Kentucky Public Service Commission


tariffs Library

Parent Folder
Name
Alternative Demand Basis of Minimum Monthly Charges
Alternative Minimum Charge for Seasonal Power Service
City of Louisville Street Lighting
DC - Direct Current Power Rate
GL - General Lighting Rate
GP - General Power Rate
Heating Season Discount for Residential Electric Space Heating Service
High Load Factor Discount for Combined Light and Power Service
LC - Large Commercial Rate
LP - Large Power Rate
Maximum Demand and Minimum Monthly Charge Waiver on Air Conditioning Equipment Load
MSL - Metered Street Lighting Rate
New folder
New folder (2)
New folder (3)
OL - Outdoor Lighting Service
P-2 - General Power Rate
Pa-1 - General Power Rate
Pa-2 - General Power Rate
Pcw-1 - Domestic Water Heating Rate
Pe-2 - Optional Industrial Power Rate
Pe-3 - Reserve, Breakdown, Standby or Auxiliary Service
Power Factor Billing Adjustments for Primary Service Loads of 1500 kW or More Under Rate Pe-1
R - Residential Rate
R-2 - Residential Rate
REC-2 - Rural Cooperative Resale Rate
Reserve, Breakdown, Standby or Auxiliary Service
S-1 - Flat Rate for Steam Service
S-2 - Rate for Metered Steam Service
Special Rate for Non-Residential Electric Space Heating Service
Temporary Service
Terms and Conditions
WH - Controlled Water Heating Rate