Governor issues Emergency Order - KYTC order linked below applies to commercial vehicles responding to affected areas for utility restoration activities.
Also an Emergency Relief letter has been issued by KY PSC the Commission notes that the conditions created from the severe weather meet the definition of emergency under KRS 367.4903(7) please see the KYTC 1-22-2026 Order: and PSC Emergency Locate Relief 1-22-2026 Order:

Kentucky Public Service Commission


View Case Filings for: 2008-00043


Case Number:2008-00043
Service Type:Electric
Filing Date:3/27/2008
Category:Regular
Utilities:

Fleming-Mason Energy Cooperative, Inc.


Electronic Case

THE APPLICATION OF FLEMING-MASON ENERGY COOPERATIVE FOR A CERTIFICATE OF PUBLIC CONVENIENCE FOR ITS CONSTRUCTION WORKPLAN FOR THE PERIOD FROM JANUARY 1, 2008 THROUGH DECEMBER 31, 2009









Case Filings
FilingDocuments
7/2/2008 10:55:46 AM

Order


Reneec.smith Public Service Commission

3/31/2008 3:26:18 PM

PSC Acceptance Letter


Michael Burford

3/27/2008 10:57:49 PM

Response to PSC deficiency letter dated 03/19/2008.


Gary E. Grubbs

FME_deficiencyresponse_032708.pdf

Response to deficiency letter dated 03/19/2008

3/19/2008 2:29:37 PM

PSC Deficiency Letter


Michael Burford

3/12/2008 11:44:26 AM

Acknowledgement letter


Renee Smith PSC

PSC_Letter_031208.pdf

Acknowledgement Letter

3/12/2008 9:13:54 AM

THE APPLICATION OF FLEMING-MASON ENERGY COOPERATIVE, INC. FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT FACILITIES ACCORDING TO THE APPLICANTS 01/01/2008 ~ 12/31/2009 CONSTRUCTION WORK PLAN


Gary E. Grubbs

FME_analysis_031008.pdf

FME Distribution Load-Flow Analysis Printouts

FME_application_031008.pdf

FME Application for CPCN

FME_costofoperation_031008.xls

FME Spreadsheet for Estimated Cost of Operations for CWP Work

FME_cwp_031008.pdf

FME Construction Work Plan Document, Exhibits, and Other Supporting Documents

FME_cwpmap1_031008.pdf

FME Map of Existing Winter 2006/07 System With Recommendations

FME_cwpmap2_031008.pdf

FME Map of Proposed Winter 2009/10 System After Improvements

FME_maps_031008.pdf

FME Distribution Maps with Substations, Circuits, Facilities, Etc. Indicated

FME_read1st_031008.pdf

FME "Read Me First" Application Letter

2/18/2008

Response to PSC Order dated February 12, 2008


Renee Smith Fleming-Mason Energy

2/12/2008 4:17:04 PM

Order permitting electronic filing.


David McDowell PSC

2/12/2008 4:14:44 PM

Notice of intent to file construction plans and request to file electronically.


David McDowell Fleming-Mason Energy