc pro tunc, that: 1. The following ordering paragraphs are stricken from the Commission’s March 8, 2023 Order: 2. Any party desiring to file comments regarding the Commission Staff’s Report on EKPC’s 2022 IRP shall do so on or before March 21, 2023. 3. EKPC shall file comments with respect to the Commission Staff’s Report and in response to Intervenor comments on or before April 4, 2023 2. The ordering paragraphs in the Commission’s March 8, 2023 Order are amended as follows: 2. Any party desiring to file comments regarding the Commission Staff’s Report on EKPC’s 2022 IRP shall do so on or before March 31, 2023. 3. All other provisions of the Commission’s March 8, 2023 Order that are not in conflict with the terms of this Order shall remain in effect.


3/9/2023 2:44:27 PM

Order Entered: 1. The Commission Staff’s Report on EKPC’s 2022 IRP represents the final substantive action in this matter. 2. Any party desiring to file comments regarding the Commission Staff’s Report on EKPC’s 2022 IRP shall do so on or before March 21, 2023. 3. EKPC shall file comments with respect to the Commission Staff’s Report and in response to Intervenor comments on or before April 4, 2023. 4. An Order closing this case and removing it from the Commission docket shall be issued after the period for comments on the Commission Staff’s Report has expired.


2/28/2023 4:01:52 PM

Order Entered: 1. The procedural schedule established on December 16, 2022, is amended. 2. The amended procedural schedule set forth in the Appendix to this Order shall be followed. 3. All provisions of the Commission’s Order of December 16, 2022, in conflict with the provisions of this Order are vacated. All other provisions of the December 16, 2022 Order not in conflict shall remain in effect.


2/17/2023 4:23:53 PM

Joint Intervenors Response to East Kentucky Power Cooperative, Inc.’s Supplemental Post-Hearing Comment on the 2022 Joint Integrated Resource Plan


Ashley Wilmes Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

2022-00098_EKPC_2022_IRP_Joint_Intervenors_Response_to_PH_Cmts.pdf

Joint Intervenors' Response to EKPC's Supplemental Post-Hearing Comment on the 2022 Joint Integrated Resource Plan

2/17/2023 10:57:27 AM

Reply Post Hearing Comments


Chris Adams East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Read First - Cover Letter

2/3/2023 5:54:06 PM

Supplemental post-hearing comments by Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association


Ashley Wilmes entuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

Combined_Attachments_to_Joint_Intervenors_Post_Hearing_Comments.pdf

Combined Attachments to Post Hearing Comments by Joint Intervenors

Post_Hearing_Comments_of_Joint_Intervenors.pdf

Post-hearing comments by Joint Intervenors

Read_First_2023-02-03.pdf

Read First (February 23, 2023)

2/3/2023 1:08:03 PM

Post Hearing Comments


Chris Adams East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Read First - Cover Letter

1/20/2023 1:21:27 PM

EKPC responses to Commission Staff and Joint Intervenors Post Hearing Data Requests.


Chris Adams East Kentucky Power Cooperative, Inc.

Joint_Intervenors_DR3_IRP_Compiled.pdf

Responses to Joint Intervenors Post Hearing Data Request

Motion_for_Confidential_Treatment_-_230120.pdf

Motion for Confidential Treatment

Read_1st.pdf

Read First - Cover Letter

Responses_to_Staff_DR3_Compiled.pdf

Responses to Staffs Post Hearing Data Request

12/22/2022 2:45:13 PM

Post-Hearing Data Requests of Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association


Tom FitzGerald Joint Intervenors Kentuckians for the Commonwealth, Mountain Association, and Kentucky Solar Energy Society

2022-00098_Joint_Intervenors_Post-Hearing_Requests.pdf

(Post-Hearing Data Requests of Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association)

Read_First_4.pdf

(Read First)

12/22/2022 11:00:05 AM

Data Request


12/16/2022 6:53:10 PM

Amended Motion for Confidential Treatment


L. Allyson Honaker East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Cover Letter

Redacted_Page_163_IRP_Redacted.pdf

Redacted Table 8-2 IRP page 163 - updated

12/16/2022 10:33:06 AM

Order Entered: 1. Post-hearing data requests to EKPC, if any, shall be filed on or before December 22, 2022. 2. Responses to post-hearing data requests shall be filed on or before January 20, 2023. 3. Any party shall file supplemental post-hearing comments, if any, on or before February 3, 2023. 4. Any party shall file their response, if any, to other parties’ supplemental post-hearing comments on or before February 17, 2023. 5. Commission Staff’s Report on EKPC’s 2022 Integrated Resource Plan shall be filed into the record no later than February 28, 2023. 6. Any party desiring to file written comments regarding Commission Staff’s Report shall do so no later than March 21, 2023. 7. The June 1, 2022 Order in this matter shall remain in effect except as stated herein.


