psc.ky.gov - /tariffs/Electric/Shelby Energy Cooperative, Inc/Cancelled Tariff Pages/2016/


[To Parent Directory]

7/24/2018 7:12 AM <dir> Average Underground Cost Differential
4/24/2018 2:38 PM <dir> Cogeneration and Small Power Production
4/24/2018 2:38 PM <dir> Direct Load Control Program-Commercial
4/24/2018 2:38 PM <dir> Direct Load Control Program-Residential
4/24/2018 2:38 PM <dir> DSM-2-Touchstone Energy Home
4/24/2018 2:38 PM <dir> DSM-5-Commercial and Industrial Advanced Lighting Program
4/24/2018 2:38 PM <dir> DSM-6-Industrial Compressed Air Program
4/24/2018 2:38 PM <dir> DSM-Appliance Recycling Program
4/24/2018 2:38 PM <dir> DSM-Button-Up Weatherization Program
4/24/2018 2:38 PM <dir> DSM-CARES Program
4/24/2018 2:38 PM <dir> DSM-ENERGY STAR Appliance Program
4/24/2018 2:39 PM <dir> DSM-Heat Pump Retrofit Program
4/24/2018 2:39 PM <dir> Economic Development Rider
4/24/2018 2:39 PM <dir> Interruptible Service
4/24/2018 2:39 PM <dir> Off-Peak Retail Marketing Rate
4/24/2018 2:39 PM <dir> Rate 1-General Service
4/24/2018 2:40 PM <dir> Rate 10-Optional Residential, Church, and School Service
4/24/2018 2:40 PM <dir> Rate 11-General Service
4/24/2018 2:40 PM <dir> Rate 12-Residential Service
4/24/2018 2:40 PM <dir> Rate 15-Prepay Service
4/24/2018 2:39 PM <dir> Rate 2-Large Power Service
4/24/2018 2:40 PM <dir> Rate 22-Optional T-O-D Demand
4/24/2018 2:40 PM <dir> Rate 23-Voluntary Interruptible Service
4/24/2018 2:40 PM <dir> Rate 24-Renewable Energy Program
4/24/2018 2:39 PM <dir> Rate 3-Outdoor and Street Lighting
4/24/2018 2:40 PM <dir> Rate 33-Special Outdoor Lighting Service
4/24/2018 2:39 PM <dir> Rate 4-Standby Power Rate
4/24/2018 2:39 PM <dir> Rate 5-Cable Television Attachment
4/24/2018 2:40 PM <dir> Schedule B1-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule B2-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule B3-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule C1-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule C2-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule C3-Large Industrial Rate
4/24/2018 2:41 PM <dir> Schedule ES-Environmental Surcharge
4/24/2018 2:41 PM <dir> Schedule NM-Net Metering
4/24/2018 2:41 PM <dir> Touchstone Energy Home Program
4/24/2018 2:41 PM <dir> Touchstone Energy Manufactured Home Program
4/24/2018 2:41 PM <dir> Underground Cost Differential