Kentucky Public Service Commission


View Case Filings for: 2012-00169


Case Number:2012-00169
Service Type:Electric
Filing Date:5/3/2012
Category:Regular
Utilities:

East Kentucky Power Cooperative, Inc.


Case Nature:

APPLICATION OF EAST KENTUCKY POWER COOPERATIVE, INC. TO TRANSFER FUNCTIONAL CONTROL OF CERTAIN TRANSMISSION FACILITIES TO PJM INTERCONNECTION, LLC









Case Filings
FilingDocuments
8/10/2023 11:54:40 AM

Order Entered: 1. EKPC’s motion for confidential treatment is granted. 2. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for five years or until further Order of this Commission. 3. Use of the designated material granted confidential treatment by this Order in any Commission proceeding shall comply with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the designated material granted confidential treatment by this Order becomes publicly available or no longer qualifies for confidential treatment.


8/11/2022 9:14:01 AM

Order Entered: 1. EKPC’s motion for confidential treatment is granted. 2. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for five years or until further Order of this Commission. 3. Use of the designated material granted confidential treatment by this Order in any Commission proceeding shall comply with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the designated material granted confidential treatment by this Order becomes publicly available or no longer qualifies for confidential treatment. 5. If a nonparty to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, EKPC shall have 30 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested material available for inspection for 30 days from the date of service of an Order finding that the material no longer qualifies for confidential treatment in order to allow EKPC to seek a remedy afforded by law.


1/10/2022 3:23:37 PM

Order Entered: 1. EKPC’s request for confidential treatment for information redacted from its 2020 and 2021 annual reports is granted. 2. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for five years or until further Order of this Commission.


12/5/2019 8:59:51 AM

Final Order Entered: 1. This case is opened to address certain outstanding petitions for confidential treatment. 2. The petitions for confidential treatment listed in Appendix B to this Order are granted. 3. The granting of these petitions shall not be cited as precedent in other proceedings before the Commission. 4. All movants shall review the petitions to determine if the material for which confidential treatment was requested still warrants confidential treatment. 5. A movant shall inform the Commission in writing, and filed in the original case file, if it determines that the information contained in a petition that is granted by this Order no longer warrants confidential treatment. 6. The Commission shall make available for inspection, upon request, any materials that a movant determines no longer warrants confidential treatment. 7. This case is closed and removed from the Commission's docket.


4/24/2019 11:29:07 AM

Order Entered: 1. EKPC's May 31, 2013 petition for confidential treatment is denied as moot. 2. EKPC's the June 2, 2014, July 31, 2015, and December 9, 2015 petitions for confidential protection are granted. 3. Within 30 days of the date of this Order, EKPC shall file revised pages reflecting as unredacted the designated materials subject to the May 31, 2013 petition that has been denied confidential treatment. 4. The designated materials in the May 31, 2013 petition for which confidential protection was denied shall not be placed in the public record for 30 days following the date of this Order to allow EKPC to seek any remedy afforded by law. 5. The designated materials in the June 2, 2014, July 31, 2015, and December 9, 2015 petitions shall not be placed in the public record or made available for public inspection for five years from the respective dates the petitions were filed, or until further Orders of this Commission. 6. Use of the designated materials in the June 2, 2014, July 31, 2015, and December 9, 2015 petitions in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 7. EKPC shall inform the Commission if the designated materials in the June 2, 2014, July 31, 2015, and December 9, 2015 petitions become publicly available or no longer qualify for confidential treatment.