12/12/2022 2:02:25 PM

Order Entered: 1. Cassandra McCrae and Thomas Cmar are admitted pro hac vice for the purpose of representing Joint Intervenors in association with Ashley Wilmes in the above- styled proceeding, provided that Ashley Wilmes or another member of the Kentucky Bar Association acts as co-counsel and is present at all proceedings before this Commission. 2. Cassandra McCrae and Thomas Cmar shall comply with the rules of the Commission and the Kentucky Bar Association.


12/9/2022 5:28:58 PM

East Kentucky Power Cooperative, Inc.’s (“EKPC”) Supplemental Responses to Commission Staff’s First Request for Information Nos. 3 and 4 and The Attorney General’s Second Request for Information No. 40.


Chris Adams East Kentucky Power Cooperative, Inc.

EKPC_Supplemental_Responses_to_AG_DR2_2022-00098.pdf

EKPC Supplemental Responses to No. 40 to Attorney General's Second Request for Information

EKPC_Supplemental_Responses_to_PSC_DR1_2022-00098.pdf

EKPC Supplemental Responses to Nos. 3 and 4 to Staff's First Request for Information

12/7/2022 6:22:28 PM

Joint Intervenors Motion to Admit Thomas Cmar Pro Hac Vice


Ashley Wilmes Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

PHV_Motion_(Cmar)_2022-00098.pdf

Motion to Admit Thomas Cmar Pro Hac Vice

Read_First_2022-12-07_(2).pdf

Read First Cover Letter

12/7/2022 6:20:13 PM

Join Intervenors Motion to Admit Cassandra McCrae Pro Hac Vice


Ashley Wilmes Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

PHV_Motion_(McCrae)_2022-00098.pdf

Motion to Admit Cassandra McCrae Pro Hac Vice

Read_First_2022-12-07.pdf

Read First Cover Letter

12/7/2022 4:18:03 PM

Order Entered: 1. Joint Intervenors are granted leave to file the corrected report prepared by Energy Futures Group in response to EKPC’s 2022 IRP. 2. The redacted version of the corrected report shall be deemed filed as of the date of this Order. 3. Joint Intervenors shall confidentially file an unredacted version of the corrected report, both with and without redlines showing any revisions, within three business days of the date of service of this Order.


12/7/2022 2:44:36 PM

EKPCs Proof of Publication of Hearing Notice


Chris Adams East Kentucky Power Cooperative, Inc.

Cover_Letter_-_Proof_of_Hearing_Notice.pdf

Cover Letter - Proof of Hearing Notice

Notarized_Proof_of_Hearing_Noticed_Published.pdf

Proof of Hearing Notice Published and Notarized

12/5/2022 1:39:44 PM

Order Entered: 1. Kristin A. Henry is admitted pro hac vice for the purpose of representing Sierra Club in association with Joe F. Childers in the above-styled proceeding, provided that Joe F. Childers or another member of the Kentucky Bar Association acts as co- counsel and is present at all proceedings before this Commission. 2. Kristin A. Henry shall comply with the rules of the Commission and the Kentucky Bar Association.


12/2/2022 12:55:28 PM

Notice of Substitution of Witness


L. Allyson Honaker East Kentucky Power Cooperative, Inc.

Notice_of_Substitution_of_Witness.pdf

Notice of Substitution of Witness for Hearing

Read_1st.pdf

Cover Letter

12/1/2022 3:44:48 PM

EKPCs Request for Publication of Hearing Notice.


Chris Adams East Kentucky Power Cooperative, Inc.

Cover_Letter_-_Request_for_Hearing_Notice.pdf

Cover Letter - Request for Hearing Notice to be Published.

