Case Nature:

APPLICATION OF THE BREATHITT COUNTY WATER DISTRICT FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT PURSUANT TO KRS 278.020









Case Filings
FilingDocuments
1/17/2013 1:43:35 PM

Order Entered: BCWD is granted a Certificate to proceed with the Frozen Creek Phase I proposed construction as set forth in its application. 2. BCWD shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. BCWD shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs engineering, legal, administrative, etc.), within 60 days of the date that construction is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Unifo rm System of Accounts for water utilities prescribed by the Commission. 5. BCWD shall file a copy of the “as-built” drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. BCWD shall require construction to be inspected under the general supervision of a licensed professional engineer, with a Kentucky registration in civil, electrical, or mechanical engineering, to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project


11/20/2012 10:20:50 AM

Letter stating filing now meets requirements


11/16/2012

Frozen Creek Waterline Contract 1 and 2 Plans and Specs


11/2/2012 11:30:49 AM

Acknowledge Receipt of Filing


10/30/2012

Application of Breathitt County Water District for a Certificate of Public Convenience and Necessity to Construct and Finance Pursuant to KRS 278.020


10/30/2012

Application of Breathitt County Water District for a Certificate of Public Convenience and Necessity to Construct and Finance Pursuant to KRS 278.020