Kentucky Public Service Commission


View Case Filings for: 2024-00108


Case Number:2024-00108
Service Type:Electric
Filing Date:5/22/2024
Category:Regular
Utilities:

East Kentucky Power Cooperative, Inc.


Electronic Case
Case Nature:

ELECTRONIC APPLICATION OF EAST KENTUCKY POWER COOPERATIVE, INC. FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY FOR CONSTRUCTION PROJECTS IN MARION COUNTY, KENTUCKY AND OTHER GENERAL RELIEF









Case Filings
FilingDocuments
9/10/2024 3:31:14 PM

Final Order Entered: 1. EKPC’s request for a CPCN for each of the proposed projects described in its application is granted. 2. EKPC shall immediately notify the Commission upon knowledge of any material changes to the project, including, but not limited to, a material increase in costs and any significant delays in construction. 3. Any material deviation from the construction approved by this Order shall be undertaken only with prior approval of the Commission. 4. EKPC shall file documentation of the total costs of each of the projects, including the cost of construction and all other capitalized costs, (e.g. engineering, legal, administrative, etc.) within 60 days of the date that construction authorized under each CPCN is substantially completed. 5. EKPC shall file a copy of “as-built” drawings for each project, if any, and a certified statement that construction has been satisfactorily completed in accordance with the plans and specifications within 60 days of substantial completion of the construction certificated herein. 6. Any documents filed in the future pursuant to ordering paragraph 2 through 5 shall reference this case number and shall be retained in the post-case correspondence file for this proceeding. 7. The Executive Director is delegated authority to grant reasonable extensions of time for filing any documents required by this Order upon EKPC’s showing of good cause for such extension. 8. This case is closed and is removed from the Commission's docket.


8/9/2024 2:26:57 PM

East Kentucky Power Cooperative, Incs Motion to Submit.


Greg Cecil East Kentucky Power Cooperative, Inc.

8/5/2024 2:35:34 PM

East Kentucky Power Cooperative, Inc.s Responses to Commission Staffs Second Request for Information.


Greg Cecil East Kentucky Power Cooperative, Inc.

EKPC_Responses_to_DR2_-_2024-00108.pdf

EKPC Responses to Staffs Second Request for Information

Read_First_DR2.pdf

Read First Cover Letter

7/22/2024 3:11:56 PM

Data Request


7/8/2024 2:44:20 PM

Enclosed, please find for filing East Kentucky Power Cooperative, Inc.’s responses to Commission Staffs Data Requests.


Chris Adams East Kentucky Power Cooperative, Inc.

DR1-2ALS1.pdf

Attachment

DR1-2ALS2.pdf

Attachment

DR1-2BLS1.pdf

Attachment

DR1-2BLS2.pdf

Attachment

DR10A-1.pdf

Attachment

DR10B-1.pdf

Attachment

DR1A-1.pdf

Attachment

Read_First_Metts_Marion_CPCN.pdf

Read First Cover Letter

6/18/2024 2:26:54 PM

Data Request


6/7/2024 4:39:26 PM

Order Entered: 1. This case is continued to 120 days, up to and including September 19, 2024. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. The procedural schedule may be amended to allow for intervenor testimony. 3. EKPC shall respond to all requests for information propounded by Commission Staff, whether identified on the procedural schedule or otherwise, as provided in those requests. 4. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021 Order in Case No. 2020-00085¹ regarding filings with the Commission. 5. As set forth in 807 KAR 5:001, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings.


5/28/2024 4:14:11 PM

20240528_PSC No Deficiency Letter.pdf


5/22/2024 4:40:22 PM

Application for two CPCNs.


Heather Temple East Kentucky Power Cooperative, Inc.

Application_Volume_I_-_Exhibits_1-7.pdf

Application, Volume I, Exhibits 1-7

Application_Volume_II_-_Exhibits_8-18.pdf

Application, Volume II, Exhibit 8-18

Application_Volume_III_-_Exhibits_19-23.pdf

Application, Volume III, Exhibit 19-23

4/17/2024 4:22:06 PM

Notice of Intent to file an Application for a CPCN


Heather Temple East Kentucky Power Cooperative Inc.

EKPC_NOI_CPCN.pdf

Notice of Intent

4/16/2024 3:40:55 PM

20240416_PSC Acknowledgment Letter.pdf


4/16/2024

East Kentucky Power Cooperative, Inc. Notice of Intent to File an Application for Certificates of Public Convenience and Necessity for Construction Projects in Marion County, Kentucky and Other General Relief Using Electronic Filing Procedures


20240416_East Kentucky Power Cooperative, Inc. Notice of Intent and Election.pdf

East Kentucky Power Cooperative, Inc. Notice of Intent and Election