Kentucky Public Service Commission


View Case Filings for: 2014-00228


Case Number:2014-00228
Service Type:Electric
Filing Date:8/13/2014
Category:Fuel Adjustment Clause
Utilities:

Louisville Gas and Electric Company


Electronic Case
Case Nature:

AN EXAMINATION OF THE APPLICATION OF THE FUEL ADJUSTMENT CLAUSE OF LOUISVILLE GAS & ELECTRIC COMPANY FROM NOVEMBER 1, 2013 THROUGH APRIL 30, 2014









Case Filings
FilingDocuments
1/25/2019 10:47:08 AM

Order Entered: 1. LG&E's August 27, 2014 petition for confidential protection is granted. 2. The designated materials shall not be placed in the public record or made available for public inspection for five years, or until further Orders of this Commission. 3. Use of the designated materials in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. LG&E shall inform the Commission if the designated materials become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect the designated materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not expired, LG&E shall have 30 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If LG&E is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the designated materials available for inspection for 30 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow LG&E to seek a remedy afforded by law.


8/11/2015 10:52:34 AM

Final Order Entered: 1. The charges and credits applied by LG&E through the FAC for the period from November 1, 2012, through October 31 , 2014, are approved. 2. LG&E's continued use of the existing base fuel cost of 27.25 mills per kWh is approved. 3. LG&E's fuel-cost allocation methodology is approved.


4/21/2015 3:41:00 PM

Post Hearing data responses of Louisville Gas and Electric Company


Robert M Conroy Louisville Gas and Electric Company

Read_1st.pdf

READ1st - Cover Letter

2/19/2015 12:10:09 PM

Order Entered: 1. Case No. 2014-00228 is consolidated with Case No. 2014-00453. All future filings relating to any issue in either case shall contain the styles of both cases and shall be filed in Case No. 2014-00453. 2. Case No. 2014-00228 shall remain on the Commission's docket until such time as a final order is entered in these consolidated cases.


12/10/2014 7:36:16 AM

Louisville Gas and Electric Company Response to Staff Second Request for Information.


Robert M. Conroy Louisville Gas and Electric Company

12/1/2014 12:26:26 PM

Data Request


11/26/2014 1:49:31 PM

20141126_PSC_Notice of Filing.pdf


11/7/2014 9:56:13 AM

Revision to Louisville Gas and Electric Companys response to data request No. 2 for Information Requested in the Appendix of the Commissions Order dated August 13, 2014.


Robert M. Conroy Louisville Gas and Electric Company

LGE_Formatted_Revision_dated_11-7-14.pdf

Revised response to Data Request No. 2.

11/7/2014 9:53:14 AM

Affidavit for proof of publication of notice for Hearing on November 12, 2014.


Robert M. Conroy Louisville Gas and Electric Company

9/17/2014 4:59:35 PM

Verification Page for Mr. Charles R. Schram for data responses filed on August 27, 2014.


Robert M. Conroy Louisville Gas and Electric Company

Read1st_(Schram).pdf

READ 1st - Cover Letter

Schram.pdf

Verification Page of Mr. Charles R. Schram

9/12/2014 10:10:39 AM

Order Entered: KIUC's Notice of Withdrawal is granted.


8/29/2014 10:59:22 AM

NOTICE OF WITHDRAWAL


Michael L. Kurtz Kentucky Industrial Utility Customers

KIUC_Notice_of_Withdrawal.pdf

KIUC Notice of Withdrawal

Read_First_-_Cover_letter.pdf

Read first - Cover letter

8/27/2014 1:03:03 PM

Response of Louisville Gas and Electric Company to Information Requested in the Appendix of the Commissions Order dated August 13, 2014


Robert M. Conroy Louisville Gas and Electric Company

Petition_for_Confidential_Treatment.pdf

Petition for Confidential Protection

Read1st.pdf

READ 1st - Cover Letter

8/21/2014 3:15:32 PM

Kentucky Industrial Utility Customers, Inc. (KIUC) Motion to Intervene and Petition to Amend Procedural Schedule


Michael L. Kurtz Kentucky Industrial Utility Customers

Motion_to_Intervene__2014-00228.pdf

KIUC Motion to Intervene

Petition_to_Amend_Procedural_Schedule__2014-00228.pdf

KIUC Petition to Amend Procedural Schedule

Read_1st_-_Cover_Ltr__2014-00228.pdf

Read first - Cover letter

8/21/2014 1:15:03 PM

Order Entered: Item 27.b. of the Appendix to the August 13, 2014 Order is amended by deleting the date of November 1, 2013, and replacing it with November 1, 2012. 2. All other provisions of the August 13, 2014 Order shall remain in full force and effect.


8/13/2014 11:47:08 AM

Order Entered: (1) LG&E shall appear in HR 1 on November 12, 2014 at 10:00 a.m., EST, to submit itself to examination of the application of the Fuel Adjustment Clause of LG&E from November 1, 2013, through April 30, 2014. Neither opening statements nor summaries of pre-filed testimony will be permitted. (2) Not less than seven days and no more than 21 days prior to hearing, LG&E shall publish notice of the purpose, time, place, and date of the hearing. (3) LG&E shall file no later than November 7, 2014 proof of publication of its notice for the hearing. (4) The official record of the proceeding shall be by video only. (5)The information requested in the Appendix is due not later than 14 days from the date of this Order. (6) Any party which wishes to file testimony or requests information from LG&E may petition the Commission for a procedural schedule. (7) Any request for intervention must be filed by September 8, 2014. (8) A person who submits a motion to intervene after September 8, 2014, and, upon a showing of good cause, is granted full intervention shall accept and abide by the existing procedural schedule.