APPLICATION OF ADAIR COUNTY WATER DISTRICT FOR A CERTIFICATE OF PUBLIC CONVENINECE AND NECESSITY TO CONSTRUCT A WATER IMPROVEMENTS PROJECT PURSUANT TO KRS 278.020 AND 807 KAR 5:001









Case Filings
FilingDocuments
5/15/2013 10:27:11 AM

Letter Filing Documents into the Record


5/14/2013 2:30:19 PM

Order Entered: Adair District is granted a Certificate for the proposed construction as set forth in its application. 2. Adair District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the Commission’s prior approval. 4. Adair District shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs (e.g., engineering, legal, administrative)] within 60 days of the date that construction is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. Adair District shall file a copy of the “as-built” drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. Adair District shall require construction to be inspected under the general supervision of a licensed professional engineer, with a Kentucky registration in civil, electrical, or mechanical engineering, to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in


5/10/2013 1:14:01 PM

Letter Filing E-mail Exchanges in Record


4/2/2013 8:42:54 AM

Deficiency cured letter


3/22/2013

Adair County Water District Response to Filing Deficiencies


3/19/2013

Adair County Water District Plans and Specifications


3/15/2013 2:38:29 PM

Deficiency letter


3/11/2013 10:37:21 AM

Acknowledge Receipt of Filing


3/11/2013

Application of Adair County Water District for a Certificate of Public Conveninece and Necessity to Construct a Water Improvements Project Pursuant to KRS 278.020 and 807 KAR 5:001