Proof_of_Request_for_Publication_of_Notice_of_Public_Hearing.pdf

Request for Hearing notice to be Published with Proof for Papers.

11/1/2022 3:49:09 PM

Motion for Leave to File a Corrected Expert Report in Support of their Initial Comment on East Kentucky Power Cooperative Inc.’s 2022 Integrated Resource Plan


Ashley Wilmes Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

Exhibit_A.pdf

(Exhibit A, Proposed Corrected Report, Redacted)

Exhibit_B.pdf

(Exhibit B, Proposed Corrected Report, Redacted and Redlined)

Motion_for_Leave.pdf

(Motion for Leave to Filed Corrected Expert Report)

11/1/2022 3:41:39 PM

EKPCs Response Comments


L. Allyson Honaker East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Cover Letter

10/11/2022 10:33:19 PM

Joint Intervenors’ Initial Comment on East Kentucky Power Cooperative Inc.’s 2022 Integrated Resource Plan


Ashley Wilmes Joint Intervenors, Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

2022-00098_EKPC_2022_IRP_EFG_Report_Public_Redacted_(metadata_removed).pdf

Joint Intervenors’ Initial Comment on EKPC's 2022 Integrated Resource Plan

2022-00098_EKPC_2022_IRP_Joint.Intervenors.Initial.Comment_.Final_-REDACTED.pdf

Exhibit 1 to Joint Intervenors’ Initial Comment on EKPC's 2022 Integrated Resource Plan

10/11/2022 4:00:36 PM

Attorney Generals Comments


Angela M. Goad Office of the Attorney General

22.10.11_Attorney_Generals_Comments.pdf

Attorney General's Comments

9/20/2022 4:49:53 PM

EKPC Responses to NUCOR Second Request for Information


Chris Adams East Kentucky Power Cooperative, Inc.

9/20/2022 4:46:41 PM

EKPC Responses to Joint Intervenors Second Request for Information


Chris Adams East Kentucky Power Cooperative, Inc.

Response_32_-_GHG_CH4_Emissions.xlsx

Attachment to Response 32

9/20/2022 4:44:43 PM

Responses to Attorney Generals Second Information Request to East Kentucky Power


Chris Adams East Kentucky Power Cooperative, Inc.

AG_DR2_EKPC_Response_9-20-22.pdf

EKPC Responses to AG Second Information Request

9/20/2022 4:16:35 PM

Responses to Staffs Second Information Request to East Kentucky Power Cooperative, INC. Dated August 26, 2022


Chris Adams East Kentucky Power Cooperative, Inc.

PSC_DR2_8-26-22_EKPC_Responses_dated_9-20-22.pdf

Responses to Staff Second Information Request

PSC_Response_16f_-_IRP_Page_171_Revised.pdf

Attachment to Request 16F - IRP Page 171

9/20/2022 4:13:29 PM

Motion for Confidential Treatment in regards to EKPCs Responses to Supplemental Request for Information from Commission Staff, the Attorney General, the Joint Intervenors and Nucor along with a Motion for Confidential Treatment for certain of these respons


Chris Adams East Kentucky Power Cooperative, Inc.

_1_Read_1st.pdf

Read First Cover Letter

_2_Motion_for_Confidential_Treatment_-_220919.pdf

Motion for Confidential Treatment

8/30/2022 8:17:38 PM

Supplemental Data Requests of Joint Intervenors, Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association


Supplemental Data Requests of Joint Intervenors, Kentuckians for Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

8/30/2022 3:41:08 PM

OAG Second Request for Information


Angela M. Goad Office of the Attorney General

8/30/2022 3:02:22 PM

SUPPLEMENTAL DATA REQUESTS OF NUCOR STEEL GALLATIN TO EAST KENTUCKY POWER COOPERATIVE, INC.


Michael L Kurtz Nucor Steel Gallatin

KPSC_Ltr_-_2022-00098.pdf

Cover Ltr - Read 1st

8/26/2022 8:34:15 AM

Data Request


8/19/2022 10:12:32 AM

Amended Motion for Confidential Treatment


L. Allyson Honaker East Kentucky Power Cooperative, Inc.

7/29/2022 9:18:39 PM

Notice of Substitution of Counsel


L. Allyson Honaker East Kentucky Power Cooperative, Inc.

Read_1st.pdf

Cover Letter

7/29/2022 4:02:55 PM

EKPC Responses to Joint Intervenors Data Request 1


Chris Adams East Kentucky Power Cooperative, Inc.

