psc.ky.gov - /pscscf/2011 cases/2011-00162/20110616_Application Exhibits and Appendices/JNV-2 Appendices/Appendix B - Phase II Draft Report - Mill Creek Station/3.0 Studies and Technical Documents/


[To Parent Directory]

5/25/2011 7:36 PM 2241960 (3.01) 41.0803 Validation Report (Rev D).pdf
5/25/2011 7:36 PM 6856014 (3.02) 41.0803.4 Existing Scrubber Upgrade Analysis.pdf
5/25/2011 7:38 PM 2090463 (3.03) 41.0803.4 Existing Scrubber StructuralAsses.pdf
5/25/2011 7:36 PM 81301 (3.04) 41.0809 Auxiliary Electric System.pdf
5/25/2011 7:36 PM 197501 (3.05) 41.0810 Chimney Alternatives.pdf
5/25/2011 7:36 PM 161763 (3.06) 41.0812.1 WFGD System Water Supply.pdf
5/25/2011 7:36 PM 244328 (3.07) 41.0813 Constructability Review.pdf
5/25/2011 7:36 PM 216452 (3.08) 41.0814.1 Materials of Construction.pdf
5/25/2011 7:36 PM 497519 (3.09) 41.0814.2 Sparing and Capacity.pdf
5/25/2011 7:36 PM 641619 (3.10) 41.0814.3 Mill Creek Draft System.pdf
5/25/2011 7:36 PM 274197 (3.11) 41.0814.4 WFGD and Landfill Waste Disposal.pdf
5/25/2011 7:36 PM 483860 (3.12) 41.0814.5 Fly Ash Handling.pdf
5/25/2011 7:36 PM 101180 (3.13) 41.0814.6 Impact of PAC injection.pdf