View Case Filings for: 2012-00189
Service Type:Water
Filing Date:6/6/2012
Category:Regular
Utilities:
Rowan Water, Inc.
Case Nature:
APPLICATION OF ROWAN WATER, INC. FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AND FINANCE IMPROVEMENT PROJECTS AND INCREASE RATES PURSUANT TO KRS 278.023
Case Filings | |
---|---|
Filing | Documents |
7/2/2012 3:51:48 PM
Final Order Entered: (1) Rowan is granted a CPC&N for the proposed construction project. (2) Rowan's proposed plan of financing is accepted. (3) Rowan is authorized to execute loan agreements with RD to borrow a total sum not to exceed $1,031,000. (4) The proceeds from the proposed loans shall be used only for the purposes specified in Rowan's application. (5) Rowan shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. (6) Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after approved construction completed, Rowan may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Rowan's rates for service. (7) Rowan shall file a copy of the "as-built" drawings and a certified statement that construction has been satisfactorily completed in accordance with contract plans and specifications within 60 days of substantial completion of the constructions certified herein. (8) Rowan shall require construction be inspected under general supervision of professional engineer with Kentucky registration in civil or mechanical engineering. (9) Rowan shall notify Commission one week prior to actual start of construction and at 50 percent completion point. (10) Rates set for in Appendix are approved for service rendered on and after date of this Order. (11) Within 30 days, Rowan shall file revised tariff sheets. |
|
6/11/2012 8:46:16 AM
Letter to Truman L. Dehner entering electronic mail traffic into the record |
|
6/6/2012 10:03:24 AM
Meets Requirements Letter |
|
6/6/2012 9:43:59 AM
Letter to Truman L. Dehner filing documents into the record |
|
6/6/2012
Rowan Water Letter of Conditions from USDA |
|
5/18/2012 1:55:14 PM
Acknowledge Receipt of Filing |
|
5/18/2012
Application of Rowan Water, Inc. for a Certificate of Public Convenience and Necessity to Construct, Finance and Increase Rates Improvement Projects Pursuant to KRS 278.023 |