ELECTRONIC APPLICATION OF KNOX COUNTY UTILITY COMMISSION FOR AUTHORIZATION TO EXECUTE AN ASSISTANCE AGREEMENT WITH THE KENTUCKY INFRASTRUCTURE AUTHORITY AND FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT THE BARBOURVILLE CONNECTION-KY 225 PROJECT









Case Filings
FilingDocuments
3/24/2023 3:08:54 PM

Final Order Entered: 1. Knox County Commission’s request for a CPCN for the proposed project described in its application is granted. 2. Knox County Commission shall immediately notify the Commission upon knowledge of any material changes to the project, including, but not limited to, a material increase in costs and any significant delays in construction. 3. Any material deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Knox County Commission shall file with the Commission documentation of the total costs of the projects, including the cost of construction and all other capitalized costs, (e.g. engineering, legal, administrative, etc.) within 60 days of the date that construction authorized under this CPCN is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for electric utilities as prescribed by the Commission. 5. Knox County Commission shall file a copy of the “as-built” drawings, if any, and a certified statement that the construction has been satisfactorily completed in accordance with the plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. Knox County Commission is authorized to execute the KIA loan described in its application.


3/15/2023 10:35:26 PM

Supplemental Response to PSC Staff Second Request for Information


Gerald E. Wuetcher Knox County Utility Commission

Read1st.pdf

Transmittal Letter

3/15/2023 10:27:29 PM

Supplemental Response to PSC Staff First Request for Information


Gerald E. Wuetcher Knox County Utility Commission

Read1st.pdf

Transmittal Letter

3/9/2023 10:00:16 PM

Response to PSC Staff Second Request for Information


Gerald E. Wuetcher Knox County Utility Commission

OperatorBenefitsAndWages.xlsx

Response to Question 6a and 6c

Read1st.pdf

Transmittal Letter

3/7/2023 1:12:18 PM

Notice of Bid Extension


Gerald E. Wuetcher Knox County Utility Commission

Read1st.pdf

Transmittal Letter

3/2/2023 9:56:16 AM

Data Request


2/2/2023 4:18:54 PM

Response to Commission Staffs First Request for Information


Gerald E. Wuetcher Knox County Utility Commission

Read1st.pdf

Transmittal Letter

1/30/2023 4:54:23 PM

Order Entered: 1. The procedural schedule set forth in Appendix A to this Order shall be followed. The schedule will be amended if any intervenors are joined to facilitate intervenor discovery. 2. On or before the date set forth in the procedural schedule, Knox County Commission shall file its responses to the Commission Staff’s First Request for Information, attached to this Order as Appendix B. 3. Knox County Commission shall respond to additional requests for information propounded by Commission Staff as provided in those requests. 4. As set forth in 807 KAR 5:001E, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings. 5. Any person requesting to intervene in a Commission proceeding must state with specificity the person’s special interest that is not otherwise adequately represented, or the issues and facts that the person will present that will assist the Commission in fully considering the matter.


1/30/2023 4:51:10 PM

20230130_PSC No Deficiency Letter.pdf


1/24/2023 10:59:54 AM

Application for Certificate of Public Convenience and Necessity and Authorization to Issue An Evidence of Indebtedness


Gerald E. Wuetcher Knox County Utility Commission

008_Plans.pdf

Exhibit 8 - Plans

Application.pdf

Application (Excluding Exhibit 8)

Read1st.pdf

Transmittal Letter

1/3/2023 12:55:40 PM

20230103_PSC Acknowledgment Letter.pdf


1/3/2023

Knox County Utility Commission Notice of Intent to File an Application for Authorization to Issue an Evidence of Indebtedness and for a Certificate of Public Convince and Necessity to Construct Facilities Using Electronic Filing Procedures


20230103_Knox County Utility Commission Notice of Intent and Election.pdf

Knox County Utility Commission Notice of Intent and Election