APPLICATION OF DEXTER-ALMO HEIGHTS WATER DISTRICT FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AND FINANCE A WATERWORKS IMPROVEMENTS PROJECT PURSUANT TO KRS 278.020 AND 278.300









Case Filings
FilingDocuments
11/30/2012 2:49:18 PM

Order Entered: . Dexter-Almo is granted a Certificate to proceed with the proposed construction as set forth in its application. 2. Dexter-Almo shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. Dexter-Almo shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs (engineering, legal, administrative, etc.), within 60 days of the date that construction is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. 5. Dexter-Almo shall file a copy of the “as-built” drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications wi thin 60 days of the substantial completion of the construction certificated herein. 6. Dexter-Almo shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil, electrical, or mechanical engineering, to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involv


11/30/2012 2:37:35 PM

Letter entering documents into case file from Wuetcher with objections due within 5 days of receipt


11/27/2012 12:05:18 PM

No deficiency letter


11/9/2012 12:31:19 PM

Acknowledge Receipt of Filing


11/9/2012