Kentucky Public Service Commission


View Case Filings for: 2022-00292


Case Number:2022-00292
Service Type:Gas
Filing Date:8/29/2022
Category:Regular
Utilities:

Atmos Energy Corporation


Electronic Case
Case Nature:

ELECTRONIC APPLICATION OF ATMOS ENERGY CORPORATION FOR APPROVAL OF SPECIAL CONTRACT PURSUANT TO ITS ECONOMIC DEVELOPMENT RIDER









Case Filings
FilingDocuments
2/22/2023 3:20:21 PM

Order Entered: 1. Atmos’s petition for confidential treatment is denied. 2. The designated material denied confidential treatment by this Order is not exempt from public disclosure and shall be placed in the public record and made available for public inspection. 3. If Atmos objects to the Commission's determination that the requested material not be granted confidential treatment, it must seek either rehearing pursuant to KRS 278.400 or judicial review of this Order pursuant to KRS 278.410. Failure to exercise either of these statutory rights will be deemed as agreement with the Commission's determination of which materials should be granted confidential treatment. 4. Within 30 days of the date of service of this Order, Atmos shall file a revised version of the designated material for which confidential treatment was denied, reflecting as unredacted the information that has been denied confidential treatment. 5. The designated material for which Atmos’s request for confidential treatment has been denied shall neither be placed in the public record nor made available for inspection for 30 days from the date of service of this Order in order to allow Atmos’s to seek a remedy afforded by law.


10/31/2022 3:09:31 PM

Final Order Entered: 1. The special contract between Atmos and Matalco is approved effective November 1, 2022.4° 2. For future EDR contracts, Atmos shall file specific detailed support for the Administrative Case 327 Order, Finding 5 showing that Atmos has adequate system capacity to serve the proposed customer and that the load served will not cause it to fall below a reserve margin considered essential for system reliability. 3. By March 31 of each year, Atmos shall file an annual report with the Commission detailing, for the prior calendar year, revenues received from Matalco and the marginal costs associated with serving Matalco throughout the term of the special contract. 4. During any rate proceedings filed by Atmos subsequent to the effective date of the special contract with Matalco, and during a period when Atmos still has an active EDR contract, Atmos shall demonstrate through a detailed cost-of-service analysis that its non-EDR ratepayers are not adversely affected by the EDR rate to Matalco and any other EDR customers that may be on the Atmos system at that time. 5. Atmos shall file by March 31 of each year a report with the Commission providing, for the prior calendar year, the information shown in the Appendix to this Order. 6. Any documents filed pursuant to Ordering paragraphs 3 and 5 of this Order shall reference the number of this case and shall be retained in the post-case correspondence file for this proceeding.


10/12/2022 1:40:17 PM

Atmos Energy Responses to Staff DR Set 1 2022-00292


Eric Wilen Atmos Energy Corporation

2022-00292_Atmos_Responses_to_Staff_Set_1.pdf

2022-00292 Atmos Responses to Staff Set 1

Read1st_-_Atmos_Responses_to_Staff_Set_1_Cover_Letter_2022-00292.pdf

Read1st - Atmos Responses to Staff Set 1 Cover Letter 2022-00292

9/26/2022 7:49:06 AM

Data Request


9/19/2022 3:30:25 PM

Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. Any party filing a paper with the Commission shall file an electronic copy in accordance with the electronic filing procedures set forth in 807 KAR 5:001, Section 8. Electronic documents shall be in portable document format (PDF), shall be searchable, and shall be appropriately bookmarked. The Commission directs the parties to the Commission’s July 22, 2021 Order in Case No. 2020-00085¹ regarding filings with the Commission. 3. As set forth in 807 KAR 5:001, Section 4(11)(a), a person requesting permissive intervention in a Commission proceeding is required to demonstrate either (1) a special interest in the proceeding that is not adequately represented in the case, or (2) that the person requesting permissive intervention is likely to present issues or develop facts that will assist the Commission in fully considering the matter without unduly complicating or disrupting the proceedings. Therefore, any person requesting to intervene in a Commission proceeding must state with specificity the person’s special interest that is not otherwise adequately represented, or the issues and facts that the person will present that will assist the Commission in fully considering the matter.


8/29/2022 4:52:37 PM

Atmos Energy Matalco EDR Application 2022-00292


Eric Wilen Atmos Energy Corporation

Read1st_-_Matalco_EDR_Application_Filing_Cover_Letter.pdf

Read1st - Atmos Energy Matalco EDR Application Filing Cover Letter

8/24/2022 9:48:31 AM

20220824_PSC Acknowledgment Letter.pdf


8/23/2022

Atmos Energy Corporation Notice of Intent to File an Application for an Economic Development Special Contract Using Electronic Filing Procedures


20220823_Atmos Energy Corporation Notice of Intent and Election.pdf

Atmos Energy Corporation Notice of Intent and Election