Joint_Intervener_Response_1_-_Figure_1-1,_Figure_1-2,_Figure_1-3.xlsx

Response to Joint Intervenors Request 1 - Excel

Joint_Intervenor_Response_1_-_Tables_3-1_-_3-21.xlsx

Response to Joint Intervenors Request 1 - Excel

Joint_Intervenor_Response_11_and_12_-_OM_Form_7.xlsx

Response to Joint Intervenors Request 11 and 12 - Excel

Joint_Intervenor_Response_29.xlsx

Response to Joint Intervenors Request 29 - Excel

Joint_Intervenor_Response_3_-_2023-2037_Load_Forecast_Work_Plan.pdf

Response to Joint Intervenors Request 3 - PDF

Joint_Intervenor_Response_31a_-_Project_List_2022_2031.xlsx

Response to Joint Intervenors Request 31a - Excel

Joint_Intervenor_Response_39.pdf

Response to Joint Intervenors Request 39 - PDF

Joint_Intervenor_Response_56_-_2021_EKPC_DMS_DLC_Annual_Report.pdf

Response to Joint Intervenors Request 56 - PDF

Joint_Intervenors_DR1_2022-00098_-_To_be_filed_-Final.pdf

EKPC Responses to Joint Intervenors DR1

7/29/2022 3:58:15 PM

EKPC Responses to Sierra Club Data Request One


Chris Adams East Kentucky Power Cooperative, Inc.

Sierra_Club_DR1_-_Response_12.xls

Response to Sierra Club DR1 Response 12

Sierra_Club_DR1_Response_13__-_REDACTED.xlsx

Response to Sierra Club DR1 Request 13 - Excel

Sierra_Club_DR1_Response_14a_-_Capital_Expenditures.xlsx

Response to Sierra Club DR1 Request 14a - Excel

Sierra_Club_DR1_Response_16.xlsx

Response to Sierra Club DR1 Request 16 - Excel

Sierra_Club_DR1_Response_3_-_IRP_Table_1-4.xlsx

Response to Sierra Club DR1 Request 3 - Excel

Sierra_Club_DR1_Response_3_-_IRP_Table_8(2)(a).xlsx

Response to Sierra Club DR1 Request 3 - Excel

Sierra_Club_DR1_Response_3_-_IRP_Tables_4-1_thru_4-6.pdf

Response to Sierra Club DR1 Request 3 - PDF

Sierra_Club_DR1_Response_3_-_IRP_Tables_8-3_8-6_8-7.xlsx

Response to Sierra Club DR1 Request 3 - Excel

Sierra_Club_DR1_Response_3_-_IRP_Tables_8-8_thru_8-11.xlsx

Response to Sierra Club DR1 Request 3 - Excel

7/29/2022 3:37:41 PM

EKPC Response to Attorney General Data Request 1


Chris Adams East Kentucky Power Cooperative, Inc.

AG_DR1_2022-00098_-_To_be_filed_-_Final.pdf

EKPC Responses to Attorney General Data Request 1

AG_Response__31_-_Project_List_2022_2031.xlsx

Response to AG Request 31 - Excel File

AG_Response_23a_-_Capital_Improvement_Plan.pdf

Response to AG Request 23a - PDF

7/29/2022 3:32:27 PM

EKPCs Responses to Requests for Information from Commission Staff and Motion for Confidential Treatment


Chris Adams East Kentucky Power Cooperative, Inc.

Motion_for_Confidential_Treatment_-_220729.pdf

Motion for Confidential Treatment for Responses to Commission Staff, Attorney General, Sierra Club and Joint Intervenors

PSC_DR_42_-_Collaborative_Presentations.zip

Response to PSC DR1 Request 42 - Zip File

PSC_DR32.a_-_Owner-member_Forecast_Reports.zip

Response to PSC DR1 Request 32a - Zip File

Read_1st_-_220729.pdf

Read First - Cover Letter

7/28/2022 8:00:06 AM

Order Entered: 1. EKPC’s motion for extension of time is granted. 2. EKPC shall submit its responses to all initial requests for information no later than July 29, 2022. 3. The procedural schedule set forth in the Appendix to this Order shall be followed with respect to the prehearing procedural events identified therein. 4. The June 1, 2022 Order in this matter shall remain in full force and effect except as stated herein.