12/21/2012 9:57:12 AM

Order Entered: EKPC’s request to transfer functional control of its transmission facilities operated at 100 kv and above to PJM is approved subject to the filing, within 10 days of the date of this Order, of: (a) the letter from EKPC’s Chief Executive Officer agreeing to file, no later than November 30, 2015, a rate mechanism to flow back to customers the PJM capacity market benefits; and (b) documentation that all parties agree to modify the Stipulation to allow EKPC to withdraw from the TCRSG. 2. The Stipulation, dated November 2, 2012, as modified by the December 5, 2012 filing to extinguish any obligation arising under Article Ill, is incorporated herein and is conditionally approved subject to the filing of the documentation discussed in Ordering paragraph 1. 3. EKPC shall file within 30 days of the date of this Order any appropriate or needed amendments to existing special contracts or tariffs to reflect that EKPC is authorized to bid any customer’s interruptible load into the PJM Demand Response program. 4. Any customer on the EKPC system that seeks to participate directly or through a third party in the PJM Demand Response program shall do so under the terms of an EKPC special contract or tariff that has been approved by the Commission. 5. EKPC shall file monthly status reports as described in the findings above until it has fully integrated into PJM or the transaction is terminated. 6. By May 31 of each year, EKPC shall file with the Commission the comprehensive r


12/5/2012

Letter addressing issues on the stipulation and recommendations of EKPC


11/19/2012 2:00:54 PM

Notice of Filing Hearing Documents


11/16/2012

EKPC's Request for Findings by KY PSC


11/9/2012

EKPC's Responses to Commission's Information Request from Hearing held November 7, 2012


11/7/2012

Joint Parties Stipulation and Recommendation


11/5/2012

EKPC Stipulation and Recommendation with Signature Page


11/2/2012

OAG's Stipulation and Recommendation with Signature Pages


11/2/2012

PJM Interconnection Stipulation and Recommendation with Signature Pages


11/2/2012

LGE and KU Stipulation and Recommendation with Signature Pages


11/1/2012

EKPC's Proof of Publications


10/29/2012

PJM Response to Commission Staff's Request to 110712 Hearing


10/25/2012 1:45:51 PM

COMMISSION STAFF’S NOTICE OF INFORMAL CONFERENCE


10/25/2012

KU and LGE Response to EKPC's Info Request dtd 101012


10/17/2012 12:54:25 PM

COMMISSION STAFF’S NOTICE OF INFORMAL CONFERENCE


10/12/2012

EKPC Updated Baseline RTEP Integration Report


10/10/2012

East Kentucky Power Cooperative, Inc.'s Information Requests to KU and LG&E


10/3/2012

Attorney General's Comments in Lieu of Testimony


10/2/2012

Comments of Gallatin Steel Company


10/1/2012 10:15:58 AM

Commission Staff's Notice of Informal Conference


10/1/2012

LGE and KU Testimonies of Lonnie Bellar and Edwin Staton


9/28/2012 2:16:09 PM

Order Entered: (1) The joint motion of EKPC and LG&E/KU for an extension of time until October 1, 2012 for LG*E/KY to file testimony or comments is granted. (2) The motion of the AG for an extension of time to file testimony or comments two days after the filing of testimony of comments by LG&E/KY is granted. (3) The procedural schedule appended to the Commission's September 4, 2012 Order is modified as provided in the Appendix attached hereto which shall be followed in this case.


9/24/2012

Joint Motion for Extension of Time


9/21/2012

Attorney General's Motion for Extension of Time


9/14/2012 9:39:46 AM

Order Entered: 1. A hearing in this matter shall be held on Wednesday, November 7, 2012, at 10:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission’s offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. East Kentucky Power Cooperative, Inc. shall publish notice of this hearing in compliance with KRS 424.300. 3. The official record of these proceedings shall be by video only. 4. Any request to cancel or postpone this hearing shall be made by motion filed with the Commission at least one week before the hearing is scheduled to commence.


9/10/2012

EKPC's Supplemental Response to AG's Request 31 of Initial DR


9/4/2012 1:32:10 PM

Order Entered: (1) LG&E and KU's motion to delay the date set forth in the August 7, 2012 Order for filing intervenor testimony or comments is granted. (2) The procedural schedule set forth in the Appendix shall be followed in this case.


