Kentucky Public Service Commission


View Case Filings for: 2017-00195


Case Number:2017-00195
Service Type:Electric
Filing Date:6/16/2017
Category:Regular
Utilities:

Louisville Gas and Electric Company


Electronic Case
Case Nature:

138 kV Electric Transmission Line Located in Jefferson County









Case Filings
FilingDocuments
8/31/2017 12:45:04 PM

Final Order Entered: 1. LG&E is granted a CPCN to relocate, construct, and operate approximately 6,000 feet of 138-kV electric transmission line on the property of Waste Management as set forth in its application. 2. The proposed relocation and construction of the gas pipeline on the property of Waste Management as set forth in the application is properly classified as an ordinary extension of an existing system in the usual course of business and no CPCN is required. 3. LG&E shall file a survey of the final location of the relocation of the electric transmission line if there are any proposed modifications before construction begins. 4. LG&E shall file "as built" drawings or maps within 60 days of the completion of the construction of the electric transmission line authorized by this Order. 5. Future applications filed by LG&E containing references to construction projects being exempt from the CPCN requirements under KRS 278.020(1) shall include sufficient details to demonstrate the exemption.


8/11/2017 9:46:04 AM

Louisville Gas and Electric Company Request for the Commission to issue an Order


Christopher M. Garrett Louisville Gas and Electric Company

Read_1st-LGE_Request.pdf

Read First - Filing Letter

8/8/2017 2:21:46 PM

Statement of Electronic Transmission Capabilities


Edward T. Depp Waste Management of Kentucky, LLC

8/8/2017 9:24:54 AM

Order Entered: 1. The motion of Waste Management to intervene is granted. 2. Waste Management shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Waste Management shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Waste Management shall adhere to the procedural schedule set forth in the Commission's Order dated July 11, 2017, and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, Waste Management shall file a written statement, with a copy to parties of record, that: a. Affirms that its agent, possesses the facilities to receive electronic transmissions; b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


7/25/2017 10:20:42 AM

LGE Responses to PSC Staffs First Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company

00-Read_1st_Cover_Letter.pdf

Read 1st - Cover Letter

01-2017-00195_ResponsesToFirstRdDR_PSC.pdf

LG&E Responses to PSC Staff's 1st Req for Infor

7/17/2017 2:19:14 PM

Data Request


7/14/2017 1:16:04 PM

Motion for Full Intervention


Edward T. Depp Waste Management of Kentucky, LLC

Read_1st_Letter.PDF

Read 1st Letter

7/11/2017 3:22:38 PM

Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed and indexed, and shall include the name of the witness responsible for responding to the questions related to the information provided, with the original and six copies in paper medium and an electronic version to the Commission. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. Careful attention shall be given to copied material to ensure that it is legible.


6/26/2017 10:15:08 AM

20170626_PSC No Deficiency Letter.pdf


6/16/2017 12:28:07 PM

LGE Application for a CPCN for the relocation and construction of a 138 kV electric transmission line located on Waste Managements property in Jefferson County, Kentucky, at the request of Waste Management..


Rick E. Lovekamp Louisville Gas and Electric Company

00-Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

5/15/2017 10:19:52 AM

20170515_PSC No Deficieny Letter for Notice of Intent.pdf


5/9/2017 10:58:09 AM

Order Entered: 1. All future correspondence or filings in connection with this case shall reference the above case number. 2. All documents submitted in this proceeding shall comply with the Commission’s rules of procedure as set forth in 807 KAR 5:001 and any deviation from these rules shall be submitted in writing to the Commission for consideration. 3. Any party filing a paper shall upload an electronic version using the Commission's E-Filing System and shall file an original and six copies in paper medium, except that only two copies in paper medium shall be filed of maps, plans, specifications, and drawings pursuant to 807 KAR 5:001, Section 15(2)(d). 4. Any request for confidential treatment of material submitted shall conform to the requirements in 807 KAR 5:001(13). 5. Materials submitted to the Commission which do not comply with the rules of procedure or that do not have an approved deviation are subject to rejection pursuant to 807 KAR 5:001, Section 3.


5/9/2017

Louisville Gas and Electric Company Notice of Intent to File Application for a CPCN for the Construction of Electric Transmission Line Using Electronic Filing Procedures


20170509_Louisville Gas and Electric Company Notice of Intent and Election.pdf

Louisville Gas and Electric Company Notice of Intent and Election