Kentucky Public Service Commission


View Case Filings for: 2021-00176


Case Number:2021-00176
Service Type:Water
Filing Date:4/27/2021
Category:Regular
Utilities:

Columbia/Adair Utilities District


Electronic Case
Case Nature:

ELECTRONIC APPLICATION OF THE ADAIR COUNTY WATER DISTRICT FOR THE ISSUANCE OF A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A WATER SYSTEM IMPROVEMENTS PROJECT AND AN ORDER AUTHORIZING THE ISSUANCE OF SECURITIES PURSUANT TO THE PROVISIONS OF KRS 278.020, KRS 278.300 AND 807 KAR 5:001









Case Filings
FilingDocuments
6/10/2021 11:40:06 AM

Final Order Entered: 1. Adair District is granted a CPCN to proceed with the proposed construction of the Phase 20 Project as set forth in its application. 2. Adair District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the approved construction shall be undertaken only with prior approval of the Commission. 4. Adair District shall require the construction to be inspected under the general supervision of a professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Adair District is authorized to supplement the executed Assistance Agreement with KIA and, under the terms of that Agreement, to borrow from KIA an amount not to exceed $1,476,783, said amount to be repaid over a 30-year period at an interest rate of 0.50 percent per annum and loan servicing fee of 0.25 percent per annum. 6. Adair District shall file a copy of the “as-built” drawings and a certified statement from the engineer that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of substantial completion of the construction certified herein.


4/27/2021 4:04:23 PM

20210427_PSC No Deficiency Letter.pdf


4/27/2021 2:06:50 PM

Application and Supporting Documents


W. Randall Jones Adair County Water District

Application_and_Exhibits.pdf

Application and Exhibits

CAUD-Cont4-Bid_Tab.pdf

Contract 4 Bid Tabs

CAUD-Cont5-Bid_Tab.pdf

Contract 5 Bid Tabs

Contract_4-BID_Set.pdf

Contract 4 Plans

4/19/2021 3:21:29 PM

20210419_PSC Acknowledgment Letter.pdf


4/19/2021

Adair County Water District Notice of Intent to File an Application for a Certificate of Public Convenience and Necessity to Construct a Water System Improvements Project and an Order Authorizing the Issuance of Securities pursuant to KRS 278.020, KRS 278.


20210419_Adair County Water District Notice of Intent and Election.pdf

Adair County Water District Notice of Intent and Election