8/17/2012

Joint Motion to Modify Procedural Schedule


8/15/2012

EKPC's Response to 080712 Order


8/7/2012 10:05:08 AM

Order Entered: LG&E and KU’s motion to revise the procedural schedule is granted. Intervener testimony or comments shall be filed no later than 14 days after East Kentucky files the studies discussed in the findings above. All other dates set forth in the procedural schedule appended to the Commission’s June 7, 2012 Order are suspended and shall be reestablished by subsequent Order


8/2/2012

EKPC Response to Motion to Modify Procedural Schedule


7/27/2012

KU and LG&E's Motion to Modify Procedural Schedule


7/24/2012

East Kentucky Power Cooperative, Inc.'s Response to Commission Staff's Second Request for Information dated July 11, 2012


7/24/2012

EKPC Response to KU and LGE Data Requests


7/11/2012 2:51:36 PM

COMMISSION STAFF’S SECOND REQUEST FOR INFORMATION TO EAST KENTUCKY POWER COOPERATIVE, INC.


7/11/2012

KU and LGE Supplemental DR to EKPC


6/28/2012

EKPC Response to KU and LGE 1st Request for Info dtd 061512


6/28/2012

EKPC Response to AGs Initial DR dtd 061512


6/28/2012

EKPC Response to Commission Staffs 1st Request for Info dtd 061512


6/18/2012

EKPC Counsel Notice of Change of Practice Affiliation and Change of Address


6/18/2012

Letter Advising that Gallatin Steel will not ask questions in first round of discovery.


6/15/2012 1:39:25 PM

Commission Staff's First Information Request to East Kentucky Power Cooperative, Inc.


6/15/2012

Attorney General's Initial Data Requests


6/15/2012

KU and LG&E's Data Requests to EKPC


6/13/2012 3:30:54 PM

Order Entered: (1) The joint petition of LGE and KU to intervene is granted. (2) LGE and KU shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. (3) Should LGE and KU file documents of any kind with the Commission in the course of these proceedings, LGE and KU shall also serve a copy of said documents on all other parties of record.


6/7/2012 1:04:17 PM

Order Entered: (1) The procedural schedule set forth in the Appendix to this Order shall be followed in this proceeding. (2) All requests for information and responses shall be appropriately bound, tabbed, and indexed and the original and ten copies shall be filed with the Commission, with copies to all parties of record. (3) Any party filing testimony shall file an original and ten copies with the Commission, with copies to all parties of record. (4) At any public hearing in this matter, neither opening statements nor summarization of direct testimony shall be permitted. (5) Any objections or motions relating to discovery or procedural dates shall be filed upon four business days' notice or the filing party shall explain, in writing, why such notice was not possible. (6) Motions for extensions of time with respect to the schedule herein shall be made in writing and will be granted only upon a showing of good cause. (7) Nothing contained herein shall prevent the Commission from entering further Orders in this matter.


6/4/2012 12:18:19 PM

Order Entered: (1) The petition of Gallatin to intervene is granted. (2) Gallatin shall be entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. (3) Should Gallatin file documents of any kind with the Commission in the course of these proceedings, Gallatin shall also serve a copy of said documents on all other parties of record.


6/4/2012 12:17:37 PM

Order Entered: (1) The motion of PJM to intervene is granted. (2) PJM shall be entitled to the full rights of a party and shall be served with the Commission’s Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. (3) Should PJM file documents of any kind with the Commission in the course of these proceedings, PJM shall also serve a copy of said documents on all other parties of record.


6/1/2012

EKPC's Sur Reply to Petition for Full Intervention filed by LG&E and KU


5/29/2012

LG&E and KU's Reply to Response and Objection of EKPC's Petition for Full Intervention


5/22/2012

EKPC's Response and Objections to Petition for Full Intervention filed by LG&E and KU


5/18/2012

Gallatin Steel's Petition to Intervene


5/17/2012 2:37:53 PM

Order Entered: that the motion is granted, and the Attorney General is hereby made a party to these proceedings.


5/15/2012

PJM Interconnection, LLC Motion for Full Intervention


5/14/2012 1:42:21 PM

No deficiency letter


5/10/2012

LG&E and KU's Petition to Intervene


5/4/2012

AG's Motion to Intervene


5/3/2012 4:05:20 PM

Acknowledge Receipt of Filing


5/3/2012

EKPC's Application to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, L.L.C.


5/3/2012

EKPC's Application to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, L.L.C.