View Case Filings for: 2022-00118
Service Type:Electric
Filing Date:5/27/2022
Category:Regular
Utilities:
Kentucky Power Company
Electronic Case
Case Nature:
ELECTRONIC APPLICATION OF KENTUCKY POWER COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD THE WOOTON-STINNETT PORTION OF THE HAZARD-PINEVILLE 161 KV LINE IN LESLIE COUNTY, KENTUCKY
Case Filings | |
---|---|
Filing | Documents |
9/22/2022 2:10:18 PM
Final Order Entered: 1. Kentucky Power is granted a CPCN to construct, own, and operate the Wooton-Stinnett 161 kV Transmission Line Rebuild Project as described in its application, with the conditions expressed in this Order. 2. Kentucky Power shall file a survey of the final location of the transmission facilities after any modifications are finalized as authorized by this Order and before construction begins. 3. Kentucky Power shall notify the Commission upon knowledge of any material changes to the project, including but not limited to, increase in cost, any significant delays in construction, or any changes in the route of the transmission line not expressly authorized by his Order. 4. Kentucky Power shall file as built drawings and maps within 60 days of the completion of the construction authorized by this Order. 5. Kentucky Power shall furnish documentation of the total costs of this project including the cost of construction and all other capitalized costs, including, but not limited to, engineering, legal, and administrative expenses, within 60 days of the date construction is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for electric utilities prescribed by the Commission. 6. Kentucky Power shall file with the Commission any permits acquired in connection with this project within 30 days of issuance of the permit. |
|
8/24/2022 11:09:43 AM
Kentucky Power Company filing motion to submit for a decision on the written record. Scott E. Bishop Kentucky Power Company |
|
8/2/2022 11:26:49 AM
Kentucky Power Company’s responses to the Commission’s July 21, 2022 data requests. Lerah M Scott Kentucky Power Company |
|
7/21/2022 8:38:45 AM
Data Request |
|
7/13/2022 1:20:18 PM
Kentucky Power Company filing supplemental response to KPSC 1-10(d). Scott E. Bishop Kentucky Power Company |
|
7/12/2022 5:37:17 PM
Kentucky Power Company’s responses to the Commission’s June 30, 2022 data requests. Lerah M Scott Kentucky Power Company |
|
6/30/2022 2:36:14 PM
Data Request |
|
6/20/2022 10:04:29 AM
Order Entered: 1. The time period in which the Commission must issue its decision in this case is extended to 120 days. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. |
|
5/31/2022 2:12:18 PM
20220531_PSC No Deficiency Letter.pdf |
|
5/27/2022 4:10:52 PM
Kentucky Power Company filing Applications, Exhibits and Testimony for Brian West, Emily Larson and Nicolas Koehler. Scott E. Bishop Kentucky Power Company |
|
4/13/2022 8:23:38 AM
Kentucky Power Companys Notice of Intent Lerah M Scott Kentucky Power |
|
4/6/2022 1:25:21 PM
20220406_PSC Acknowledgment Letter.pdf |
|
4/6/2022
Kentucky Power Company Notice of Intent to File an Application for a Certificate of Public Convenience and Necessity to Rebuild the Wooton-Stinnett Portion of the Hazard-Pineville 161 Kv Line in Leslie County, Kentucky Using Electronic Filing Procedures |