View Case Filings for: 2019-00417
Service Type:Electric
Filing Date:1/17/2020
Category:Regular
Utilities:
Big Rivers Electric Corporation
Electronic Case
Case Nature:
345 kV Transmission Line in Meade County, Kentucky
Case Filings | |
---|---|
Filing | Documents |
11/14/2022 9:25:24 AM
Order Entered: 1. BREC’s motion for confidential treatment is granted. 2. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for an indefinite period or until further Order of this Commission. 3. Use of the designated material granted confidential treatment by this Order in any Commission proceeding shall comply with 807 KAR 5:001, Section 13(9). 4. BREC shall inform the Commission if the designated material granted confidential treatment by this Order becomes publicly available or no longer qualifies for confidential treatment. 5. If a nonparty to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, BREC shall have 30 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If BREC is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. |
|
3/15/2021 3:51:59 PM
Order Entered: 1. BREC’s motion for confidential treatment is granted. |
|
5/1/2020 8:27:24 AM
Order Entered: 1. BREC is granted a CPCN to construct and operate the proposed transmission facilities as set forth in its application. 2. BREC shall file a survey of the final location of the transmission facilities after any modifications are finalized as authorized herein and before construction begins.3. BREC shall file "as-built" drawings or maps within 60 days of the completion of the construction authorized by this Order. 4. BREC's request for authority to move the switching station from the location shown on the maps filed with the application is granted on the condition that the switching station is not moved onto different property owners. 5. BREC's request for authority to move the proposed transmission line up to 500 feet in either direction of the centerline shown on the route maps filed with the application is granted on the condition that the transmission line remains inside the approved route corridor. 6. BREC shall immediately notify the Commission upon knowledge of any material changes to the scope of the transmission projects, including, but not limited to, increase in cost, any significant delays in the construction of the transmission line, or any changes in the route of the transmission line or the location of the substations. |
|
3/30/2020 10:37:46 AM
Big Rivers Electric Corporations responses to the Public Service Commission Staffs Second Request for Information Tyson Kamuf Big Rivers Electric Corporation |
|
3/20/2020 12:33:22 PM
Order Entered: 1. BREC's motion to convert this proceeding to an electronic case is granted. 2.Electronic filing procedures shall be followed pursuant to 807 KAR 5:001, Section 8, for all filings in this case. 3. Parties shall upload an electronic version using the Commission’s electronic Filing System. 4. Pursuant to the March 16, 2020 Order in Case No. 2020-00085, parties shall not file an original paper copy of any documents in this proceeding until further order of the Commission. Upon an order lifting the current state of emergency, parties shall file original paper copies of electronic documents filed in this proceeding within 30 days of the lifting of the current state of emergency. 5. The style of this case is revised to read, “Electronic Application of Big Rivers Electric Corporation for a Certificate of Public Convenience and Necessity to Construct a 345 kV Transmission Line in Meade County, Kentucky.” |
|
3/18/2020
Commission Staff's Second Request for Information to Big Rivers Electric Corporation |
|
3/17/2020
Big Rivers Electric Corporation Motion to Convert Case to Electronic |
|
3/9/2020
Big Rivers Electric Corporation Response to Commission Staff First Request for Information |
|
2/24/2020
Commission Staff's First Request for Information to Big Rivers Electric Corporation |
|
1/28/2020
Order Entered: 1. The period during which the Commission must enter a decision as set forth in KRS 278.020(9) is extended from 90 days to 120 days from the date of the filing of the application, which was on January 17, 2020. 2. All parties shall adhere to |
|
1/23/2020
No deficiency letter |
|
1/17/2020
Big Rivers Electric Corporation Application for a Certificate of Public Convenience and Necessity to Construct a 345 kV Transmission Line in Meade County, Kentucky |
|
1/17/2020
Acknowledge Receipt of Filing |
|
11/19/2019
Acknowledge Receipt of Filing |