View Case Filings for: 2024-00082
Service Type:Gas & Electric
Filing Date:3/28/2024
Category:Regular
Utilities:
Louisville Gas and Electric Company
Electronic Case
Case Nature:
ELECTRONIC APPLICATION OF LOUISVILLE GAS AND ELECTRIC COMPANY FOR A SITE COMPATIBILITY CERTIFICATE FOR THE CONSTRUCTION OF A BATTERY ENERGY STORAGE SYSTEM FACILITY AT E.W. BROWN GENERATING STATION IN MERCER COUNTY, KENTUCKY
Case Filings | |
---|---|
Filing | Documents |
11/26/2024 1:25:32 PM
Final Order Entered: 1. LG&E’s application for a Site Compatibility Certificate to install and operate a 125 MW BESS in Mercer County, Kentucky, is granted subject to its full compliance with all mitigation measures and conditions listed in the Appendix to this Order and all mitigation measures that LG&E committed to implement in this matter. 2. LG&E shall fully comply with the mitigation measures and conditions prescribed in Appendix to this Order and any other mitigation measures that LG&E committed to implement in this matter. 3. In the event the mitigation measures within the body of this Order conflict with those prescribed in the Appendix to this Order, the measures in the Appendix shall control. 4. This case is closed and removed from the Commission's docket. |
|
7/26/2024 12:46:17 PM
Louisville Gas and Electric Company’s Responses to the Commission Staff’s Third Request for Information Rick E. Lovekamp Louisville Gas and Electric Company |
|
7/17/2024 12:33:22 PM
Data Request |
|
7/9/2024 3:07:14 PM
Louisville Gas and Electric Company request matter be decided based upon the written record Rick E. Lovekamp Louisville Gas and Electric Company |
|
6/21/2024 10:08:39 AM
Louisville Gas and Electric Company’s Responses to the Commission Staff’s Second Request for Information Rick E. Lovekamp Louisville Gas and Electric Company |
|
6/6/2024 12:47:32 PM
Data Request |
|
5/21/2024 10:38:56 AM
Louisville Gas and Electric Company’s Responses to the Commission Staff’s Initial Request for Information Rick E. Lovekamp Louisville Gas and Electric Company |
|
5/2/2024 2:04:08 PM
Data Request |
|
4/9/2024 2:29:21 PM
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. LG&E shall respond to all requests for information propounded by Commission Staff, whether identified on the procedural schedule or otherwise, as provided in those requests. 3. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021 Order in Case No. 2020-00085¹ regarding filings with the Commission. 4. As set forth in 807 KAR 5:001, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings. Therefore, any person requesting to intervene in a Commission proceeding must state with specificity the person’s special interest that is not otherwise adequately represented, or the issues and facts that the person will present that will assist the Commission in fully considering the matter. |
|
3/28/2024 11:06:50 AM
Louisville Gas and Electric Company’s verified application for a Site Compatibility Certificate for the construction of an approximate 125 MW Battery Energy Storage System Facility at E.W. Brown Generating Station Rick E. Lovekamp Louisville Gas and Electric Company |
|
3/26/2024 4:17:22 PM
20240326_PSC Acknowledgment Letter.pdf |
|
3/26/2024
Louisville Gas and Electric Company Notice of Intent to File an Application for a Site Compatibility Certificate for the Construction of a Battery Energy Storage System Facility at E.W. Brown Generating Station in Mercer County, Kentucky Using Electronic F |