7/15/2022 7:05:03 PM

Joint Representation Agreement between Kentucky Resources Council and Mountain Association, Kentuckians for the Commonwealth, and Kentucky Solar Energy Society, For The 2022 Joint Integrated Resource Plan of East Kentucky Power Cooperative, Inc.


Ashley Wilmes Kentucky Resources Council

EKPC_Representation_Agreement_KRC.pdf

(Joint Representation Agreement between Kentucky Resources Council and Mountain Association, Kentuckians for the Commonwealth, and Kentucky Solar Energy Society)

Read_First_2022-07-15.pdf

(Read First, July 15, 2022)

7/14/2022 8:51:51 PM

Motion for Enlargement of Time to File Responses to Information Requests


David S. Samford East Kentucky Power Cooperative, Inc.

Letter_to_L._Bridwell_-_220714.pdf

Read 1st - Cover Letter

7/12/2022 11:26:36 AM

EKPCs Notarized Affidavit and tear sheets demonstrating the publication of the Notice of Filing.


Chris Adams East Kentucky Power Cooperative, Inc.

2022-0098_-_Proof_of_Publication_of_Notice_of_Filing.pdf

Proof of Publication - Notice of Filing

7/1/2022 3:20:11 PM

Sierra Clubs Motion to Admit Kristin Henry Pro Hac Vice


JOE F CHILDERS Sierra Club

2022.6.30_KBA_PHV_KHenry_receipt.pdf

Sierra Club's Pro Hac Vice Receipt KBA for Kristin Henry

2022.7.1_K_Henry_PHV_motion.pdf

Sierra Club's Motion to Admit Kristin Henry Pro Hac Vice

7/1/2022 12:58:14 PM

Statement of Joint Intervenors Regarding Receipt of Electronic Transmissions


Ashley Wilmes Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association

Read_First_3.pdf

(Read First)

Statement_Regarding_Receipt_of_Electronic_Transmissions.pdf

(Statement of Joint Intervenors Regarding Receipt of Electronic Transmissions)

6/30/2022 11:25:51 PM

Initial Data Requests of Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association Propounded To East Kentucky Power Cooperative, Inc


Tom FitzGerald Joint Intervenors Mountain Association, Kentuckians for the Commonwealth, and Kentucky Solar Energy Society

Joint_Intervenors_Initial_Data_Requests_of_EKPC.pdf

(Initial Data Requests of Joint Intervenors Kentuckians for the Commonwealth, Kentucky Solar Energy Society, and Mountain Association Propounded To East Kentucky Power Cooperative, Inc.)

Read_First_2.pdf

(Read First)

6/30/2022 10:34:44 AM

Sierra Clubs Initial Requests for Information to Company


JOE F CHILDERS Sierra Club

2022.6.30_SCs_Initial_RFI_to_EKPC.pdf

Sierra Club's Initial Requests for Information to Company

6/30/2022 8:57:11 AM

Nucor Steel Gallatin Written Statement


Michael L Kurtz Nucor Steel Gallatin

KPSC_Ltr_-_2022-00098.pdf

Cover Ltr - Read 1st

6/29/2022 3:56:26 PM

OAG First Request for Information


Angela M. Goad Office of the Attorney General

6/28/2022 3:19:35 PM

Data Request


6/27/2022 10:05:39 AM

Sierra Clubs Post-Intervention Statement


JOE F CHILDERS Sierra Club

2022.6.27_SC_Post-Intervention_Statement.pdf

Sierra Club's Post-Intervention Statement

6/24/2022 3:11:43 PM

Order Entered: 1. The motion of Sierra Club to intervene is granted. 2. Sierra Club is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Sierra Club shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Sierra Club shall adhere to the procedural schedule set forth in the Commission’s June 1, 2022 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Sierra Club shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


6/24/2022 3:02:04 PM

Order Entered: 1. The motion of Joint Movants to intervene is granted. 2. Joint Movants are entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Joint Movants shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Joint Movants shall adhere to the procedural schedule set forth in the Commission’s June 1, 2022 Order and as amended by subsequent Orders.


