Kentucky Public Service Commission


View Case Filings for: 2016-00275


Case Number:2016-00275
Service Type:Electric
Filing Date:7/28/2016
Category:Regular
Utilities:

Nolin R.E.C.C.


REQUEST OF NOLIN RURAL ELECTRIC COOPERATIVE CORPORATION TO ADOPT SCIENTIFIC SAMPLE METER TESTING FOR SINGLE PHASE METERS









Case Filings
FilingDocuments
5/4/2017 10:08:34 AM

Final Order Entered: 1. Nolin's application requesting approval to implement a sample meter testing program for its single-phase meters is approved. 2. Nolin shall comply with all applicable meter-testing requirements set forth in 807 KAR 5:006 and 807 KAR 5:041, including maintaining all test records related to its sample meter testing in accordance with 807 KAR 5:006, Section 18. 3. Nolin shall provide the additional information below with its Quarterly Meter Reports, which are required to be filed by 807 KAR 5:006, Section 4{4), and include an electronic version compatible with Microsoft Excel. a. A detailed report in tabular format that records the following information for each meter, including new meters, tested under the sampling plan: (1) Serial Number; (2) Date/Time of Test; (3) Manufacturer; (4) Model/Form/type; (5) Version/Firmware; (6) As-Found Meter Registration, Full Load, Light Load, and Power Factor Results; (7) As-Left Meter Registration, Full Load, Light Load, and Power Factor Results; {8) Description of Any Billing Adjustment.


11/23/2016 12:49:44 PM

Memorandum dated11/23/2016 for Informal Conference of 11/22/2016; Comments, if any, due within five days of receipt


10/11/2016

Nolin RECC Response to Request for Information


9/27/2016 3:56:50 PM

Commission Staff's First Request for Information to Nolin Rural Electric Cooperative Corporation


7/28/2016 11:05:11 AM

Acknowledge Receipt of Filing


7/28/2016

Nolin RECC Request to Adopt Scientific Sample Meter Testing for Single Phase Meters