Kentucky Public Service Commission


View Case Filings for: 2021-00207


Case Number:2021-00207
Service Type:Water
Filing Date:5/28/2021
Category:Regular
Utilities:

Estill County Water District #1


Electronic Case
Case Nature:

ELECTRONIC APPLICATION OF ESTILL COUNTY WATER DISTRICT NO. 1 FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE PURCHASE AND INSTALLATION OF METERING EQUIPMENT AND AUTHORIZATION TO USE LOAN PROCEEDS FOR PROPOSED PURCHASE









Case Filings
FilingDocuments
7/2/2021 3:04:45 PM

1. This case shall be opened for the express purpose of the Commission ruling on Estill District No. 1’s June 29, 2021 Motion to Amend. 2. The Commission’s June 25, 2021 Order shall be amended to include the finding that Estill District No. 1’s request to use the remaining balance of $1,379,030 from the KIA Loan F20-13,13 which was approved by the Commission in Case No. 2021- 00064,14 to finance the proposed equipment purchase and installation should be approved. 3. The Commission’s June 25, 2021 Order shall be amended to include an ordering paragraph that Estill District No. 1’s request to use the remaining balance of $1,379,030 from the KIA Loan F20-13,15 which was approved by the Commission in Case No. 2021-00064,16 to finance the proposed equipment purchase and installation is granted. 4. All other provisions of the Commission’s June 25, 2021 Order that are not in conflict with the terms of this Order shall remain in effect. 5. This case is closed and removed from the Commission’s docket.


6/29/2021 10:13:04 AM

Motion to Amend Order


Gerald E. Wuetcher Estill County Water District No. 1

Read1st.pdf

Transmittal Letter

6/25/2021 3:46:18 PM

Final Order Entered: 1. Estill District No. 1 is granted a CPCN to construct the proposed project as set forth in the application. 2. Estill District No. 1 shall immediately notify the Commission upon knowledge of any material changes to the project, including, but not limited to, increase in costs and any significant delays, in construction. 3. Any material deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Estill District No. 1 shall file with the Commission documentation of the total costs of the projects, including the cost of construction and all other capitalized costs (e.g., engineering, legal, administrative, etc.), within 60 days of the date that construction authorized under this CPCN is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. 5. Estill District No. 1 shall file a copy of the “as-built” drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. This case is closed and removed from the Commission’s docket.


6/14/2021 10:15:37 AM

Supplement to Application


Gerald E. Wuetcher Estill County Water District No. 1

Read1st.pdf

Transmittal Letter

6/7/2021 8:48:37 AM

20210607_PSC No Deficiency Letter.pdf


5/28/2021 9:35:52 PM

Application for A Certificate of Public Convenience and Necessity and Authorization to Use Loan Proceeds


Gerald E. Wuetcher Estill County Water District No. 1

Read1st.pdf

Transmittal Letter

5/18/2021 10:25:44 AM

20210518_PSC Acknowledgment Letter.pdf


5/18/2021

Estill County Water District No. 1 Notice of Intent to File an Application for a Certificate of Public Convenience and Necessity Using Electronic Filing Procedures


20210518_Estill County Water District No. 1 Notice of Intent and Election.pdf

Estill County Water District No. 1 Notice of Intent and Election