View Case Filings for: 2024-00189
Service Type:Gas & Electric
Filing Date:6/14/2024
Category:Regular
Utilities:
Duke Energy Kentucky, Inc.
Electronic Case
Case Nature:
ELECTRONIC APPLICATION OF DUKE ENERGY KENTUCKY, INC. FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AUTHORIZING THE PHASE THREE REPLACEMENT OF THE AM07 PIPELINE
Case Filings | |
---|---|
Filing | Documents |
1/17/2025 12:01:00 PM
Final Order Entered: 1. Duke Kentucky’s request for a CPCN for Phase Three of the proposed project described in its application is granted. 2. Duke Kentucky shall immediately notify the Commission upon knowledge of any material changes to the project, including, but not limited to, a material increase in costs and any significant delays in construction. 3. Any material deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Duke Kentucky shall file with the Commission documentation of the total costs of the projects, including the cost of construction and all other capitalized costs, (e.g. engineering, legal, administrative, etc.) within 60 days of the date that construction authorized under this CPCN is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for gas utilities as prescribed by the Commission. 5. Duke Kentucky shall file a copy of the “as-built” drawings, if any, and a certified statement that the construction has been satisfactorily completed in accordance with the plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. Any documents filed in the future pursuant to ordering paragraph 2 through 5 shall reference this case number and shall be retained in the post-case correspondence file for this proceeding. |
|
10/8/2024 12:42:19 PM
Duke Energy Kentucky, Inc.s Request to Submit the Case on the Record Minna Sunderman Rocco DAscenzo |
|
10/2/2024 5:38:32 PM
Duke Energy Kentucky, Inc.s Responses to Commission Staffs Second Request for Information Minna Sunderman Rocco DAscenzo |
|
9/18/2024 3:10:04 PM
Data Request |
|
9/4/2024 10:25:47 PM
Duke Energy Kentucky Incs Responses to Staffs First Request for Information Deborah L Gates Rocco DAscenzo |
|
8/21/2024 3:18:34 PM
Data Request |
|
8/6/2024 8:48:13 AM
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. Duke Energy Kentucky, Inc. shall respond to all requests for information propounded by Commission Staff, whether identified on the procedural schedule or otherwise, as provided in those requests. 3. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021 Order in Case No. 2020-00085¹ regarding filings with the Commission. 4. As set forth in 807 KAR 5:001, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings. Therefore, any person requesting to intervene in a Commission proceeding must state with specificity the person’s special interest that is not otherwise adequately represented, or the issues and facts that the person will present that will assist the Commission in fully considering the matter. |
|
7/3/2024 3:47:01 PM
20240703_PSC No Deficiency Letter.pdf |
|
6/14/2024 4:13:35 PM
Duke Energy Kentucky, Inc.s Application in Case 2024-00189 AM07 Phase 3 Replacement CPCN Deborah L Gates Rocco DAscenzo |
|
6/13/2024 12:06:28 PM
20240613_PSC Acknowledgment Letter.pdf |
|
6/13/2024
Duke Energy Kentucky, Inc. Notice of Intent to File an Application for a Certificate of Public Convenience and Necessity Authorizing the Phase Three Replacement of the AM07 Pipeline Using Electronic Filing Procedures |