6/21/2022 4:32:02 PM

Order Entered: 1. Nucor’s motion of to intervene is granted. 2. Nucor is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Nucor shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Nucor shall adhere to the procedural schedule set forth in the Commission’s June 1, 2022 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Nucor shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding shall be served.


6/21/2022 4:23:40 PM

Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General is entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission’s regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. The Attorney General shall adhere to the procedural schedule set forth in the Commission’s June 1, 2022 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


6/9/2022 6:24:14 PM

Joint Motion of Kentuckians for the Commonwealth, Kentucky Solar Energy Society, Inc., and Mountain Association for Intervention As Joint Intervenors


Tom FitzGerald Joint Intervenors Mountain Association, Kentuckians for the Commonwealth, and Kentucky Solar Energy Society

Joint_Motion_For_Intervention_Final.pdf

(Joint Motion of Kentuckians for the Commonwealth, Kentucky Solar Energy Society, Inc., and Mountain Association for Intervention As Joint Intervenors)

Read_First_1.pdf

(Read First)

6/3/2022 2:29:52 PM

Sierra Clubs Motion to Intervene


Joe F. Childers Sierra Club

6/1/2022 3:39:48 PM

Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021, Order in Case No. 2020-00085¹ regarding filings with the Commission. 3. As set forth in 807 KAR 5:001, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings. Therefore, any person requesting to intervene in a Commission proceeding must state with specificity the person’s special interest that is not otherwise adequately represented, or the issues and facts that the person will present that will assist the Commission in fully considering the matter.


5/17/2022 3:20:46 PM

East Kentucky Power Cooperative, Inc.’s Notice of Filing to replace a page in the April 1, 2022 Integrated Resource Plan filing that included a table with incorrect data.


Chris Adams East Kentucky Power Cooperative, Inc.

174.pdf

Revised Table for Integrated Resource Plan filing that included a table with incorrect data.

4/25/2022 3:12:23 PM

Nucor Steel Gallatins Motion to Intervene


Michael L Kurtz Nucor Steel Gallatin

Intervention__2022-00098.pdf

Nucor Steel Gallatin Motion to Intervene

KPSC_Ltr_-_2022-00098.pdf

Cover Ltr - Read 1st

4/7/2022 4:08:11 PM

OAG Motion to Intervene


Angela M. Goad Office of the Attorney General

4/1/2022 9:00:58 AM

Enclosed, please find a copy of the 2022 Integrated Resource Plan of East Kentucky Power Cooperative, Inc. (“EKPC”) and a Motion for Confidential Treatment concerning certain information contained therein.


Chris Adams

2022-00098_-_REDACTED_EKPC_2022_IRP.pdf

EKPC's 2022 Integrated Resource Plan dated 04-01-22

2022-00098_-_REDACTED_EKPC_2022_IRP_-_Technical_Appendix_-_Vol_1_-_Load_Forecast.pdf

EKPC's Load Forecast Technical Appendix (Volume 1) to its 2022 Integrated Resource Plan dated 04-01-22

2022-00098_-_REDACTED_EKPC_2022_IRP_-_Technical_Appendix_-_Vol_2_-_DSM.pdf

EKPC's Demand Side Management Technical Appendix (Volume 2) to its 2022 Integrated Resource Plan dated 04-01-22

Motion_for_Confidential_Treatment_-_04-01-22.pdf

Motion for Confidential Treatment for EKPC's 2022 Integrated Resource Plan dates 04-01-22

Read_1st_-_Cover_Letter_-_04-01-22.pdf

EKPC's Cover Letter dated 04-01-22 to its 2022 Integrated Resource Plan

3/21/2022 11:39:54 AM

20220321_PSC Acknowledgment Letter.pdf


3/21/2022

East Kentucky Power Cooperative, Inc. Notice of Intent to File Application for 2022 Integrated Resource Plan Using Electronic Filings Procedures


20220321_East Kentucky Power Cooperative, Inc. Notice of Intent and Election.pdf

East Kentucky Power Cooperative, Inc. Notice of Intent and Election